Powered by Made-in-China.com
Durable Scaffolding Steel Plank for Heavy-Duty Construction Projects
US$4.50-15.00
500 Pieces
Sample price:US$5.60/piece.Request sample
Product profile
Customization
AvailableConnection Type
Pin ConnectionFinish
GalvanizedModel NO.
HH03Material
SteelType
Scaffolding Steel PlankThickness
1.0-2.0mmLength
1m-4mGrade
Q195Package
100piecesMarket
Southeast Asia, MideastEnd
Hook or Without HookUsage
ConstructionTransport Package
Bundle or BulkSpecification
210-500mmHS Code
73084000Production Capacity
200000Key features
Customizable Dimensions: Length, thickness, and surface color can be tailored to specific project requirements.
Hot Dip Galvanized Finish: Provides superior corrosion resistance and durability for long-term construction use.
Heavy-Duty Steel Construction: Made from high-grade steel with thickness 1.0-2.0mm for robust load-bearing capacity.
Multiple Size Options: Available in various widths and lengths (1m-4m) to fit diverse scaffolding systems.
Eco-Friendly & Reusable: Designed for multiple reuses, ensuring reliability and an environmentally friendly approach.
Fast Stock Delivery: Stock items ship within 2-5 days after payment; non-stock items in 7-20 days.
Versatile Application: Suitable for formwork, beams, rafters, columns, and general scaffolding structures.
Flexible Customization: Supports customization from samples, designs, or full customization requests.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤2.45h
About Our Factory & Business Background
AddressCangzhou, Hebei, China
Plant Area5000 square meters
Number of Employees18
Registered Capital10,000,000 RMB
Terms of PaymentT/T, Small-amount payment, Western Union, PayPal, D/P, LC, Money Gram
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW, DAT, FAS, DDP, DAP, CIP, CPT, FCA
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity500pcs
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsSteel Support, Steel Prop, Scaffolding, Scaffolding Clamp, Jack Base, Formwork Spring Clamp
Production Lines10
Production MachinesBending Machine, Shearing Machine, Welding Machine, Laser Cutting Machine, Coating Line, Hole Punching Machine, Pressing Machine, Thread Rolling Machine, CNC Lathe
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2020-06-03
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
Product Q&A
Q:What is the delivery time for orders?
A:
For stock products, shipments are made in 2-5 days after receiving deposit or T/T. For new production with common materials, it takes 7-10 days. For special and rare materials, it usually needs 15-20 days.
Q:Can you provide samples?
A:
Yes, samples can be provided. The sample charge and courier fee are covered by the buyer.
Q:What are the payment terms?
A:
We accept a 30% TT down payment and a 70% TT balance, or L/C.
Q:Is customization available?
A:
Yes, we accept customization according to customer requests, including length, thickness, and surface color.
Q:How do you ship the goods?
A:
We usually ship by DHL, UPS, FedEx, or TNT, which takes 3-5 days to arrive. Airline and sea shipping are also optional. For mass products, sea freight is preferred.
Send Inquiry
*To:
Hebei Haihong Construction Equipment Co., Ltd
Hebei Haihong Construction Equipment Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy Duty Perforated Galvanized Stainless Steel Scaffold Plank for Ringlock and Cuplock Scaffolding System
US$1,100.00-1,350.00
20 Tons(MOQ)
Reliable Heavy Duty Precision Welding Metal Ringlock Scaffolding Planks for Mining Sites
US$1,100.00-1,350.00
20 Tons(MOQ)
Heavy-Duty Steel Catwalk Plank for Ultimate Anti-Slip Safety
US$10.00-20.00
500 Pieces(MOQ)
Reliable OEM Heavy Gauge 48.3mm Diameter Metal Scaffolding Planks for Dam Projects
US$1,100.00-1,350.00
20 Tons(MOQ)
Reliable Heavy Duty Q345 Steel Metal Scaffolding Planks for Wind Power Projects
US$1,100.00-1,350.00
20 Tons(MOQ)
HDG Scaffolding Steel Plank Ladder Scaffolding Pedal for Construction Building
US$10.00-30.00
100 Pieces(MOQ)
Customizable Heavy-Duty Steel Planks for Ladder Frame Systems
US$10.00-20.00
500 Pieces(MOQ)
Durable Pre-Galvanized Steel Scaffolding Plank for Construction Projects
US$10.00-20.00
500 Pieces(MOQ)
Heavy Duty Q235 Steel Planks for Construction Equipment Tools
US$5.20-9.00
1 Piece(MOQ)
Heavy-Duty Galvanized Scaffolding Planks for Construction Sites - Slip-Resistant & 3-Year Warranty Sale
US$13.00-20.00
100 Pieces(MOQ)
Wear Resistant Scaffolding Plank Durable Heavy Foot Traffic Construction Area
US$5.00-10.00
1,000 Pieces(MOQ)
SGS Certified Heavy Duty Steel Plank for Construction Safety
US$10.00-20.00
500 Pieces(MOQ)
Heavy Duty Construction Galvanized Steel Scaffolding Plank Metal Board
US$5.20-9.00
1 Piece(MOQ)
Anti Slip Punched Scaffolding Steel Plank for Construction Site Working Platform
US$7.00-30.00
100 Pieces(MOQ)
Steel Scaffold Plank System Heavy-Duty Light Galvanized Finish for Durable Construction Building
US$5.20-9.00
1 Piece(MOQ)
Hot-DIP Galvanized Anti-Slip Steel Scaffold Plank for Construction Scaffolding
US$13.00-20.00
100 Pieces(MOQ)
Steel Plank Manufacturer Q235 Construction Metal Plank Board for Heavy Duty Use
US$4.00-6.80
50 pieces(MOQ)
Versatile Steel Plank OEM for Affordable Construction Projects and Structures
US$8.50-10.00
1,000 Pieces(MOQ)
Durable Scaffold Plank for Construction Projects and Building Needs
US$5.20-9.00
1 Piece(MOQ)
Galvanized Scaffolding Steel Plank or Walk Board for Construction Sell Well
US$13.00-20.00
100 Pieces(MOQ)



















