SourcingAI
Try for free
Powered by Made-in-China.com
High-Strength Hot-DIP Galvanized Steel Lattice Power Transmission Tower
US$1,250.00
5-24 Tons
US$1,180.00
25-49 Tons
US$1,050.00
50+ Tons

Product profile

Customization

Available

Usage

Flying Angle Tower, Crossing Tower, Tension Tower, Angle Tower, Terminal Tower, Transposition Tower, Branching Tower

Conductor Circuit

Single Circuit

Certification

ISO, GS, CE

Materials

Steel

Standard

Nonstandard

Style

Independence Tower

Structure

F Type

Surface Treatment

Hot DIP Galvanized Finish

Steel Material Grade

Q235B / Q345b Carbon Steel

Applicable Voltage

10kv - 500kv Power Transmission

Design Lifespan

More Than 30 Years

Wind Resistance Capacity

Level 12 Typhoon Resistance

Manufacturing Process

CNC Precision Fabrication

Installation Method

Field Bolted Assembly

Application Scenario

Overhead Power Line Construction

Customization Service

OEM & ODM Custom Design Available

Corrosion Protection

Long Term Anti Rust & Anti Corrosion

Transport Package

Standard Export Packing

Specification

65kg

Trademark

GuangSha

Origin

China

HS Code

7308200000

Production Capacity

30000tons/Year

Key features

30-Year Design Lifespan: Designed for over 30 years of outdoor service with heavy anti-corrosion hot-dip galvanization.
High Wind Resistance: Grade 10-12 wind resistance capacity, capable of withstanding Level 12 typhoons and seismic activity up to magnitude 8.
OEM & ODM Customization: Full customization available for height (15m-80m), voltage (10kV-500kV), structure, and load capacity based on project drawings.
Premium Steel Material: Constructed from high-strength Q235B/Q345B carbon steel ensuring excellent structural stability and high pressure bearing capacity.
Strict Quality Control: 3-stage QC process including raw material inspection, in-process monitoring, and 100% final inspection with video proof.
Global Certification: Compliant with ISO9001, CE, ANSI/TIA-222, ASTM, BS, DIN, and GB standards; third-party inspections available.
Fast Bolt Assembly: High-strength bolt connection method allows for fast, easy, and secure on-site assembly without complex welding.
10-Year Warranty: Comprehensive 10-year warranty against corrosion with 24/7 after-sales support and emergency response.

Company profile

Hengshui Guangsha Steel-Tower Manufacturing Co.,Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500Years of Export Experience
Business Type: Manufacturer/FactoryExport Year: 2018-05-14Nearest Port: Tianjin, QingdaoAverage Response Time: ≤0.23hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF

About Our Factory & Business Background

AddressNo. 69 Xingye Road, High-Tech Zone, Hengshui, Hebei, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsSteel Tower, Steel Pole, Transmission Line Tower, Electric Power Tower, Power Transmission Tower, Angle Steel Tower, Galvanized Steel Tower

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the Minimum Order Quantity (MOQ)?
A:
For standard items, MOQ is usually 1 piece for trial orders. For customized towers, MOQ depends on design complexity, but we are flexible and welcome small batches for new partners.
Q:Can you provide OEM/ODM services?
A:
Yes, we have a dedicated engineering team to customize solutions based on your drawings, wind load, and soil conditions, including custom painting, logos, and unique structural designs.
Q:How do you guarantee the quality of your towers?
A:
We implement a 3-Stage Quality Control process: Raw Material Inspection, In-Process Inspection, and 100% Final Inspection on dimensions and galvanization thickness. Video/photos are provided for approval.
Q:Do your products meet international standards?
A:
Yes, we comply with ANSI/TIA-222, ASTM, BS, DIN, and GB standards. Third-party inspections by SGS, BV, or Intertek can be arranged upon request.
Q:What is the production lead time?
A:
Generally 15-25 working days after receiving the deposit and finalizing drawings. Urgent orders can be prioritized upon contact.

Send Inquiry

*To:Hengshui Guangsha Steel-Tower Manufacturing Co.,Ltd.Hengshui Guangsha Steel-Tower Manufacturing Co.,Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

230kv Carbon Steel Custom Tangent Monopole Tower
Made-in-China.com