Powered by Made-in-China.com
Durable C60 Locking Stamp Head for Enhanced Security
US$0.20
5,000-9,999 Pieces
US$0.19
10,000+ Pieces
Product profile
Customization
AvailableAfter-sales Service
Online Technical ServicesWarranty
1 YearModel NO.
HH03Material
MetalType
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Full ScaffoldingErection Position
Internal ScaffoldingMove Method
Integral Lifting ScaffoldingScaffolding Part Type
Scaffolding PlanksConstruction Properties
Building ScaffoldSafety
High Load-Bearing Capacity, Hot-DIP Galvanized AntFunxtion
Connection FunctionWidely Applicable
Suitable for Various Buildings, Such as Elevated BBearing Capacity
The Bearing Capacity of The Buckle Lock Head Is ReTransport Package
Steel PalletSpecification
Lenth 1m 2m 3mOrigin
ChinaHS Code
7308400000Production Capacity
100000Key features
Self-Locking Safety Design: Adopts self-locking connection plate and pin for automatic locking, enhancing scaffold stability and safety.
High Load-Bearing Capacity: Hot-dip galvanized construction ensures high load-bearing capacity and excellent corrosion resistance.
Modular Scaffolding System: Combines with horizontal, vertical, and diagonal rods to form fixed triangular structures for various spans.
Customizable Specifications: Surface color, length, and thickness can be adjusted to align with specific project requirements.
Fast Construction Efficiency: Buckle lock design allows faster construction and dismantling, improving overall project efficiency.
Durable Material Quality: Made from Q235 metal with hot-dip galvanizing, extending service life and reducing maintenance costs.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤4.12h
About Our Factory & Business Background
AddressCangzhou, Hebei, China
Plant Area5000 square meters
Number of Employees18
Registered Capital10,000,000 RMB
Terms of PaymentT/T, Small-amount payment, Western Union, PayPal, D/P, LC, Money Gram
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW, DAT, FAS, DDP, DAP, CIP, CPT, FCA
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity500pcs
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsSteel Support, Steel Prop, Scaffolding, Scaffolding Clamp, Jack Base, Formwork Spring Clamp
Production Lines10
Production MachinesBending Machine, Shearing Machine, Welding Machine, Laser Cutting Machine, Coating Line, Hole Punching Machine, Pressing Machine, Thread Rolling Machine, CNC Lathe
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2020-06-03
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
Product Q&A
Q:What is the delivery time for stock products?
A:
For stock products, shipments are made in 2-5 days after receiving deposit or T/T. For non-stock items, delivery time is 7 days for stock materials, while exact times for non-stock items are confirmed with the production department.
Q:What are the payment terms?
A:
Payment terms include a 30% down payment via TT and a 70% balance via TT or L/C. Other options include Small-amount payment, Western Union, PayPal, D/P, LC, and Money Gram.
Q:Can you accept customization requests?
A:
Yes, customization is available as per customer requests. Options include customization from samples, designs, full customization, minor customization, and flexible customization.
Q:How do you ship the goods and what is the transit time?
A:
We usually ship by DHL, UPS, FedEx, or TNT, with arrival taking 3-5 days. Airline and sea shipping are also optional. For mass products, ship freight is preferred.
Q:Can you provide samples?
A:
Samples can be provided, but the sample charge and courier fee are borne by the buyer.
Send Inquiry
*To:
Hebei Haihong Construction Equipment Co., Ltd
Hebei Haihong Construction Equipment Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Made in China Durable Hollow Base Jack U Head for Shoring
US$2.99-5.99
1,000 Pieces(MOQ)
Wide Application Durable Base Jack Fork Head for Scaffolding Systems
US$2.99-5.99
1,000 Pieces(MOQ)
Heavy-Duty Scaffolding Lock Heads for Cuplock and Ringlock Systems
US$534.00
28 Tons(MOQ)
Reliable Durable Ringlock Diagonal Brace Head with Pin for Scaffolding Bulk Accessory
US$0.35-1.10
1,000 Pieces(MOQ)
Hot DIP Galvanized Ringlock Diagonal Brace Head for All Building Construction Sites
US$0.35-1.10
1,000 Pieces(MOQ)
Industry Leading High Stability Base Jack Fork Head for Building Structural Height
US$2.99-5.99
1,000 Pieces(MOQ)
Painting/Galvanized/ Fork Heads for Scaffold Building
US$3.50-4.60
1,000 Pieces(MOQ)
Horizontal Ledger End/Head for All Round Ringlock Scaffolding
US$0.70-0.96
100 Pieces(MOQ)
Safe Durable Cuplock Scaffolding Brace Head
US$0.72-0.75
1,000 Pieces(MOQ)
Ringlock Scaffolding Ledger Head with Self Black for South American Market
US$0.675-0.75
66,000 Pieces(MOQ)
Steel Solid Screw Base Jack U Head for Australia Kwikstage Scaffolding Construction
US$6.50-9.00
100 Pieces(MOQ)
Building Construction Scaffolding Casting Ledger Head for Pipe Connecting
US$1.25-1.28
66,000 Pieces(MOQ)
Scaffolding Accessories Horizontal Ledger End Ringlock Ledger Head for 48mm
US$970.00-1,000.00
1 Ton(MOQ)
Comaccord U-Shaped Fork Head Galvanized for H20 Beam
US$3.00-3.20
2,000 Pieces(MOQ)
Building Construction Scaffolding Casting Ledger Head for Pipe Fitting
US$0.675-0.75
66,000 Pieces(MOQ)
Construction Large Opening Fork Head with U Type for Scaffolding
US$2.90-4.00
1,000 Pieces(MOQ)
Steel Fork Head for Props Support
US$3.50-4.60
1,000 Pieces(MOQ)
Reliable U-Fork Head for Construction and Support Needs
US$2.48
500 Pieces(MOQ)
Safe Support Hot DIP Galvanized Fork Head for Ringlock Scaffolding
US$2.90-4.00
1,000 Pieces(MOQ)
Quality Assurance Build Stability Base Jack Fork Head for Scaffolding Systems
US$2.99-5.99
1,000 Pieces(MOQ)



















