SourcingAI
Try for free
Powered by Made-in-China.com
Early Stripping Panel Props Efficient Slab Concrete Formwork System Easy Assemble
US$80.00-120.00
500 Square Meters

Product profile

Customization

Available

After-sales Service

One Year Guarantee

Warranty

One Year Guarantee

Model NO.

MB1812; MB189; MB186; MB1212; MB129; MB126

Certification

Imts

Material

Steel

Type

Slab Formwork

Components

Panel and Props

Advantage

Easily Assembled, Reusable, One-Time Pouring

Usage

60 Times

Color

Green/Oranger

MOQ

40 Feet Container

Transport Package

Standard Export Packing

Specification

standard export packing

Trademark

GF

Origin

China

HS Code

73084000

Production Capacity

2000tons/Year

Key features

One Year Guarantee: Comprehensive warranty coverage for one year on all mechanical components.
Reusable Design: Panels and props designed for up to 60 reuse cycles for cost efficiency.
Easy Assembly: System features early-stripping mechanism for quick and simple installation.
Durable Surface Treatment: Electrophoresis, hot-dip galvanized, and power coating for long-lasting protection.
Global Market Presence: Successfully deployed in over 500 projects across USA, Europe, Asia, and South America.
Free Engineering Proposal: Detailed structural proposals provided free of charge based on client drawings.
Sample Availability: Samples can be offered to clients for product evaluation and verification.
Customization Options: Customized components available including panel and prop configurations.

Company profile

Shandong Prima Construction Formwork Co., Ltd.
Importers and ExportersSelf-brandedPatents AwardedExhibition Experience
Business Type: Manufacturer/FactoryExport Year: 2012-02-01Nearest Port: QingdaoAverage Response Time: ≤3.81hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, DAP, CIP, FCA

AI-Powered supplier vetting

SummaryThe supplier specializes in the production and export of building materials, offering customization services and having a strong R&D focus with new product development in the past year. They provide ODM and OEM services for known brands and engage in trade shows. Financial data is available for the past three years, but the status of fire drills and environmental assessments is unknown. Their production facilities are well-equipped, but they lack overseas warehouses and showrooms. Quality assurance processes are in place, although there is limited information on certifications.
Supplier typeThe supplier is involved in the production, sales, and leasing of building templates and scaffolding, as well as bamboo and wood products, and engages in import and export activities.
After-Sales capabilityThe supplier offers a clear procedure for handling customer complaints and provides a range of overseas services, including debugging, maintenance, and training.
Financial creditThe supplier has financial data available for the past three years, indicating some level of financial transparency.
R&D capabilityThe supplier has demonstrated innovation through new product development in the past year and offers ODM services.
Production capacityThe supplier has a comprehensive range of production equipment and maintains an annual productivity of 150,000 square meters in slab formwork.
Customization capabilityThe supplier provides extensive customization options, including full customization and minor customization from designs or samples.

Product Q&A

Q:Are you a trading company or manufacturer?
A:
We are a factory! We are the first factory in China to produce pane-prop with early stripping mechanism formwork system.
Q:Do you provide engineer service?
A:
Yes, we could make the detailed proposal as per your structure drawing for free.
Q:Do you provide samples?
A:
Yes, we could offer the sample.
Q:Where has your product been sold?
A:
Till now, Green Formwork has been used for more than 500 projects in USA, Canada, Australia, Czech republic, U.A.E, Iraq, Malaysia, Indonesia, Philippines, Thailand, Burma, Cambodia and South America.
Q:What is the lead time for production?
A:
Peak Season Lead Time is 1-3 months, while Off Season Lead Time is within 15 workdays.

Send Inquiry

*To:Shandong Prima Construction Formwork Co., Ltd.Shandong Prima Construction Formwork Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Early Stripping Head Concrete Formwork System
Made-in-China.com
Reusable Formwork Systems for Easy and Efficient Concrete Projects
Made-in-China.com