SourcingAI
Try for free
Powered by Made-in-China.com
HDG High Load Construction Rapid Steel Scaffolding with Formwork Building Material Rise CE Certify
US$1,580.00-2,400.00
40 Tons

Product profile

Customization

Available

After-sales Service

Quality Warranty

Warranty

Quality Warranty

Model NO.

QSR

Material

Steel

Type

Fixed

Structural Style

Multi-Pole Scaffolding

Framework

Combined Scaffolding

Supporting Mode

Floor Type Scaffolding

Lapping Form

Full Scaffolding

Erection Position

External Scaffolding

Move Method

Attached Lifting Scaffolding

Scaffolding Part Type

Scaffolding Frames

Construction Properties

Building Scaffold

Material.

Q355

Transport Package

Steel Pallet

Specification

4m 3m 2.5m 2m 1m 0.5m

Trademark

QSR

Origin

Qingdao China

HS Code

73084000

Production Capacity

100 Tons/Week

Key features

Hot-Dip Galvanized Finish: Ensures long-lasting protection against rust and corrosion for outdoor use.
RISE and CE Certification: Guarantees quality and safety standards for construction applications.
Rapid Assembly Design: Allows quick setup and teardown to save time and increase job site efficiency.
High Load Capacity: Durable steel construction designed for heavy-duty construction needs.
Customized Material: Available in Q355 steel material to meet specific project requirements.
Professional Technical Assistance: Expert support provided for customer drawings and construction solutions.
Made to Order: All products are customized to offer applicable construction solutions.
Strict Quality Inspection: Each procedure undergoes strict inspection by a professional QC team.

Company profile

Shandong Prima Construction Formwork Co., Ltd.
Importers and ExportersSelf-brandedPatents AwardedExhibition Experience
Business Type: Manufacturer/FactoryExport Year: 2012-02-01Nearest Port: QingdaoAverage Response Time: ≤2.31hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, DAP, CIP, FCA

AI-Powered supplier vetting

SummaryThe supplier specializes in the production and export of building materials, offering customization services and having a strong R&D focus with new product development in the past year. They provide ODM and OEM services for known brands and engage in trade shows. Financial data is available for the past three years, but the status of fire drills and environmental assessments is unknown. Their production facilities are well-equipped, but they lack overseas warehouses and showrooms. Quality assurance processes are in place, although there is limited information on certifications.
Supplier typeThe supplier is involved in the production, sales, and leasing of building templates and scaffolding, as well as bamboo and wood products, and engages in import and export activities.
After-Sales capabilityThe supplier offers a clear procedure for handling customer complaints and provides a range of overseas services, including debugging, maintenance, and training.
Financial creditThe supplier has financial data available for the past three years, indicating some level of financial transparency.
R&D capabilityThe supplier has demonstrated innovation through new product development in the past year and offers ODM services.
Production capacityThe supplier has a comprehensive range of production equipment and maintains an annual productivity of 150,000 square meters in slab formwork.
Customization capabilityThe supplier provides extensive customization options, including full customization and minor customization from designs or samples.

Product Q&A

Q:What certifications does this scaffolding have?
A:
The product holds RISE, SGS, and CE certifications to ensure quality and safety.
Q:Is the scaffolding suitable for outdoor use?
A:
Yes, the hot-dip galvanized (HDG) finish provides long-lasting protection against rust and corrosion.
Q:Can the material be customized?
A:
Yes, the material can be customized, specifically available in Q355 steel.
Q:Do you provide technical support for drawings?
A:
Yes, we offer professional technical assistance for each drawing provided by the customer.
Q:What is the lead time for orders?
A:
Lead time is 1-3 months during peak season and within 15 workdays during the off-season.

Send Inquiry

*To:Shandong Prima Construction Formwork Co., Ltd.Shandong Prima Construction Formwork Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like