Powered by Made-in-China.com
Durable Scaffolding Base Jack for Enhanced Construction Safety
US$3.10-6.80
1,000 Pieces
Sample price:US$5.65/piece.Request sample
Product profile
Customization
AvailableConnection Type
Pin ConnectionFinish
GalvanizedModel NO.
HH010Material
Cast LronType
Base PlatesCustomized Logo
AcceptOther Length
780/820mmSize
34*4mmLength
400cmPlate Size
150*150*5mmOther Size
38*4mm/48*4mmTransport Package
PalletSpecification
34*4*400mmOrigin
ChinaHS Code
73084000Production Capacity
8000000Key features
Customizable Dimensions: Accepts custom logo, length (780/820mm), and size (38*4mm/48*4mm) per request.
High Precision Craftsmanship: Meticulously crafted to surpass stringent construction standards for exceptional accuracy.
Superior Adjustability: Allows precise refinements at every phase for perfect calibration of construction plans.
Versatile Adaptability: Designed to excel across diverse construction settings with unmatched ease and efficiency.
Effortless Installation: Intuitive configuration reduces time and cost, enhancing timelines and economic benefits.
Durable Galvanized Finish: Galvanized or painted surface treatment ensures outstanding durability in harsh conditions.
Flexible Customization: Tailors surface color, length, and thickness to exact specifications for bespoke needs.
Eco-Friendly Reusability: Designed for reusability and adheres to strict environmental standards for sustainable construction.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤2.82h
About Our Factory & Business Background
AddressCangzhou, Hebei, China
Plant Area5000 square meters
Number of Employees18
Registered Capital10,000,000 RMB
Terms of PaymentT/T, Small-amount payment, Western Union, PayPal, D/P, LC, Money Gram
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW, DAT, FAS, DDP, DAP, CIP, CPT, FCA
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity500pcs
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsSteel Support, Steel Prop, Scaffolding, Scaffolding Clamp, Jack Base, Formwork Spring Clamp
Production Lines10
Production MachinesBending Machine, Shearing Machine, Welding Machine, Laser Cutting Machine, Coating Line, Hole Punching Machine, Pressing Machine, Thread Rolling Machine, CNC Lathe
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2020-06-03
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
Product Q&A
Q:How long is the delivery time?
A:
For stock products, shipments are made in 2-5 days after receiving deposit or T/T. For new production with common materials, it takes 7-10 days. For special and rare materials, it usually needs 15-20 days.
Q:Can you provide samples?
A:
Yes, samples can be provided. The sample charge and courier fee are covered by the buyer.
Q:What are the payment terms?
A:
Down payment of 30% TT and balance 70% TT or L/C.
Q:Do you accept customization?
A:
Yes, products can be customized as per the customers' request, including surface color, length, and thickness.
Q:How do you ship the goods and how long does it take?
A:
We usually ship by DHL, UPS, FedEx, or TNT, taking 3-5 days to arrive. Airline and sea shipping are also optional. For mass products, ship freight is preferred.
Send Inquiry
*To:
Hebei Haihong Construction Equipment Co., Ltd
Hebei Haihong Construction Equipment Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Durable Solid Ringlock Scaffolding Base Jack for Safe Construction
US$5.00-10.00
1,000 Pieces(MOQ)
Durable Pre-Galvanized Base Jack for Scaffolding Stability and Safety
US$2.50
2,000 Pieces(MOQ)
Durable Q235 Steel Scaffolding Base Jack for Construction Projects
US$5.50
1 Piece(MOQ)
Scaffolding Screw Base Jack with Forging Handle for Building Construction
US$2.20-2.50
1,000 Pieces(MOQ)
Durable Galvanized Screw Jack Base for Reliable Construction Support
US$2.00-7.00
500 Pieces(MOQ)
Adjustable Height Scaffolding Jack Base Solid Screw Base Jack for Building Construction
US$3.00-8.00
100 Pieces(MOQ)
Construction Scaffolding Base Jack for Scaffolding Solid U Screw Base Jack
US$0.20-0.40
1,000 Pieces(MOQ)
Durable Steel Construction Base Jack with Adjustable Height for Stability
US$4.50-9.00
1 Piece(MOQ)
Galvanized Scaffolding Screw Base Jack for Construction
US$3.00-8.00
100 Pieces(MOQ)
Heavy Duty Scaffold Screw Base Jack Adjustable Scaffolding Support for Building Construction
US$4.00
1,000 Pieces(MOQ)
Durable Q235 Steel U Jack for Scaffolding and Bridge Construction
US$5.50
1 Piece(MOQ)
Scaffolding Construction Screw Jack Base Scaffolding System Base Jack for Building
US$2.00-2.50
100 Piece(MOQ)
Premium Scaffold Prop Jack for Enhanced Safety in Construction
US$5.50
1 Piece(MOQ)
Galvanized Shoring Base Jack 250mm/350mm/500mm for Formwork Scaffolding Construction
US$1.78-3.90
1,000 Pieces(MOQ)
Premium Steel Scaffolding Prop Jack for Enhanced Stability and Durability
US$5.60-6.00
100 Pieces(MOQ)
Painted Steel Scaffolding Square Base Screw Jack for Construction Site
US$5.60-6.00
100 Pieces(MOQ)



















