Powered by Made-in-China.com
Heavy-Duty Wedge Lock Clamp for Secure Industrial Applications
US$0.65-0.68
1,000 Pieces
Sample price:US$0.68/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online Technical ServicesWarranty
One YearsModel NO.
HH01Material
Ductile Iron 450-10Type
MobileStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
High FormworkErection Position
External ScaffoldingMove Method
Integral Lifting ScaffoldingScaffolding Part Type
Scaffolding FramesConstruction Properties
Installation ScaffoldTechnics
CastingSurface Treatment
GalvanizedProcess
CastingCustomized Logo
AcceptColor
White or YellowDelivery Time
15-20daysTransport Package
Woven Bags +Steel PalletSpecification
VariousOrigin
ChinaHS Code
8205700000Production Capacity
800000Key features
Durable Ductile Iron Material: Crafted from Ductile Iron 450-10 with extraordinary tensile strength for unmatched resilience.
Corrosion Resistant Galvanized Finish: Electroplated surface treatment provides superior protection against wear and corrosion.
Customizable Color Options: Available in White or Yellow to align with specific project requirements.
Accept Customized Logo: Customized logo service is accepted to meet branding needs.
Comprehensive Warranty Coverage: One-year warranty provided for mechanical defects and performance issues.
Online Technical Support: Professional online technical services available to assist with installation and usage.
Versatile Construction Applications: Suitable for skyscrapers, bridges, tunnels, and nuclear power plants.
Sustainable Reusable Design: Products are crafted for reuse, adhering to high green standards.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤2.63h
About Our Factory & Business Background
AddressCangzhou, Hebei, China
Plant Area5000 square meters
Number of Employees18
Registered Capital10,000,000 RMB
Terms of PaymentT/T, Small-amount payment, Western Union, PayPal, D/P, LC, Money Gram
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW, DAT, FAS, DDP, DAP, CIP, CPT, FCA
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity500pcs
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsSteel Support, Steel Prop, Scaffolding, Scaffolding Clamp, Jack Base, Formwork Spring Clamp
Production Lines10
Production MachinesBending Machine, Shearing Machine, Welding Machine, Laser Cutting Machine, Coating Line, Hole Punching Machine, Pressing Machine, Thread Rolling Machine, CNC Lathe
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2020-06-03
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
Product Q&A
Q:How long can make delivery?
A:
For stock products, will make shipments in 2-5 days after receiving deposit or receiving T/T, for products need new production for common materials, usually make shipments in 7-10 days for products need new special and rare materials, usually need 15-20 days to make shipment
Q:Could you provide sample?
A:
Samples can be provided with samples' charge and courier fee by the buyer's side
Q:What's your payment terms?
A:
Down payments 30%TT and balance 70% TT or L/C.
Q:Can you accept customize?
A:
Yes. lt can be customized as per the customers' request.
Q:How is your delivery time?
A:
We always prepare enough stock material for your urgent requirement. The delivery time is 7days for all the stock material. We will check with our production department for the non-stock items to offer you the exact delivery time and producing schedule.
Send Inquiry
*To:
Hebei Haihong Construction Equipment Co., Ltd
Hebei Haihong Construction Equipment Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty Wedge Lock Clamp for Maximum Stability and Grip
US$0.65-0.68
1,000 Pieces(MOQ)
Heavy-Duty BS1139 Lock Beam Clamp for Secure Safety Solutions
US$1.082
2,750 Pieces(MOQ)
Heavy-Duty Adjustable Wedge Lock Clamp for Enhanced Stability
US$0.65-0.68
1,000 Pieces(MOQ)
Heavy-Duty Scaffold Tube Coupler Swivel Clamp for Secure Scaffolding Structures
US$0.90
5,000 Pieces(MOQ)
Multi-Purpose Wedge Lock Clamp for Secure Fastening Solutions
US$0.65-0.68
1,000 Pieces(MOQ)
Heavy-Duty BS1139 Safety Beam Clamps for Secure Locking Solutions
US$1.082
2,750 Pieces(MOQ)
Heavy-Duty BS1139 Safety Lock Beam Clamps for Construction
US$1.082
2,750 Pieces(MOQ)
Durable Casted Wedgelock Clamp Kit for Heavy-Duty Formwork Needs
US$0.65-0.68
1,000 Pieces(MOQ)
Heavy-Duty Swivel Clamps for Precision Positioning and Secure Holding
US$1.00-1.60
999 Pieces(MOQ)
Heavy-Duty BS1139 En74 JIS Clamp for Scaffolding Projects
US$0.90-1.00
500 Pieces(MOQ)
Formwork Panel Clamp Wedge Lock Clamp for Concrete Formwork
US$4.80-6.80
100 Pieces(MOQ)
Durable Scaffold Tube Pressed Swivel Coupler Scaffolding Clamp for Industrial Applications
US$0.90
5,000 Pieces(MOQ)
Heavy-Duty Bfd Formwork Clamp for Concrete Construction Support
US$5.49-6.28
5,000 Pieces(MOQ)
Premium Heavy-Duty Aluminum Scaffolding Clamp for Ultimate Safety
Negotiable
1 Set(MOQ)
Heavy-Duty Galvanized Steel Scaffold Clamp for En74 Standards
US$0.90-1.00
500 Pieces(MOQ)
Heavy Duty Steel Construction Formwork Spring Rapid Clamp for Scaffolding
US$1.31-1.45
1,000 Pieces(MOQ)
Secure Scaffold Tube Swivel Coupler Durable Clamp for Scaffolding Applications
US$0.90
5,000 Pieces(MOQ)
Heavy-Duty Scaffolding Clamp for Peri and Doka Systems
US$5.29-6.26
5,000 Pieces(MOQ)
Heavy-Duty Scaffolding Clamp for Peri Doka Formwork Systems
US$5.29-6.26
5,000 Pieces(MOQ)
Heavy-Duty Drop Forged Scaffolding Board Clamp for Construction
US$0.50-1.00
1,000 Pieces(MOQ)



















