SourcingAI
Try for free
Powered by Made-in-China.com
Galvanized Scaffolding Steel Plank Scaffold Platform Scaffolding Planks for Building
US$13.00
100-999 Sets
US$11.00
1,000+ Sets
Sample price:US$50.00/set.Request sample

Product profile

Customization

Available

After-sales Service

3years

Warranty

3years

Model NO.

Scaffollding Plank

Material

Steel

Type

Mobile

Structural Style

H Frame Scaffolding

Framework

Combined Scaffolding

Supporting Mode

Projecting Scaffolding

Lapping Form

Full Scaffolding

Erection Position

External, Internal Scaffolding

Move Method

Horizontal mobile Scaffolding

Scaffolding Part Type

Scaffolding Frames

Construction Properties

Building Scaffold

Surface Treatment

Color Painted, Galvanized, Powder Coated

Steel Grade

Q195, Q235

Usage

Building and Construction Industries

Features

Easy to Install, Strong Load-Bearing Capacity

Component Parts

Frame:2 Pieces of Shelves, 2 Pairs of Cross Brace,

Transport Package

in Bundle or in Bulk

Specification

1700*1219mm, 1219*1230 914*1219 1219*1524mm

Trademark

GY STEEL

Origin

Tianjin, China

HS Code

73084000

Production Capacity

50000sets/Month

Key features

Hot Dipped Galvanized: Made of Q345 Carbon Steel with hot dipped galvanized surface treatment for superior corrosion resistance.
Easy Installation: Can be erected by a few workers quickly, saving significant time and labor costs on site.
Strong Load-Bearing: Designed with heavy bigger wheels and robust frame for high stability and load capacity.
Multi-Functional Use: Suitable for slab form support, falsework, mobile painting, and supporting interior or exterior structures.
Customized Options: Supports customization for logo, labels, shape, surface, embossment, and package according to requirements.
Fast Delivery: Production and delivery completed within 15-20 days, with peak season lead time within 15 workdays.
Factory Direct Price: Direct from manufacturer with over 18 years of OEM & ODM export experience ensuring competitive pricing.
Quality Assurance: Accepts any quality inspection before loading with signed Quality Agreement and Delivery Time Agreement.

Company profile

Tianjin.Goldensun Import & Export Co., Ltd.
High Repeat Buyers ChoiceFast Delivery
CertifiedBusiness Type: Trading Company CertifiedCustomization Options: Customization from Samples CertifiedExport Year: 19 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤4.87h CertifiedTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressRoom 1812, Building 10, Nobel Center, Lvwei Road, Hebei District, Tianjin, China
Plant Area210 square meters
Number of Employees23
Registered Capital10,800,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Ton
Supply Chain Partners60

Our Production Capability & Technical Expertise

Main ProductsGalvanized Steel Pipe, Steel Pipe, Steel Tube, Cold Bend Steel Profile, Iron Nails, Iron Wire, Roofing Sheet, Galvanized Coil, PPGI Coil, Hot Steel Plate
R&D Engineers1 people

Our Industry Experience & Global Business Record

Year of Establishment2007-11-26
Main MarketsSouth America, Southeast Asia/ Mideast, Africa, Asia
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff11
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What materials are used for the scaffolding?
A:
The scaffolding is made from Q235 and Q195 carbon steel, with hot dipped galvanized Q345 carbon steel options available.
Q:What surface treatments are available?
A:
We offer Color Painted, Galvanized, and Powder Coated surface treatments to suit different requirements.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 set or 1 Ton, depending on the specific product configuration.
Q:Can the product be customized?
A:
Yes, we support customization for logo, labels, shape, surface, embossment, and packaging.
Q:How long is the delivery time?
A:
Production is fast with a delivery time of 15-20 days, applicable for both peak and off-peak seasons.

Send Inquiry

*To:Tianjin.Goldensun Import & Export Co., Ltd.Tianjin.Goldensun Import & Export Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Steel Metal Plywood Plank for Scaffolding
Made-in-China.com
Perforated Ringlock Scaffold Galvanized Steel Plank
Made-in-China.com