Powered by Made-in-China.com
Automatic Welding Painted HDG Galvanized H/Door Work Platform Frame Scaffolding for Building
US$18.00
3-999 Pieces
US$15.00
1,000-9,999 Pieces
US$13.00
10,000+ Pieces
Sample price:US$10.00/piece.Request sample
Product profile
Customization
AvailableMaterial
MetalType
MobileModel NO.
ASTMStructural Style
Multi-Pole ScaffoldingFramework
Frame Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Double ScaffoldingErection Position
External ScaffoldingMove Method
Horizontal mobile ScaffoldingScaffolding Part Type
Scaffolding FramesConstruction Properties
Installation ScaffoldProduct Name
Scaffold LadderWelding Technique
CO2 Arc WeldingCertification
SGSPayment
T/T L/CMOQ
1 20FT Container;Please Contact Us If You Need LesTransport Package
Packed in a Bubble or a Carton, Can Be CustomizedSpecification
1700*1219mm, 1219*1930mm, 914*1219mm, 1219*1524Trademark
GY-STEELOrigin
Tianjin ChinaProduction Capacity
5000 Pieces/MonthKey features
SGS Certification: Certified by SGS for global compliance and quality trust.
CO2 Protection Welding: Uses CO2 arc welding for stronger joints and safer long-term use.
Thicker Hook Design: Features thicker hooks for easier disassembly, saving time and labor.
Galvanized Surface Treatment: Available with pre-galvanized or hot-dip galvanized finishes.
Multiple Size Options: Available in various sizes including 1219*1930mm and 1219*1700mm.
Easy Installation: Can be erected by a few workers, saving significant time.
Multi-Functional Use: Suitable for slab form support, falsework, or mobile painting.
High Production Capacity: Supplier capacity of 5000 pieces per month for scaffolding frames.
Company profile
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples CertifiedExport Year: 19 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤5.80h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressRoom 1812, Building 10, Nobel Center, Lvwei Road, Hebei District, Tianjin, China
Plant Area210 square meters
Number of Employees23
Registered Capital10,800,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Ton
Supply Chain Partners60
Our Production Capability & Technical Expertise
Main ProductsGalvanized Steel Pipe, Steel Pipe, Steel Tube, Cold Bend Steel Profile, Iron Nails, Iron Wire, Roofing Sheet, Galvanized Coil, PPGI Coil, Hot Steel Plate
R&D Engineers1 people
Our Industry Experience & Global Business Record
Year of Establishment2007-11-26
Main MarketsSouth America, Southeast Asia/ Mideast, Africa, Asia
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff11
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What materials are used for the scaffolding?
A:
The scaffolding is constructed from Chinese Q235 and Q195 standard metal materials.
Q:What surface treatments are available?
A:
Options include pre-galvanized and hot-dip galvanized surface treatments.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 900-1200 pieces per 40HQ container.
Q:How long does it take to ship?
A:
Lead time is within 15 workdays during both peak and off-peak seasons.
Q:What payment methods are accepted?
A:
We accept T/T, L/C, D/P, PayPal, Western Union, and small-amount payments.
Send Inquiry
*To:
Tianjin.Goldensun Import & Export Co., Ltd.
Tianjin.Goldensun Import & Export Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Top Quality Safe Painted and Pre-Galvanized Scaffolding Mild Steel H Frame System Standard for Construction
US$8.00-15.00
100 Piece(MOQ)
Painted Movable Scaffolding Platform Walk Through H Frame Scaffolding
US$760.00-860.00
1 Ton(MOQ)
Automatic Welding Painted HDG Galvanized Steel H/Door Work Platform Frame Scaffolding for Building
US$5.00-18.00
500 Pieces(MOQ)
2-15 Meters Automatic Mobile Telescopic Frame Electric Lifting Ladder Scaffolding Platform for Construction
US$500.00-950.00
1 Piece(MOQ)
Automatic Welding Foldable HDG/Powder Coated H/Door Work Platform Frame Scaffolding for Building
US$5.00-20.00
50 Pieces(MOQ)
Reliable Durable Galvanized Steel Door Frame Scaffolding for Home Renovation Work
US$450.00-650.00
100 Sets(MOQ)
American HDG Painted Mason Narrow H Scaffolding Walk Through Frame Scaffolding Narrow Frame
US$30.00-50.00
50 Sets(MOQ)
HDG Metal Q235 Mobile H Frame Walk Thru Scaffolding Set
US$15.00-60.00
500 Pieces(MOQ)
Shoring H Galvanized Painted Steel System Box Frame Scaffolding
Negotiable
100 Pieces(MOQ)
H-Frame Walk-Through Scaffolding A572 Galvanized Painted for Construction
US$205.00-550.00
1 Ton(MOQ)



















