Powered by Made-in-China.com
Ductile Iron Pipe Fitting for Water Supply Pipe
US$1,000.00-1,300.00
1 Ton
Product profile
Customization
AvailableAfter-sales Service
1 YearWarranty
1 YearModel NO.
GW70Type
Equal and ReducingConnection
FemaleMaterial
Ductile IronShape
Equal and ReducingLateral
90°TeeHead Code
RoundWall Thickness
STDFinish
Black PaintingTechnics
CastingPressure Rating
Pn10/Pn16/Pn25/Pn40Standard
ISO2531, En545, En598, BS4772, En12842, Awwa C110Certification
ISOFlange Standard
Pn10 Pn16Brand
GwPacking
Wooden Case or PalletGasket Material
SBRTransport Package
Wooden CaseSpecification
DN80-2000mmTrademark
GREAT WALLOrigin
Shandong, ChinaKey features
Multi-Standard Compliance: Conforms to ISO2531, EN545, EN598, BS4772, EN12842, and AWWA C110 standards.
Flexible Customization: Offers flexible customization for flange standards, brand, packing, and gasket material.
Durable Coating Options: Features cement mortar internal lining and external zinc spray with bitumen or epoxy coating.
Wide Pressure Range: Available in PN10, PN16, PN25, and PN40 pressure ratings for diverse applications.
Versatile Application: Suitable for water supply, drainage, sewage, and irrigation pipeline systems.
Low MOQ: Minimum Order Quantity is just 1 unit, allowing for small batch purchases.
Fast Lead Time: Average lead time is within 15 workdays for both peak and off-season periods.
1-Year Warranty: Comprehensive 1-year warranty coverage for after-sales service and product quality.
Company profile
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Flexible customization CertifiedExport Year: 6 Years CertifiedNearest Port: Shanghai Port, Qingdao Port, Dalian PortAverage Response Time: ≤2.68h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressRoom 3309-7, Building B, Greenland Zifeng Building, Longshi Township, Yingjiang District, Anqing City, Anhui Province
Plant Area60 square meters
Number of Employees2
Registered Capital200,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners1
Our Production Capability & Technical Expertise
Main ProductsHot Tapping Machine, Line Stop Machine, Sandwich Valve, Universal Coupling, Repair Clamps, Stainless Steel Grooved Coupling, Pipe Cutting Machine, Split Tee, Hot Tapping Fitting, Line Stop Fitting
R&D Engineers1 people
Our Industry Experience & Global Business Record
Year of Establishment2024-08-07
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff6
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What standards do the pipe fittings comply with?
A:
Our products conform to ISO2531, EN545, EN598, BS4772, EN12842, and AWWA C110 standards.
Q:What customization options are available?
A:
We offer flexible customization including flange standards (PN10/PN16), brand (Gw), packing (Wooden Case/Pallet), and gasket material (SBR).
Q:What are the internal and external coating options?
A:
Internal coating is cement mortar lining. External options include metallic zinc spray with bitumen painting or fusion bonded epoxy coating.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 unit.
Q:What are the payment terms?
A:
We accept LC, T/T, D/P, PayPal, Western Union, and small-amount payments.
Send Inquiry
*To:
ANQING GREAT WALL PIPELINE CO., LTD.
ANQING GREAT WALL PIPELINE CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
En545 Epoxy Coating Ductile Cast Iron Pipe Fittings All Flange Equal Tee for Water Supply Application
US$9.00-10.00
5 Pieces(MOQ)
Ductile Iron All Socket Tee for UPVC Pipe Fitting
US$60.00-5,000.00
100 PCS(MOQ)
ISO2531 En545 En 598 Ductile Iron Pipe Fitting for Water Application
US$1,000.00-1,300.00
1 Ton(MOQ)
Ductile Iron Grooved Tee Equal Three Way Fitting for Industrial Chilled Water Distribution
US$0.70-3.00
300 Pieces(MOQ)
PE Lined Iron Pipe Tee Equal Three Way Fitting for Underground Potable Water Networks
US$0.30-10.00
100 Pieces(MOQ)
ISO2531 Ductile Cast Iron All Flange Equal Tee Pipe Fitting Water Supply Project
US$1,150.00-1,200.00
1 Ton(MOQ)
China Ductile Casting Iron Drain Pipe Fitting for Water Supply
US$650.00-750.00
100 Tons(MOQ)
Water Supply Grooved Tee Ductile Iron Three Way Fitting for Potable Distribution Branches
US$0.70-3.00
300 Pieces(MOQ)
ISO2531 En545 Ductile Cast Iron All Flanged Pipe Fittings for Water Pipeline
US$1,150.00-1,200.00
1 Ton(MOQ)
En545 ISO2531 Ductile Cast Iron Flanged Elbow Pipe Fittings for Water Supply
US$1,150.00-1,200.00
1 Ton(MOQ)
Epoxy Lined Iron Tee Three Way Pipe Fitting for Corrosive Domestic Water Distribution
US$0.30-10.00
100 Pieces(MOQ)
FM/UL/CE Certified Ductile Iron Grooved Pipe Fittings for Fire Fighting Systems
US$0.50-48.00
10 Pieces(MOQ)
Ductile Iron Loosed Flange Tees Pipe Fittings for Worldwide Supply Chains
US$10.00
1 Piece(MOQ)
China ISO2531 Black Ductile Cast Iron Di Pipe Fittings for Water Supply
US$650.00-750.00
100 Tons(MOQ)
China Manufacturing ISO2531 Ductile Iron Casting Pipe Fitting for Water Supply
US$650.00-750.00
100 Tons(MOQ)
Ductile Casting Iron Dci Flanged Taper Pipe Fitting for Water Supply
US$1,200.00
1 Ton(MOQ)
En 545 Certified Ductile Iron Loose Flange Pipe Fittings for Global Supply
US$10.00
1 Piece(MOQ)
OEM GOST Three Way Ductile Iron Fittings Flange Tee for Hydrant
US$1,500.00-1,600.00
20 Tons(MOQ)



















