Powered by Made-in-China.com
GF Early Stripping Head Formwork Construction
US$100.00
500 Pieces
Product profile
Customization
AvailableWarranty
One YearCertification
ISO, CEModel NO.
GFMaterial
SteelType
Slab FormworkPayment Term
30% Deposit,70% Should Be Paid Before ShipmentPanel and Prop Raw Material
Q355bTrade Mark
GFColor
Green/Customized ColorHS
8480600000Transport Package
BundleTrademark
GFOrigin
ChinaHS Code
8480600000Production Capacity
50000piece Per YearKey features
Early Stripping Mechanism: Shortens construction period and reduces panel count for lower transportation and storage costs.
High Stability System: Independent table with 6-direction moving restriction ensures a very stable construction environment.
Efficient Installation: Simple set and removal with few components; a team of 3-4 workers can handle complex slab structures.
Customizable Color: Available in Green or customized colors to meet specific project requirements.
Certified Quality: Meets ISO and CE standards for reliable performance in concrete construction projects.
Durable Steel Material: Constructed from Q355b steel with plywood panels for robust and long-lasting usage.
Company profile
Business Type: Manufacturer/FactoryExport Year: 2012-02-01Nearest Port: QingdaoAverage Response Time: ≤7.28hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, DAP, CIP, FCA
AI-Powered supplier vetting
SummaryThe supplier produces, sells, and leases building formwork, scaffolding, bamboo and wood-based panels, and related products, with ordinary-goods import and export in its stated scope. It demonstrates broad customization, recent new-product activity, ODM, OEM for recognized brands, and SDK availability. Production evidence includes multiple metal-processing and welding facilities and annual slab-formwork output of 150,000 square meters, while quality controls include one inspector, complaint procedures, quality assurance, and raw-material traceability. Service capability is supported by overseas installation, debugging, maintenance, repair, and training offerings in Belgium, with peak- and off-season lead times within 15 workdays. However, no overseas warehouse, showroom, agent, or branch is available. Financial records are identified for 2021–2023, but their results are not provided. Certification status, customer cases, and the status of environmental and fire-drill documentation remain insufficiently...
Supplier typeThe supplier is a manufacturer, seller, and leasing provider of building formwork, scaffolding, bamboo plywood, wood plywood, wood-plastic panels, and other bamboo and wood products. Its listed facilities include cutting, laser processing, punching, shearing, shot blasting, electrophoresis, and welding equipment, supporting classification as a building-material and formwork manufacturing supplier.
After-Sales capabilityThe supplier offers overseas debugging, maintenance, repair, training, and equipment installation in Belgium, and maintains written procedures and records for service assessment, corrective actions, and customer complaints. However, it has no overseas warehouse, showroom, agent, or branch, which limits local service infrastructure.
R&D capabilityThe supplier reports new products during the past year, provides ODM services, offers customization from samples and designs, and has an available SDK. It also reports OEM service for recognized brands, providing explicit evidence of product-development and technical collaboration capability.
Production capacityThe supplier reports annual slab-formwork productivity of 150,000 square meters and a facility base covering electrophoresis, cutting, laser cutting, punching, hydraulic shearing, shot blasting, forklift handling, and welding. Reported lead times are within 15 workdays in both peak and off-season, although capacity beyond the stated product and output information is not evidenced.
Customization capabilityBoth R&D and design-capability records list customization from samples, customization from designs, full customization, minor customization, and flexible customization. This is explicit evidence of a broad customization offering.
Product Q&A
Q:What is the warranty period for this formwork?
A:
We provide a one-year warranty for our GF Early Stripping Head Formwork.
Q:What materials are used in the formwork construction?
A:
The formwork is made of steel (Q355b) with plywood panels on the frame.
Q:Is the color of the formwork customizable?
A:
Yes, the formwork is available in Green or can be customized to other colors.
Q:What certifications does this product have?
A:
The product holds ISO and CE certifications.
Q:How many workers are needed to install the formwork?
A:
A team of 3-4 workers can quickly and easily set up and remove the panels.
Send Inquiry
*To:
Shandong Prima Construction Formwork Co., Ltd.
Shandong Prima Construction Formwork Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Ceiling Formwork with Early Stripping Head for Concrete Construction Project
US$100.00
500 Pieces(MOQ)
Aluminium Formwork Systems with Early Stripping Head for Rapid Construction
US$100.00-120.00
500 Square Meters(MOQ)
Early Stripping Head Steel Panel Formwork for Concrete Construction
US$100.00
500 Pieces(MOQ)
Early Stripping Head Formwork System for Faster and More Efficient Construction Cycles
US$100.00-120.00
500 Square Meters(MOQ)
Doka Q355 Steel Metal Frame Aluminium Plastic Timber Beam Early-Stripping Drop Head Slab Concrete Formwork for Construction
US$55.00-60.00
1 Square Meter(MOQ)
Aluminum Slab Formwork Building Material with Early Stripping Head for Concrete Building Construction
US$68.00-90.00
200 Square Meters(MOQ)
Hot GF CE Approved Panel Concrete Table Form Scaffold Construction Early Stripping Formwork
US$80.00-120.00
999 Square Meters(MOQ)
Hot Green ISO Approved GF Concrete Table Form Construction Material Early Stripping Formwork
US$80.00-120.00
999 Square Meters(MOQ)
Popular Excellent-Quality Multifunctional Construction Steel Frame Early Stripping Drop Head Slab Formwork T-Form in Middle East
US$58.00-60.00
10 Square Meters(MOQ)
Early Stripping Drop Head Metal Steel Frame Formwork for Slab Concrete Construction
US$70.00-75.00
1 Square Meter(MOQ)
Doka Supplier Building Material Early Stripping Steel Drop Head Slab Concrete Formwork for Construction
US$70.00-75.00
300 Square Meters(MOQ)
Steel Frame Slab Formwork with Early Stripping Drop Head for Building Construction
US$330.00-350.00
500 Square Meters(MOQ)
GF Early Stripping Head Formwork System
US$100.00
500 Pieces(MOQ)
China Lianggong Skydeck Steel Frame Dropped Head Slab Formwork T-Form for Slab, Floor and Beam Construction with Early Stripping Head
US$44.00-50.00
300 Square Meters(MOQ)



















