SourcingAI
Try for free
Powered by Made-in-China.com
Innovative Quick Release Building Material System Range
US$100.00
500 Pieces

Product profile

Customization

Available

After-sales Service

Quality Warranty

Warranty

One Year

Model NO.

GF-001

Certification

ISO, CE

Material

Steel

Type

Slab Formwork

Panel Material

High Tensile Steel Sheet

Plywood Material

Bamboo

Color

Green or Customized

Patent Rigion

China, USA,Au, Cambodia, Indonesia..

Transport Package

Bundle

Specification

1800x1200mm

Trademark

GF

Origin

China

HS Code

8480600000

Production Capacity

50000piece Per Year

Key features

Advanced Formwork System: Ideal for flatslab or beam-less concrete structure projects with efficient solutions.
Quick Release Design: Features quick release props and does not require cross braces or tripods.
High Efficiency: Achieves 60-80m2 of work done per man per day with a 3-4 worker team.
Safety Features: Stable system with 6-direction locking restriction and no human lifting above shoulder.
Customizable Color: Available in Green or Customized color options.
Durable Materials: Constructed with high tensile steel sheets and bamboo plywood.
Global Certifications: Certified with ISO and CE standards for quality assurance.
One Year Warranty: Comes with a comprehensive one-year quality warranty.

Company profile

Shandong Prima Construction Formwork Co., Ltd.
Importers and ExportersSelf-brandedPatents AwardedExhibition Experience
Business Type: Manufacturer/FactoryExport Year: 2012-02-01Nearest Port: QingdaoAverage Response Time: ≤8.40hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, DAP, CIP, FCA

AI-Powered supplier vetting

SummaryThe supplier produces, sells, and leases building formwork, scaffolding, bamboo and wood-based panels, and related products, with ordinary-goods import and export in its stated scope. It demonstrates broad customization, recent new-product activity, ODM, OEM for recognized brands, and SDK availability. Production evidence includes multiple metal-processing and welding facilities and annual slab-formwork output of 150,000 square meters, while quality controls include one inspector, complaint procedures, quality assurance, and raw-material traceability. Service capability is supported by overseas installation, debugging, maintenance, repair, and training offerings in Belgium, with peak- and off-season lead times within 15 workdays. However, no overseas warehouse, showroom, agent, or branch is available. Financial records are identified for 2021–2023, but their results are not provided. Certification status, customer cases, and the status of environmental and fire-drill documentation remain insufficiently...
Supplier typeThe supplier is a manufacturer, seller, and leasing provider of building formwork, scaffolding, bamboo plywood, wood plywood, wood-plastic panels, and other bamboo and wood products. Its listed facilities include cutting, laser processing, punching, shearing, shot blasting, electrophoresis, and welding equipment, supporting classification as a building-material and formwork manufacturing supplier.
After-Sales capabilityThe supplier offers overseas debugging, maintenance, repair, training, and equipment installation in Belgium, and maintains written procedures and records for service assessment, corrective actions, and customer complaints. However, it has no overseas warehouse, showroom, agent, or branch, which limits local service infrastructure.
R&D capabilityThe supplier reports new products during the past year, provides ODM services, offers customization from samples and designs, and has an available SDK. It also reports OEM service for recognized brands, providing explicit evidence of product-development and technical collaboration capability.
Production capacityThe supplier reports annual slab-formwork productivity of 150,000 square meters and a facility base covering electrophoresis, cutting, laser cutting, punching, hydraulic shearing, shot blasting, forklift handling, and welding. Reported lead times are within 15 workdays in both peak and off-season, although capacity beyond the stated product and output information is not evidenced.
Customization capabilityBoth R&D and design-capability records list customization from samples, customization from designs, full customization, minor customization, and flexible customization. This is explicit evidence of a broad customization offering.

Product Q&A

Q:What is the warranty period?
A:
We provide a one-year quality warranty for this product.
Q:What materials are used in the formwork?
A:
The panel material is high tensile steel sheet and the plywood material is bamboo.
Q:Is the color customizable?
A:
Yes, the color is available in Green or Customized options.
Q:What is the lead time for orders?
A:
Lead time is 1-3 months during peak season and within 15 workdays during off-season.
Q:What certifications does the product have?
A:
The product holds ISO and CE certifications.

Send Inquiry

*To:Shandong Prima Construction Formwork Co., Ltd.Shandong Prima Construction Formwork Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Aluminum Formwork System with Quick Release for Building Projects
Made-in-China.com
Building Materials Aluminum Modular Formwork System

Building Materials Aluminum Modular Formwork System

US$125.00-210.00
1,000 Square Meters(MOQ)
Made-in-China.com
Cost-Effective Formwork System for Reliable and Durable Building
Made-in-China.com