SourcingAI
Try for free
Powered by Made-in-China.com
Climbing Formwork System Ringlock Scaffolding for Construction
US$750.00-1,000.00
100 Meters

Product profile

Customization

Available

After-sales Service

24 Hours

Warranty

1year

Model NO.

Customized

Material

Q355b

Surface Treament

Electrostatic Powder Coating / Paint / Hot-DIP Gal

Lifting Speed

Approx. 120 mm/Min

HS

7308400000

Application

Exterior Construction of High-Rise Residential Bui

Transport Package

Pallet

Trademark

GOWE

Origin

China Tianjin

HS Code

7308400000

Production Capacity

200PCS/Per Year

Key features

All-steel modular design, easy assembly & disassembly, high recycling times
Electric hoist + PLC synchronous control, stable lifting; multi-safety protection: anti-fall, anti-overturning, overload alarm
Serve the whole construction cycle: main structure, external insulation and curtain wall
Fully enclosed punched steel mesh, prevent falling objects, good site safety & appearance
Flexible bracket layout, adaptable to corners, bay windows and irregular facades
Save a large amount of steel tubes and couplers, reduce tower crane occupancy

Company profile

Tianjin Gowe New Formwork Co., Ltd.
High Repeat Buyers ChoiceFast DeliveryQuality AssuranceR&D Capabilities
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 10 Year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤0.04h

About Our Factory & Business Background

AddressNo. 36, Sijing Road, Panzhuang Industrial Park, Ninghe District, Tianjin, China
Plant Area46967 square meters
Registered Capital300,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1
Supply Chain Partners20

Our Production Capability & Technical Expertise

Main ProductsScaffolding, Aluminium Formwork, Wooden Formwork, Steel Frame Formwork, Steel Structure, Construction Materials, Tunnel Trolley, Bridge and Tunnel Products
QA/QC inspectors20 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers10 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2014-06-20
Main MarketsSoutheast Asia/ Mideast
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO45001:2018, ISO14001

Product Q&A

Q:Is tower crane required during climbing?
A:
No tower crane needed for lifting. It climbs synchronously by electric hoists. Crane is only required for initial assembly.
Q:What components are included in one set?
A:
Main vertical frame, guide rail, horizontal support truss, all-steel protective mesh, steel walk planks, wall-attached supports, anti-fall & anti-tilt assembly, synchronous control system, electric hoists, pins, bolts and fasteners.
Q:Can you customize according to drawings? Are corner, curved and bay window sections available?
A:
Custom design based on construction drawings is supported. Non-standard parts for corners, curved facades, bay windows and elevator shafts can be supplied.

Send Inquiry

*To:Tianjin Gowe New Formwork Co., Ltd.Tianjin Gowe New Formwork Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like