SourcingAI
Try for free
Powered by Made-in-China.com
Durable Hot-DIP Galvanized Steel Lattice Tower for Power Transmission & Distribution Lines
US$1,250.00
5-24 Tons
US$1,180.00
25-49 Tons
US$1,050.00
50+ Tons

Product profile

Customization

Available

Usage

Flying Angle Tower, Crossing Tower, Tension Tower, Angle Tower, Terminal Tower, Transposition Tower, Branching Tower

Conductor Circuit

Single Circuit

Certification

ISO, GS, CE

Materials

Steel

Standard

Nonstandard

Style

Independence Tower

Structure

F Type

Surface Treatment

Hot DIP Galvanized Finish

Steel Material Grade

Q235B / Q345b Carbon Steel

Applicable Voltage

10kv - 500kv Power Transmission

Design Lifespan

More Than 30 Years

Wind Resistance Capacity

Level 12 Typhoon Resistance

Manufacturing Process

CNC Precision Fabrication

Installation Method

Field Bolted Assembly

Application Scenario

Overhead Power Line Construction

Customization Service

OEM & ODM Custom Design Available

Corrosion Protection

Long Term Anti Rust & Anti Corrosion

Transport Package

Standard Export Packing

Specification

65kg

Trademark

GuangSha

Origin

China

HS Code

7308200000

Production Capacity

30000tons/Year

Key features

Premium Material Grade: Constructed from Q235B/Q345B high-strength structural steel for superior durability.
Heavy Anti-Corrosion: Hot-dip galvanized finish ensures long-term rust prevention and corrosion resistance.
High Wind Resistance: Engineered to withstand Level 12 typhoon winds and seismic activity up to Magnitude 8.
Long Design Lifespan: Designed for over 30 years of outdoor service with a 10-year warranty against corrosion.
Flexible Customization: OEM/ODM services available for voltage, height (15-80m), structure, and load capacity.
Strict Quality Control: 3-stage inspection including raw material, in-process, and 100% final dimension checks.
Fast On-site Assembly: Field bolted connection method allows for quick and easy installation without welding.
International Standards: Complies with GB/T 2694, IEC, IEEE, ANSI/TIA-222, ASTM, BS, and DIN standards.

Company profile

Hengshui Guangsha Steel-Tower Manufacturing Co.,Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500Years of Export Experience
Business Type: Manufacturer/FactoryExport Year: 2018-05-14Nearest Port: Tianjin, QingdaoAverage Response Time: ≤3.41hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF

About Our Factory & Business Background

AddressNo. 69 Xingye Road, High-Tech Zone, Hengshui, Hebei, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsSteel Tower, Steel Pole, Transmission Line Tower, Electric Power Tower, Power Transmission Tower, Angle Steel Tower, Galvanized Steel Tower

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the Minimum Order Quantity (MOQ)?
A:
For standard items, the MOQ is usually 1 piece for trial orders. For customized towers, the MOQ depends on design complexity, but we are flexible and willing to discuss small batches for new partners.
Q:Can you provide OEM/ODM services?
A:
Yes. We have a dedicated engineering team that can customize solutions based on your specific drawings, wind load requirements, and soil conditions, including custom painting, logos, and unique structural designs.
Q:How do you guarantee the quality of your towers?
A:
We implement a 3-Stage Quality Control process: Raw Material Inspection, In-Process Inspection (welding, drilling, fit-up), and Final Inspection (100% check on dimensions and galvanization thickness). We also provide video/photos of the inspection for your approval.
Q:Do your products meet international standards?
A:
Yes. Our products are manufactured in strict compliance with international standards such as ANSI/TIA-222, ASTM, BS, DIN, and GB. We can also arrange third-party inspections by SGS, BV, or Intertek at your request.
Q:What is your production lead time?
A:
Generally, it takes 15-25 working days after receiving the deposit and finalizing the drawings. For urgent orders, please contact us to check our production schedule and prioritize your project.

Send Inquiry

*To:Hengshui Guangsha Steel-Tower Manufacturing Co.,Ltd.Hengshui Guangsha Steel-Tower Manufacturing Co.,Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like