Powered by Made-in-China.com
Heavy-Duty Scaffolding Wedge Clamp for Reliable Construction Use
US$0.20-0.50
1,000 Pieces
Sample price:US$0.50/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online Technical SupportWarranty
One YearsModel NO.
HH05Material
SteelType
Formwork AccessoriesProduct Size
104*41mm 115*52mmOther Weight
We Can Make According to Your Drawing or SampleDelivery Time
20days-35daysSurface
Galvanized or PaintedName
Column Formwork Clamp,Casting Wedge Clamp,Transport Package
Wooden Case or PalletSpecification
400g 510gOrigin
ChinaHS Code
7308400000Production Capacity
200000Key features
Customizable Dimensions: Available in 104*41mm, 115*52mm, or fully customized per drawing/sample.
Durable Surface Treatment: Galvanized or painted finish for enhanced corrosion resistance and longevity.
High-Quality Materials: Constructed from premium steel or cast iron for heavy-duty construction use.
Fast Stock Delivery: Shipments dispatched within 2-5 days for stock items after payment confirmation.
Professional Support: Online technical support available to assist with installation and usage.
Flexible Customization: Accepts full customization including size, weight, and surface based on requests.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤2.65h
About Our Factory & Business Background
AddressCangzhou, Hebei, China
Plant Area5000 square meters
Number of Employees18
Registered Capital10,000,000 RMB
Terms of PaymentT/T, Small-amount payment, Western Union, PayPal, D/P, LC, Money Gram
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW, DAT, FAS, DDP, DAP, CIP, CPT, FCA
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity500pcs
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsSteel Support, Steel Prop, Scaffolding, Scaffolding Clamp, Jack Base, Formwork Spring Clamp
Production Lines10
Production MachinesBending Machine, Shearing Machine, Welding Machine, Laser Cutting Machine, Coating Line, Hole Punching Machine, Pressing Machine, Thread Rolling Machine, CNC Lathe
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2020-06-03
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
Product Q&A
Q:How long is the delivery time?
A:
For stock products, shipments are made in 2-5 days after receiving deposit or T/T. For new production with common materials, it takes 7-10 days. For special and rare materials, it usually needs 15-20 days. For all stock material, the delivery time is 7 days.
Q:Can you provide samples?
A:
Samples can be provided, but the sample charge and courier fee are borne by the buyer's side.
Q:What are the payment terms?
A:
Down payment of 30% TT and balance 70% TT or L/C.
Q:Do you accept customization?
A:
Yes, we can customize products according to customers' requests, including size, weight, and surface.
Q:How do you ship the goods and how long does it take?
A:
We usually ship by DHL, UPS, FedEx, or TNT, which usually takes 3-5 days to arrive. Airline and sea shipping are also optional. For mass products, ship freight is preferred.
Send Inquiry
*To:
Hebei Haihong Construction Equipment Co., Ltd
Hebei Haihong Construction Equipment Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty Steel Formwork Clamp for Quick Construction Projects
US$3.90-5.00
500 Pieces(MOQ)
Heavy Duty Zinc Plated Rebar Wedge Clamp for Concrete Construction
US$0.50-1.00
500 Pieces(MOQ)
Hanpiao Factory Supplying Galvanized Heavy Duty Bfd Lock Panel Clamp for Construction Formwork
US$0.0125
5,000 Pieces(MOQ)
Heavy-Duty Frog Clamp for Reliable Construction and DIY Tasks
US$0.50-1.00
500 Pieces(MOQ)
Heavy-Duty Wedge Clamp for Formwork with Sturdy Pin
US$3.90-5.00
500 Pieces(MOQ)
Heavy Duty Galvanized Steel Wedge Formwork Clamp for Concrete Construction Projects
US$5.80-10.00
1,000 Pieces(MOQ)
Heavy-Duty Formwork Wedge Clamp for Bfd Doka Framax Clamp Concrete Formwork Assembly
US$3.50-6.50
1,000 Pieces(MOQ)
Heavy-Duty Spring Clamp for Secure Formwork and Construction Needs
US$0.20-0.50
10,000 Pieces(MOQ)
Heavy Duty Steel Wedge Clamp for Doka Formwork System
US$3.80-4.60
2,000 Pieces(MOQ)
Heavy-Duty Construction Formwork Spring Clamp for Rapid Installation
US$0.20-0.50
10,000 Pieces(MOQ)
Heavy Duty Steel Snap Tie Wedges a Bracket Jahn a Bracket/Jahn a Clamp for Snap Tie
US$5.00
1,000 Pieces(MOQ)
Durable Scaffolding Wedge Clamp for Safe Construction Use
US$0.20-0.50
1,000 Pieces(MOQ)
Versatile Scaffolding Wedge Clamp for Reliable Construction Support
US$0.20-0.50
1,000 Pieces(MOQ)
Heavy-Duty Ajustable Rasto Type Corner Formwork Clamp for Construction Formwork System
US$10.00-20.00
1,000 Pieces(MOQ)
Heavy-Duty H20 Timber Beam Clamp for Construction Projects
US$0.50-1.00
1,000 Pieces(MOQ)
Metal Pressed Scaffolding Formworks Coupler Clip Formwork Steel Rapid Fast Spring Clamps for Construction Formwork
US$0.50-0.70
1,000 Pieces(MOQ)
Framax Formwork Accessories Adjustable Template Clamp for Doka System Scaffolding Clamp Construction
US$4.20-5.60
1,000 Pieces(MOQ)
Durable Scaffolding Formwork Wedge Clamp for Construction Projects
US$0.20-0.50
1,000 Pieces(MOQ)



















