SourcingAI
Try for free
Powered by Made-in-China.com
Pavement Repair Material, Concrete Repair Material, Rapid Pavement Repair Material, Pavement Repair Mortar for Factory Floor Fixing
US$360.00
10-99 Tons
US$350.00
100-499 Tons
US$345.00
500-999 Tons
US$340.00
1,000+ Tons

Product specifications

Color

Sample price:US$1.00/piece.Request sample

Product profile

Customization

Available

Appearance

Powder

Color

Gray

Function

Moisture-proof

Type

Cement Mortar

Usage

Joint Mortar

Mixing Mortar Type

Cement-Clay Mortar

Material

Cement

Project Solution Capability

Others

Design Style

Contemporary

Feature

High Strength

After-Sale Service

Online Technical Support

Specification

25KG/bag

Trademark

SHBAOSAI

Origin

Shanghai, China

HS Code

3824500000

Key features

High early strength, traffic can be opened in a short time.
Strong bonding strength, firmly integrated with the original pavement and not easy to peel off.
Easy construction, ready for use after mixing with water, no complicated equipment required.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: Within 1 year CertifiedNearest Port: Shanghai Port CertifiedTerms of Payment: T/T

About Our Factory & Business Background

AddressNo. 2, 39th Floor, 52nd Road, Chengliu, Jiading District, Room Jt11202, Shanghai, China
Plant Area750 square meters
Number of Employees7
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month
Minimum Order Quantity5 Tons
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsGrouting Material, Repair Mortar
Production Lines1
Production MachinesFully Automatic Mortar Production Line
QA/QC inspectors3 people
Inspection Type for Finished ProductsRandom inspection(Function inspection & Visual inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2023-10-17
Main MarketsSoutheast Asia/ Mideast, Domestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What are the most common pavement problems in the United States, and how are they solved?
A:
The most frequent issues are potholes from freeze-thaw and deicing salt, alligator cracking, edge raveling, and concrete joint spalling. Shanghai Baosai recommends cold-mix asphalt patching material for potholes, utility cuts, and edge failures, rapid-hardening cementitious mortar for concrete pavements and bridge decks, and crack sealer for routine maintenance. Cold-mix places from -10 C to 40 C and opens to traffic immediately after compaction; rapid-hardening mortar reopens within 1-2 hours
Q:What are the most common pavement problems in Canada, and how are they solved?
A:
Deep potholes from repeated freeze-thaw, frost heave, salt-induced spalling and scaling, and spring-thaw shoving are typical. Cold-mix patching material is the first choice for winter emergency repair because it places at sub-zero temperatures without heating. For salt-exposed concrete, use polymer-modified rapid-hardening mortar with air-entrainment, which significantly improves freeze-thaw durability and repair life.
Q:What are the most common pavement problems in the United Arab Emirates, and how are they solved?
A:
What are the most common pavement problems in the United Arab Emirates, and how are they solved?
Q:What are the most common pavement problems in Saudi Arabia, and how are they solved?
A:
Severe truck-load rutting, thermal cracking, binder bleeding, sand encroachment, and oil damage to concrete floors dominate. Use cold-mix with a harder polymer-modified binder for road patching, and oil-resistant high-strength mortar for industrial floors. Remove contaminated material and prime surfaces before repair. Shipments are made as palletized non-hazardous cargo with Arabic/English documentation on request.
Q:What are the most common pavement problems in Indonesia, and how are they solved?
A:
Asphalt stripping under heavy rain, wet-season potholes, soft-soil settlement, and motorcycle-lane rutting are typical. Cold-mix patching material with anti-stripping additives works well in the wet season and compacts in damp conditions once free water is removed. Rapid-hardening mortar suits factory floors and loading docks that must reopen quickly.

Send Inquiry

*To:Shanghai Baosai Environmental Protection Materials Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like