Powered by Made-in-China.com
Durable Painted H Frame Walk-Through Scaffolding for Safe Access
US$22.00-39.00
200 Pieces
Sample price:US$25.80/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online Technical ServicesWarranty
One YearModel NO.
HH03Material
Q345Type
Mobile ScaffoldingStructural Style
Frame Combined ScaffoldingFramework
Frame Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
High FormworkErection Position
External ScaffoldingMove Method
Horizontal mobile ScaffoldingScaffolding Part Type
Scaffolding FramesConstruction Properties
Building ScaffoldUsage
Building and Construction IndustriesTube Thickness
3mm 3.2mm 3.25mm 3.5mm 4mmLength
1830mmTechnique
Welding, PuchingSurface Treatment
Galvanized/PaintedComponent Parts
Frame:2 Pieces of Shelves, 2 Pairs of Cross Brace,Transport Package
Standard Export PackagingSpecification
H frame scaffolding system & A frame scaffoldingOrigin
ChinaHS Code
73084000Production Capacity
8000000Key features
High Load Capacity: Strong loading capacity ensures safety and stability during construction use.
Easy Erection: Designed for easy assembly, significantly boosting construction productivity.
Durable Material: Constructed from Q345 and Q235 steel with tube wall thickness up to 4mm.
Flexible Customization: Customizable tube thickness, length, and surface treatment per customer request.
Fast Delivery: Stock items ship in 2-5 days; non-stock items typically ship in 7-20 days.
Professional Support: Online technical services available for installation and usage guidance.
Quality Assurance: 100% visual inspection of finished products ensures superior quality.
Versatile Application: Suitable for building and construction industries as external or mobile scaffolding.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤4.44h
About Our Factory & Business Background
AddressCangzhou, Hebei, China
Plant Area5000 square meters
Number of Employees18
Registered Capital10,000,000 RMB
Terms of PaymentT/T, Small-amount payment, Western Union, PayPal, D/P, LC, Money Gram
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW, DAT, FAS, DDP, DAP, CIP, CPT, FCA
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity500pcs
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsSteel Support, Steel Prop, Scaffolding, Scaffolding Clamp, Jack Base, Formwork Spring Clamp
Production Lines10
Production MachinesBending Machine, Shearing Machine, Welding Machine, Laser Cutting Machine, Coating Line, Hole Punching Machine, Pressing Machine, Thread Rolling Machine, CNC Lathe
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2020-06-03
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
Product Q&A
Q:How long is the delivery time?
A:
For stock products, shipments are made in 2-5 days after receiving deposit. For new production with common materials, it takes 7-10 days. For special or rare materials, it requires 15-20 days.
Q:Can you provide samples?
A:
Yes, samples can be provided. The buyer is responsible for the sample charges and courier fees.
Q:What are the payment terms?
A:
We accept a 30% TT down payment and a 70% TT balance, or L/C.
Q:Do you accept customization?
A:
Yes, we accept customization according to customer requests, including tube thickness, length, and surface treatment.
Q:How do you ship the goods?
A:
We usually ship by DHL, UPS, FedEx, or TNT, which takes 3-5 days to arrive. Airline and sea shipping are also optional.
Send Inquiry
*To:
Hebei Haihong Construction Equipment Co., Ltd
Hebei Haihong Construction Equipment Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Bestcon High Quality Galvanized Steel Walk Through Scaffold Frame Scaffolding for Construction
US$650.00-750.00
25 Tons(MOQ)
Walk Through Frame Scaffold H Frame Scaffolding for Exterior Building Construction
US$15.00-60.00
500 Pieces(MOQ)
Reliable Durable Mason Ladder Platform H Frame Scaffolding for Bricklaying Work
US$450.00-650.00
100 Sets(MOQ)
Galvanized Powder Coated Scaffolding Tower H Frame Ladder Walk Through Scaffolding System for Construction
US$4.00-8.00
100 Pieces(MOQ)
Construction Formwork Walk Through Ladder Mason Frame H Frames Braces Scaffolding
US$1.00-5.00
50 Pieces(MOQ)
Cheap Price Painted Walk Through Frame Scaffolding H Frame for Sale
US$15.00-60.00
500 Pieces(MOQ)
H-Frame Walk-Through Scaffolding A572 Galvanized Painted for Construction
US$205.00-550.00
1 Ton(MOQ)
OEM Construction Frame Scaffold Mason Walk Through Steel H Frame Scaffolding for Construction
US$18.00-32.00
99 Pieces(MOQ)
China Factory Galvanized Steel Walk-Through Scaffold Facade H Frame Scaffolding
US$30.00-50.00
50 Sets(MOQ)
Durable Steel Walk Through Frame Scaffolding for Contractors Use
US$1.00-15.00
500 Pieces(MOQ)
Reliable OEM Galvanized Ladder Frame Mason Walk Through Scaffolding for Construction
US$450.00-650.00
100 Sets(MOQ)
Painted Movable Scaffolding Platform Walk Through H Frame Scaffolding
US$760.00-860.00
1 Ton(MOQ)
H Frame Scaffolding Platform Scaffold Walk Through Frame Scaffolding for Construction Andamios Scaff
US$25.00-35.00
10 Sets(MOQ)
Reliable Durable H Frame Steel Frame Scaffolding for Outdoor Painting Work
US$450.00-650.00
100 Sets(MOQ)
Safe Durable CE SGS Passed Mason Frame Scaffolding for Construction
US$25.00-35.00
10 Sets(MOQ)
Steel Mason Main a H Type Walk Through Scaffolding Scaffold Ladder Frame for Construction
US$30.00-50.00
50 Sets(MOQ)
Reliable Heavy Duty Galvanized H Frame Walk Through Scaffolding for Industrial Construction
US$450.00-650.00
100 Sets(MOQ)
H-Type Walk-Through Steel Frame Scaffolding for Construction
US$205.00-550.00
1 Ton(MOQ)



















