Powered by Made-in-China.com
Tecon Table Formwork System with Slab Formwork Brace, H20 Beam, Concrete Plywood Formwork for Construction
US$70.00
100-999 Square Meters
US$60.00
1,000-9,999 Square Meters
US$50.00
10,000+ Square Meters
Product profile
Customization
AvailableAfter-sales Service
YesWarranty
I BeamModel NO.
I BeamCertification
ISO, ROHS, CEMaterial
TimberType
Beam FormworkProduct Name
Wood Beam FormworkKeywords
Timber Beam FormworkWood Species
Pine, Spruce or as RequestBeam Height
200mm or as RequestLength
1.8m, 2.9m, 3.0m, 3.3m, 3.9m, 4.9m, 5.9mChord Height
40 mm or as RequestChord Width
80 mm or as RequestColor
Coating with PaintingGlue
Waterproof Phenolic WBPCertificates
CE/ISOOEM & ODM Custom
AcceptSample
AcceptLogo Custom
AcceptTransport Package
Standard Shipping Packaging or CustomizedSpecification
Standard Specification or CustomizedTrademark
GREEN CONSTRUCTIONOrigin
Nantong, ChinaProduction Capacity
500000 Tons/YearKey features
Customizable Dimensions: Beam height, chord height, and length can be customized as per request.
Durable Timber Material: Made from Pine or Spruce with waterproof phenolic WBP glue for longevity.
High Load-Bearing Capacity: Ensures precise concrete shaping and structural stability under pressure.
Versatile Application: Suitable for residential, commercial, bridges, tunnels, and high-rise buildings.
Cost-Effective Reusability: High reuse rates and robust durability lead to significant cost savings.
Fair-Faced Finish: Produces high-quality concrete finishes for demanding architectural designs.
Lightweight Design: Ergonomic design accelerates installation and simplifies on-site handling.
Eco-Friendly Sourcing: Sustainable timber sourcing supports green construction practices.
Company profile
Business Type: Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Flexible customization CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤1.39h
About Our Factory & Business Background
AddressRoom C-1910, Oasis International Business Building, No. 588, Yonghe Road, Chongchuan District, Nantong City
Registered Capital20,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity10 Pcs
Supply Chain Partners3
Our Production Capability & Technical Expertise
Main ProductsCold Panel, Steel Support, For ConstructionPurposes Wooden Formwork, Wooden I-beam
Our Industry Experience & Global Business Record
Year of Establishment2015-06-30
Main MarketsSouth America, Southeast Asia/ Mideast
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff1
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO14001, ISO45001:2018
Product Q&A
Q:How do I get a manufacturing quote?
A:
We respond to your RFQ with a quote within 24 business hours. If a quote is delayed, we will notify you as soon as possible. We provide instant pricing and delivery times in our quotes.
Q:Who is responsible for my project?
A:
Each project is assigned a technical sales manager and a mechanical engineer who will be involved from your RFQ to the delivery of the timber beam formwork.
Q:What is your minimum order quantity?
A:
GREEN CONSTRUCTION does not have a minimum order quantity requirement. Our services can support you from initial quotation to custom production and inspection, and shipment.
Q:How much import tax do I need to pay for my goods?
A:
For different countries, we apply different rules. Import duties vary greatly from country to country and depend on the type of goods being imported. Most countries in the world adhere to the international Harmonized System (HS) codes.
Q:What are the available wood species?
A:
We offer Pine or Spruce, or as requested by the customer.
Send Inquiry
*To:
Jiangsu Green Bio-Environmental Protection Technology Co., Ltd.
Jiangsu Green Bio-Environmental Protection Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Formwork System for Green Slab with Powder Coating Finish
US$85.00-110.00
250 Square Meters(MOQ)
H20 Wood Beam Supporting Construction Site Shuttering Panel Concrete Formwork System
US$80.00-120.00
500 Square Meters(MOQ)
Complete Aluminum Wall and Slab Formwork System with Accessories for Concrete Structures
US$5.00-50.00
180 Square Meters(MOQ)
H20 Timber Beam Modular Wall Slab Shuttering Concrete Formwork System
US$80.00-120.00
500 Square Meters(MOQ)
Durable Column Formwork Systems with Premium Formwork Slab Panels
US$85.00-110.00
250 Square Meters(MOQ)
Lianggong H20 Timber Beam Formwork System for Concrete
US$5.60-5.80
1,000 Meters(MOQ)
Reusable ABS Plastic Formwork System for Concrete Wall Slab Column Beam Construction with Easy Installation and High Strength
US$5.00-50.00
180 Square Meters(MOQ)
Building Forming Concrete Timber Beam Slab Formwork Shoring System
US$65.00-88.00
100 Square Meters(MOQ)
Modular Plastic Formwork System for Concrete Wall Slab Beam Construction Projects
US$5.00-50.00
180 Square Meters(MOQ)
GF Table Formwork System for Concrete Slabs
US$100.00
500 Pieces(MOQ)
Premium Durable Concrete Formwork System with Plywood & Aluminum
US$75.00-129.00
100 Square Meters(MOQ)
Durable H20 Beam Formwork System with on-Site Technical Support
US$599.00-899.00
1 Piece(MOQ)
Customized Modern H20 Model Timber Beam Formwork System for Construction
US$87.00-97.00
50 Square Meters(MOQ)
Lightweight Concrete Plastic Formwork System with High Durability and Easy Setup Labor Independence
US$5.00-50.00
180 Square Meters(MOQ)
Concrete Steel Panel Building Material Slab Table Construction Formwork System
US$100.00
500 Pieces(MOQ)
Bamboo Plywood Slab Beam Formwork System
US$100.00
500 Pieces(MOQ)
Innovative H20 Timber Beam Formwork System with Flexible Design Options
US$599.00-899.00
1 Piece(MOQ)
Lianggong Factory Supplier H20 Timber Beam Formwork System for Concrete Construction
US$88.68-188.68
200 Sets(MOQ)
Steel Table Formwork System for Slab Concrete Construction
US$78.00-288.00
10 Pieces(MOQ)
Table Formwork System with Q355b Raw Material
US$100.00
500 Pieces(MOQ)



















