SourcingAI
Try for free
Powered by Made-in-China.com
Easy Changeover Lotion Cream Cosmetic Water Material Dosing Transfer Pump Feeding Machine
US$520.00-680.00
1 Piece

Product profile

Customization

Available

After-sales Service

Online Support

Forming Function

Transfer

Driven Type

Electric

Packaging

Bottles

Packaging Material

Film

Material

Stainless Steel

Condition

New

Power

Pneumatic

Layout Type

Horizontal

Working

High Pressure

Usage

Water, Chemical, Paste, Lotion, Food etc.

Operation Type

Continuous Operating

Transport Package

Wooden Box

Origin

Guangzhou, China

Key features

Wide Viscosity Handling: Transfers thin solvents to thick creams and pastes with exceptional precision.
Up to 30% Efficiency Boost: Eliminates manual lifting, reduces labor costs, and integrates seamlessly with filling machines.
Flexible Bottle Customization: Adapts to glass, plastic, or irregular bottles via adjustable grippers, molds, and programs.
Rigorous 72-Hour Testing: Every machine undergoes continuous idle and load testing with video proof before shipment.
Free Sample Test Run: Send 3-5 sample bottles for a free test with video confirmation before production.
Remote Installation Support: Free real-time online guidance via Zoom/Teams for installation and operator training.
ISO9001 & CE Certified: High-tech enterprise with 10+ years experience meeting strict global safety standards.

Company profile

Guangzhou Guanchuan Machinery Equipment Co., Ltd.
High Repeat Buyers ChoiceIn-stock CapacityQA/QC InspectorsProduction Process Visualization
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 3 Years CertifiedNearest Port: Huangpu PortAverage Response Time: ≤4.44h

About Our Factory & Business Background

AddressNanling, Baiyun, Guangzhou, Guangdong, China
Plant Area400 square meters
Number of Employees6
Registered Capital1,000,000 RMB
Terms of PaymentSmall-amount payment, Western Union, PayPal, D/P, T/T, LC
International Commercial Terms(Incoterms)EXW, CFR, CIF, FOB
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 Pc
Supply Chain Partners50

Our Production Capability & Technical Expertise

Main ProductsCosmetics Machinery
Production Lines1
Production MachinesAssembly Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Function inspection & Visual inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsNo

Our Industry Experience & Global Business Record

Year of Establishment2022-06-13
Main MarketsDomestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What kind of company are you?
A:
We are a high-tech enterprise specializing in packaging machinery for the perfume and cosmetics industry, with over 10 years of R&D and manufacturing experience. Our company is ISO9001 certified, and all our equipment meets CE safety standards. We provide reliable filling and cleaning solutions to clients in more than 50 countries and regions worldwide, from small artisans to large-scale brands.
Q:Is the equipment standard, or can it be customized? How do you ensure it will work with my bottles?
A:
We provide highly flexible customization services. Whether you use glass, plastic, or irregularly shaped bottles, we can adapt the machine by changing grippers, molds, and adjusting programs. To ensure a perfect fit, we strongly recommend sending us 3-5 sample bottles for a free test run. We will send you a video of the test for confirmation before proceeding with production.
Q:What is the production and delivery lead time for a machine?
A:
For standard models, the typical production lead time is 10-15 days. Every machine undergoes a rigorous 72-hour continuous test (both idle and under load) before shipment. We provide a recorded video of this test for your review, ensuring the machine arrives at your facility ready for stable operation.
Q:Do you offer installation and training in our country? What should we do if we encounter problems?
A:
We provide multiple support options to ensure your success: Remote Guidance Installation: Our engineers offer free real-time online guidance via video conference (e.g., Zoom/Teams) for installation and operator training. On-Site Service (Optional): If you require us to send an engineer, we can provide a visa invitation letter. The related travel expenses would be negotiated separately.

Send Inquiry

*To:Guangzhou Guanchuan Machinery Equipment Co., Ltd.Guangzhou Guanchuan Machinery Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like