Powered by Made-in-China.com
High Temperature Resistant Steel Early Stripping Green Formwork for Electronics Manufacturing
US$90.00
500 Square Meters
Product specifications
Model
Product profile
Customization
AvailableAfter-sales Service
Quality WarrantyWarranty
Quality WarrantyModel NO.
GFCertification
ISO, CEMaterial
Q345Type
Wall FormworkProduct Name
Green FormworkKeywords
Column FormworkFeature
High-Rise Building Concrete Slab StructureApplication
High-Low Cross Beam and ColumnOEM Custom
NoODM Custom
NoPackage
BundleTransport Package
Standard Packaging or CustomizedSpecification
Standard Specifications or CustomizedTrademark
GFOrigin
Shandong, ChinaProduction Capacity
150000sqare Meter/YearKey features
High Durability & Reusability: Withstands hundreds of pour cycles without warping or cracking, reducing replacement costs.
Lightweight & Easy Handling: Designed for efficient manpower utilization, minimizing labor fatigue and speeding up workflow.
Quick Assembly & Disassembly: Modular design with intuitive connection systems enables rapid setup and removal with minimal tools.
Eco-Friendly & Sustainable: Fully reusable material minimizes ecological impact and supports green building certifications.
Weather & Moisture Resistant: Premium materials resist moisture, chemicals, and physical impact for long service life.
Versatile Application: Suitable for walls, columns, slabs, foundations, bridges, tunnels, and high-rise construction.
ISO & CE Certified: Meets highest environmental and structural standards with recognized international certifications.
Cost-Effective Solution: Significantly reduces material waste and construction costs while maximizing project efficiency.
Company profile
Business Type: Manufacturer/FactoryExport Year: 2012-02-01Nearest Port: QingdaoAverage Response Time: ≤6.82hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, DAP, CIP, FCA
AI-Powered supplier vetting
SummaryThe supplier produces, sells, and leases building formwork, scaffolding, bamboo and wood-based panels, and related products, with ordinary-goods import and export in its stated scope. It demonstrates broad customization, recent new-product activity, ODM, OEM for recognized brands, and SDK availability. Production evidence includes multiple metal-processing and welding facilities and annual slab-formwork output of 150,000 square meters, while quality controls include one inspector, complaint procedures, quality assurance, and raw-material traceability. Service capability is supported by overseas installation, debugging, maintenance, repair, and training offerings in Belgium, with peak- and off-season lead times within 15 workdays. However, no overseas warehouse, showroom, agent, or branch is available. Financial records are identified for 2021–2023, but their results are not provided. Certification status, customer cases, and the status of environmental and fire-drill documentation remain insufficiently...
Supplier typeThe supplier is a manufacturer, seller, and leasing provider of building formwork, scaffolding, bamboo plywood, wood plywood, wood-plastic panels, and other bamboo and wood products. Its listed facilities include cutting, laser processing, punching, shearing, shot blasting, electrophoresis, and welding equipment, supporting classification as a building-material and formwork manufacturing supplier.
After-Sales capabilityThe supplier offers overseas debugging, maintenance, repair, training, and equipment installation in Belgium, and maintains written procedures and records for service assessment, corrective actions, and customer complaints. However, it has no overseas warehouse, showroom, agent, or branch, which limits local service infrastructure.
R&D capabilityThe supplier reports new products during the past year, provides ODM services, offers customization from samples and designs, and has an available SDK. It also reports OEM service for recognized brands, providing explicit evidence of product-development and technical collaboration capability.
Production capacityThe supplier reports annual slab-formwork productivity of 150,000 square meters and a facility base covering electrophoresis, cutting, laser cutting, punching, hydraulic shearing, shot blasting, forklift handling, and welding. Reported lead times are within 15 workdays in both peak and off-season, although capacity beyond the stated product and output information is not evidenced.
Customization capabilityBoth R&D and design-capability records list customization from samples, customization from designs, full customization, minor customization, and flexible customization. This is explicit evidence of a broad customization offering.
Product Q&A
Q:Are you a factory or a trader?
A:
We are a manufacturer integrating industry and trade. Welcome to visit our company.
Q:What payment methods do you support?
A:
We support T/T, Western Union, PayPal, cash, etc. The details can be negotiated.
Q:What are your modes of transportation?
A:
We usually choose the appropriate mode of transportation (sea, air, land) according to the conditions of the goods, or we can choose the mode of transportation according to your requirements.
Q:How can I get an accurate quotation?
A:
You can first send your specific demand information and product pictures, and we will customize a solution for you according to your needs and inform you of the specific price.
Q:What is the lead time for delivery?
A:
Peak Season Lead Time is 1-3 months, while Off Season Lead Time is within 15 workdays.
Send Inquiry
*To:
Shandong Prima Construction Formwork Co., Ltd.
Shandong Prima Construction Formwork Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Early Stripping Steel Frame Modular Table Formwork for High Rise Building
US$80.00-150.00
300 Square Meters(MOQ)
Corrosion-Resistant Reliable Steel Green Slab Formwork for Interior Decoration
US$90.00
500 Square Meters(MOQ)
Practical Damage Resistant Steel Green Formwork for Temporary Scaffolding
US$90.00
500 Square Meters(MOQ)
Concrete Aluminum Strength Early-Stripping Slab Formwork for High-Reuse with Corrosion-Resistant HDG Prop Head CE ISO
US$100.00-120.00
500 Square Meters(MOQ)
High Durability Early Stripping Steel Frame Slab Formwork for ceiling Construction
US$330.00-350.00
500 Square Meters(MOQ)
Damage-Resistant Weather-Resistant Steel Green Modular Formwork for Interior Decoration
US$90.00
500 Square Meters(MOQ)
High-Quality Reusable Steel Frame Early Stripping Slab Formwork for Concrete Slab, Floor, Ceiling Construction
US$90.00-100.00
300 Square Meters(MOQ)
Quick Disassembly Modular Early Stripping Slab Formwork for Underground Parking Garage Renovation
US$70.00-100.00
50 Square Meters(MOQ)
Early Stripping Formwork with Steel Plywood Plastic Metal Shuttering Panel for Slab Ceiling Concrete Mould Construction
US$90.00-100.00
300 Square Meters(MOQ)
Fire-Rated Formwork - High-Temperature Resistant for Safety Standards Hot Sale
US$13.70-37.80
50 Piece(MOQ)
Green Formwork System Early Stripping Panel and Prop for Slab
US$80.00-125.00
100 Square Meters(MOQ)
Green Formwork Early Stripping Slabsystem for Fast Construction
US$80.00-125.00
100 Square Meters(MOQ)
Fire-Resistant Formwork - High-Temperature Resistance for Safety
US$13.70-37.80
50 Piece(MOQ)
Durable Steel Formwork for Fast Early Stripping Slab Projects
US$52.00
10 Square Meters(MOQ)
Fire-Resistant Formwork - High-Temperature Resistance for Safety Hot Sell
US$13.70-37.80
50 Piece(MOQ)
Early Stripping Head Steel Frame Plywood Shuttering Slab Formwork for Concrete Construction Skydeck
US$90.00-100.00
300 Square Meters(MOQ)



















