SourcingAI
Try for free
Powered by Made-in-China.com
Custom Hot-DIP Galvanized Lattice Steel Tower for High-Voltage Power Transmission Projects
US$1,250.00
5-24 Tons
US$1,180.00
25-49 Tons
US$1,050.00
50+ Tons

Product profile

Customization

Available

Usage

Flying Angle Tower, Crossing Tower, Tension Tower, Angle Tower, Terminal Tower, Transposition Tower, Branching Tower

Conductor Circuit

Single Circuit

Certification

ISO, GS, CE

Materials

Steel

Standard

Nonstandard

Style

Independence Tower

Structure

F Type

Surface Treatment

Hot DIP Galvanized Finish

Steel Material Grade

Q235B / Q345b Carbon Steel

Applicable Voltage

10kv - 500kv Power Transmission

Design Lifespan

More Than 30 Years

Wind Resistance Capacity

Level 12 Typhoon Resistance

Manufacturing Process

CNC Precision Fabrication

Installation Method

Field Bolted Assembly

Application Scenario

Overhead Power Line Construction

Customization Service

OEM & ODM Custom Design Available

Corrosion Protection

Long Term Anti Rust & Anti Corrosion

Transport Package

Standard Export Packing

Specification

65kg

Trademark

GuangSha

Origin

China

HS Code

7308200000

Production Capacity

30000tons/Year

Key features

30+ Year Design Lifespan: Engineered for over 30 years of outdoor service with heavy anti-corrosion protection.
Hot Dip Galvanized Finish: Premium surface treatment ensuring long-term rust prevention and structural integrity.
Customizable Voltage Support: Available for 35kV to 500kV with customized support for specific project needs.
OEM & ODM Custom Design: Full customization available for dimensions, load capacity, structure, and voltage grades.
High Wind Resistance: Grade 10 to 12 strong wind resistant performance capable of withstanding Level 12 typhoons.
Premium Steel Materials: Constructed using high-strength Q235B / Q345B carbon steel for excellent stability.
10-Year Structural Warranty: Comprehensive 10-year warranty covering structural quality and corrosion resistance.
Global Technical Support: 24/7 after-sales support including remote guidance and on-site assistance for large projects.

Company profile

Hengshui Guangsha Steel-Tower Manufacturing Co.,Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500Years of Export Experience
Business Type: Manufacturer/FactoryExport Year: 2018-05-14Nearest Port: Tianjin, QingdaoAverage Response Time: ≤6.14hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF

About Our Factory & Business Background

AddressNo. 69 Xingye Road, High-Tech Zone, Hengshui, Hebei, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsSteel Tower, Steel Pole, Transmission Line Tower, Electric Power Tower, Power Transmission Tower, Angle Steel Tower, Galvanized Steel Tower

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is your Minimum Order Quantity (MOQ)?
A:
For standard items like poles, the MOQ is usually 1 piece for trial orders. For customized towers, the MOQ depends on design complexity, but we are flexible and willing to discuss small batches for new partners.
Q:Can you provide OEM/ODM services?
A:
Absolutely. We have a dedicated engineering team that can customize solutions based on your specific drawings, wind load requirements, and soil conditions, including custom painting, logos, and unique structural designs.
Q:How do you guarantee the quality of your towers?
A:
We implement a 3-Stage Quality Control process: Raw Material Inspection using certified steel, In-Process Inspection of welding and drilling, and Final 100% inspection on dimensions and galvanization thickness before packing.
Q:Do your products meet international standards?
A:
Yes, our products are manufactured in strict compliance with standards such as ANSI/TIA-222, ASTM, BS, DIN, and GB. We can also arrange third-party inspections by SGS, BV, or Intertek at your request.
Q:What is your production lead time?
A:
Generally, it takes 15-25 working days after receiving the deposit and finalizing the drawings. For urgent orders, we can check our schedule to prioritize your project.

Send Inquiry

*To:Hengshui Guangsha Steel-Tower Manufacturing Co.,Ltd.Hengshui Guangsha Steel-Tower Manufacturing Co.,Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Versatile Low Voltage Steel Angular Tower for Power Lines
Made-in-China.com