SourcingAI
Try for free
Powered by Made-in-China.com
Octagonal Tubular Electric Power Pole High Voltage Galvanized Steel Pole
US$1,250.00
5-24 Tons
US$1,180.00
25-49 Tons
US$1,050.00
50+ Tons

Product profile

Customization

Available

Usage

Power Transmission Steel Pole

Conductor Circuit

Double Circuit

Certification

ISO, CE

Materials

Steel

Standard

Standard

Style

Independence Tower

Structure

Steel Pole Structure

Rated Voltage

10kv-1000kv

Height Range

5m-50m

Material Grade

Q235B / Q345b / Q420

Galvanization Type

Hot-DIP Galvanized

Load Capacity

10kN-100kN

Design Standard

GB / IEC / ANSI / as

Service Life

≥30 Years

Lead Time

15-45 Days

Packaging Method

Steel Strip + Pallet / Nude Packing

Shipping Port

Tianjin

MOQ

1 Set / Negotiable

OEM/ODM Service

Available

After-Sales Service

Installation Guidance / Spare Parts Supply

Installation Guide

Provided

Spare Parts Supply

Long-Term Available

Transport Package

Sea Freight

Specification

65kg

Trademark

GuangSha

Origin

Hebei/China

HS Code

7308200000

Production Capacity

30000tons/Year

Key features

Long Service Life: Designed for a service life of 30 years or more under normal operating conditions.
Customizable Voltage: Available voltage grades include 10kV, 35kV, 110kV, and 220kV.
Wind Resistance: Capable of withstanding wind speeds from 30m/s to 50m/s based on regional standards.
Seismic Performance: Meets GB/T 50011 standard with seismic fortification intensity up to 8 degrees.
OEM & ODM Services: Full customization available based on load, height, environment, and brand specifications.
High Corrosion Resistance: Features hot-dip galvanization (HDG) with a 10-year warranty against corrosion.
Flexible MOQ: MOQ is 1 piece for trial orders; customized batches are negotiable for new partners.
Comprehensive Quality Control: 3-stage QC process including raw material, in-process, and final 100% inspection.

Company profile

Hengshui Guangsha Steel-Tower Manufacturing Co.,Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500Years of Export Experience
Business Type: Manufacturer/FactoryExport Year: 2018-05-14Nearest Port: Tianjin, QingdaoAverage Response Time: ≤0.22hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF

About Our Factory & Business Background

AddressNo. 69 Xingye Road, High-Tech Zone, Hengshui, Hebei, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsSteel Tower, Steel Pole, Transmission Line Tower, Electric Power Tower, Power Transmission Tower, Angle Steel Tower, Galvanized Steel Tower

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is your Minimum Order Quantity (MOQ)?
A:
For standard items like poles, the MOQ is usually 1 piece for trial orders. For customized towers, the MOQ depends on design complexity, but we are flexible and willing to discuss small batches for new partners. We encourage you to start with a sample order to test our quality.
Q:Can you provide OEM/ODM services?
A:
Absolutely. We have a dedicated engineering team that can customize solutions based on your specific drawings, wind load requirements, and soil conditions. We can manufacture according to your brand specifications, including custom painting, logos, and unique structural designs.
Q:How do you guarantee the quality of your towers?
A:
Quality is our culture. We implement a 3-Stage Quality Control process: Raw Material Inspection (using certified steel), In-Process Inspection (monitoring welding and drilling), and Final Inspection (100% inspection on dimensions and galvanization thickness). We also provide video/photos of the inspection for your approval.
Q:Do your products meet international standards?
A:
Yes. Our products are manufactured in strict compliance with international standards such as ANSI/TIA-222, ASTM, BS, DIN, and GB. We can also arrange third-party inspections by SGS, BV, or Intertek at your request.
Q:What is your production lead time?
A:
Generally, it takes 15-25 working days after receiving the deposit and finalizing the drawings. For urgent orders, please contact us, and we will check our production schedule to prioritize your project.

Send Inquiry

*To:Hengshui Guangsha Steel-Tower Manufacturing Co.,Ltd.Hengshui Guangsha Steel-Tower Manufacturing Co.,Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like