SourcingAI
Try for free
Powered by Made-in-China.com
Energy-Efficient Air Curtain with Speed Controller for Gates CB CE
US$38.00
1-99 pieces
US$31.50
100-499 pieces
US$27.30
500+ pieces

Product profile

Customization

Available

Type

Air Curtain

Air Tube Material

Galvanized Sheet

Model NO.

Air curtain

Corrosion Durability

Higher

Operating Voltage

115 VAC

Noise Level

Low

Application Fields

Mechanical Engineering

Mounting

Wall/Window Mount

Lifetime

5~10 years

Certification

RoHS, UR, ISO, CE, CCC

Condition

New

Compressor Brand

SANYO

Machinery Test

Provided Report

Key Selling Points

Long Service Life

Core Components

Motor, Engine, Gear

Place of Origin

Guangdong, China

Mounting Type

Wall /Window Mount

Video Outgoing-

Provided Inspection

Fan Motors Type

AC

Transport Package

Maritime Transportation

Specification

Different Can Choose

Trademark

Miwind

Origin

China

Key features

Energy Efficient Design: Low noise level and high air volume efficiency for various gate applications.
Multiple Size Options: Available in 600mm to 2000mm lengths with varying power and air volume.
Comprehensive Certifications: RoHS, UR, ISO, CE, and CCC certified for global market compliance.
OEM/ODM Support: Full customization options including samples, designs, and minor adjustments.
Quality Assurance: Pre-production samples and 100% final inspection before shipment.
Durable Construction: Galvanized sheet material with higher corrosion durability for long life.

Company profile

Foshan Mifeng Electrical Equipment Co., Ltd.
High Repeat Buyers ChoiceCooperated with Fortune 500R&D Capabilities100% Finished Products Inspection
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 7 Years CertifiedNearest Port: Guangzhou Port, Shenzhen Port, Foshan PortAverage Response Time: ≤2.25h

AI-Powered supplier vetting

SummaryThe supplier demonstrates strong R&D capabilities, offering customization and 3D software design services. It holds ISO9001:2015 and CE certifications, indicating a focus on quality and compliance. Financially, the supplier shows consistency over the past three years. Despite lacking overseas warehousing and showrooms, it has participated in trade shows like the Canton Fair. There are clear procedures for quality control and handling customer complaints, indicating a commitment to customer service. However, the supplier lacks contracts with subcontractors and overseas service capabilities.
Supplier typeThe supplier is a combined company with a strong emphasis on R&D and technical services, including 3D software design.
CertificationsThe supplier holds ISO9001:2015 and CE certifications, indicating compliance with international quality and safety standards.
After-Sales capabilityThe supplier has clear procedures for corrective actions and handling customer complaints, ensuring effective after-sales service.
Financial creditThe financial capacity shows consistency over the last three years, suggesting stability and credibility.
R&D capabilityThe supplier has demonstrated R&D capabilities by introducing new products and offering ODM and OEM services.
Customization capabilityThe supplier offers a range of customization services, from minor adjustments to full customization, supported by their R&D capabilities.

Product Q&A

Q:Is customization available for this air curtain?
A:
Yes, we offer OEM/ODM services including customization from samples, designs, full customization, and minor adjustments.
Q:What certifications does the product hold?
A:
The product is certified with RoHS, UR, ISO, CE, and CCC standards.
Q:How do you guarantee product quality?
A:
We always provide a pre-production sample before mass production and conduct a final inspection before shipment.
Q:What are the payment and delivery terms?
A:
Accepted payments include T/T, L/C, PayPal, etc. Delivery terms include FOB, CFR, CIF, EXW, and Express Delivery.
Q:What is the lead time for orders?
A:
Lead time is within 15 workdays during off-season and within one month during peak season.

Send Inquiry

*To:Foshan Mifeng Electrical Equipment Co., Ltd.Foshan Mifeng Electrical Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like