Powered by Made-in-China.com
Heavy-Duty Steel Formwork for Concrete Slabs in Construction
US$80.00
500 Square Meters
Product profile
Customization
AvailableAfter-sales Service
Quality WarrantyWarranty
1 YearModel NO.
GFMaterial
Steel Q345Type
Slab FormworkUsage
Concorete FormworkPlace of Origin
Shandong, ChinaProps Surface Finish
Powder Coated+Hot Dipped GalvColor
Customized ColorModel Number
MB1812/MB1809/MB1806/MB1212Design Style
ContemporarySurface Treatment
Hot DIP GalvanizedBrand Name
Green Formwork/QS-GFPacking
PalletAdvantage
Quick AssembleProduct Name
Green FormworkApplication
ConstructionTransport Package
BundleTrademark
GFOrigin
ChinaHS Code
8480600000Production Capacity
150000piece Per YearCompany profile
Business Type: Manufacturer/FactoryExport Year: 2012-02-01Nearest Port: QingdaoAverage Response Time: ≤2.33hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, DAP, CIP, FCA
AI-Powered supplier vetting
SummaryThe supplier specializes in the production and export of building materials, offering customization services and having a strong R&D focus with new product development in the past year. They provide ODM and OEM services for known brands and engage in trade shows. Financial data is available for the past three years, but the status of fire drills and environmental assessments is unknown. Their production facilities are well-equipped, but they lack overseas warehouses and showrooms. Quality assurance processes are in place, although there is limited information on certifications.
Supplier typeThe supplier is involved in the production, sales, and leasing of building templates and scaffolding, as well as bamboo and wood products, and engages in import and export activities.
After-Sales capabilityThe supplier offers a clear procedure for handling customer complaints and provides a range of overseas services, including debugging, maintenance, and training.
Financial creditThe supplier has financial data available for the past three years, indicating some level of financial transparency.
R&D capabilityThe supplier has demonstrated innovation through new product development in the past year and offers ODM services.
Production capacityThe supplier has a comprehensive range of production equipment and maintains an annual productivity of 150,000 square meters in slab formwork.
Customization capabilityThe supplier provides extensive customization options, including full customization and minor customization from designs or samples.
Send Inquiry
*To:
Shandong Prima Construction Formwork Co., Ltd.
Shandong Prima Construction Formwork Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Factory Supply Steel Aluminum Plastic Timber Beam Concrete Formwork for Wall Column and Slab Construction
US$70.00-75.00
100 Square Meters(MOQ)
Flexible Assembly Aluminium Concrete Slab Formwork for Construction
US$80.00-150.00
300 Square Meters(MOQ)
Heavy Duty High Tensile Steel Formwork High Strength Concrete Shuttering High Strength Steel Formwork
US$28.00-100.00
1 Piece(MOQ)
High Strength Adjustable Plastic Timber Beam Steel Aluminum Frame Wall Column Slab Formwork for Concrete Construction
US$75.00-90.00
10 Square Meters(MOQ)
Green Formowrk Light Weight Handset Concrete Slab Formwork for Construction
US$90.00-135.00
500 Square Meters(MOQ)
Lianggong Adjustable Lightweight Plastic Steel Aluminum Wood Wall Column Slab Construction Formwork for Concrete
US$50.00-60.00
100 Square Meters(MOQ)
Doka Supplier H20 Timber Beam Wooden Aluminium Plastic Steel Slab Concrete Formwork for Construction
US$60.00-70.00
1 Square Meter(MOQ)
Steel Column Slab Wall Formwork for Concrete Construction
Negotiable
200 Square Meters(MOQ)
Building Concrete Plastic Steel Aluminum Formwork for Adjustable Reusable Wall Column Slab Systems
US$55.00-65.00
100 Square Meters(MOQ)
China Factory Steel Timber Beam Climbing Tunnel Foundation Concrete Formwork for Wall Column Slab Construction
US$1,000.00-1,500.00
1 Ton(MOQ)
Doka Q355 Steel Metal Frame Aluminium Plastic Timber Beam Early-Stripping Drop Head Slab Concrete Formwork for Construction
US$55.00-60.00
1 Square Meter(MOQ)
Factory Direct Steel Formwork Concrete Construction for Slab/Beam Mold Application Building Material
US$105.00-140.00
100 Square Meters(MOQ)
Factory Direct High Tensile Steel Formwork for Concrete Construction High Strength Steel Formwork
US$28.00-100.00
1 Piece(MOQ)



















