SourcingAI
Try for free
Powered by Made-in-China.com
10kv - 1000kv High Strength Mobile Power Distribution Steel Tower
US$1,250.00
5-24 Tons
US$1,180.00
25-49 Tons
US$1,050.00
50+ Tons

Product profile

Customization

Available

Usage

Flying Angle Tower, Crossing Tower, Tension Tower, Angle Tower, Terminal Tower, Transposition Tower, Branching Tower

Conductor Circuit

Single Circuit

Certification

ISO, GS, CE

Materials

Steel

Standard

Nonstandard

Style

Independence Tower

Structure

F Type

Surface Treatment

Hot DIP Galvanized Finish

Steel Material Grade

Q235B / Q345b Carbon Steel

Applicable Voltage

10kv - 500kv Power Transmission

Design Lifespan

More Than 30 Years

Wind Resistance Capacity

Level 12 Typhoon Resistance

Manufacturing Process

CNC Precision Fabrication

Installation Method

Field Bolted Assembly

Application Scenario

Overhead Power Line Construction

Customization Service

OEM & ODM Custom Design Available

Corrosion Protection

Long Term Anti Rust & Anti Corrosion

Transport Package

Standard Export Packing

Specification

65kg

Trademark

GuangSha

Origin

China

HS Code

7308200000

Production Capacity

30000tons/Year

Key features

Premium Material & Durability: Made of Q235B/Q345B steel with hot dip galvanization for over 30-year lifespan and anti-corrosion.
High Wind & Seismic Resistance: Withstands Level 12 typhoons and earthquakes up to magnitude 8, ensuring structural stability.
Custom OEM/ODM Design: Customizable height (15-80m), voltage, structure, and load capacity based on project drawings.
Strict Quality Control: 3-stage inspection including raw material, in-process, and 100% final dimension/galvanization check.
Fast Bolt Assembly: High-strength bolt connection method allows for fast and easy on-site installation.
International Standards Compliance: Manufactured per GB/T 2694, IEC, IEEE, ANSI, ASTM, BS, and DIN standards.
10-Year Warranty Coverage: Provides 10-year warranty against corrosion and 30-year structural lifespan guarantee.
Global Technical Support: Offers remote video guidance and on-site technical support for large-scale projects.

Company profile

Hengshui Guangsha Steel-Tower Manufacturing Co.,Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500Years of Export Experience
Business Type: Manufacturer/FactoryExport Year: 2018-05-14Nearest Port: Tianjin, QingdaoAverage Response Time: ≤0.23hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF

About Our Factory & Business Background

AddressNo. 69 Xingye Road, High-Tech Zone, Hengshui, Hebei, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsSteel Tower, Steel Pole, Transmission Line Tower, Electric Power Tower, Power Transmission Tower, Angle Steel Tower, Galvanized Steel Tower

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the Minimum Order Quantity (MOQ)?
A:
For standard items, MOQ is usually 1 piece for trial orders. For customized towers, MOQ depends on design complexity, but we are flexible and willing to discuss small batches for new partners.
Q:Can you provide OEM/ODM services?
A:
Yes. We have a dedicated engineering team to customize solutions based on your specific drawings, wind load requirements, and soil conditions, including custom painting, logos, and unique structural designs.
Q:How do you guarantee the quality of your towers?
A:
We implement a 3-Stage Quality Control process: Raw Material Inspection (certified steel), In-Process Inspection (welding/drilling monitoring), and Final Inspection (100% check on dimensions and galvanization thickness). Video/photos are provided for approval.
Q:Do your products meet international standards?
A:
Yes. Our products are manufactured in strict compliance with international standards such as ANSI/TIA-222, ASTM, BS, DIN, and GB. Third-party inspections by SGS, BV, or Intertek can be arranged upon request.
Q:What is your production lead time?
A:
Generally, it takes 15-25 working days after receiving the deposit and finalizing the drawings. For urgent orders, please contact us to check our production schedule and prioritize your project.

Send Inquiry

*To:Hengshui Guangsha Steel-Tower Manufacturing Co.,Ltd.Hengshui Guangsha Steel-Tower Manufacturing Co.,Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like