Powered by Made-in-China.com
Premium Scaffold Jack Base for Secure and Safe Building Projects
US$3.10-6.80
1,000 Pieces
Sample price:US$5.65/piece.Request sample
Product profile
Customization
AvailableConnection Type
Pin ConnectionFinish
GalvanizedModel NO.
HH04Material
Cast LronType
Base PlatesCustomized Logo
AcceptOther Length
780/820mmSize
34*4mmLength
400cmPlate Size
150*150*5mmOther Size
38*4mm/48*4mmTransport Package
PalletSpecification
34*4*400mmOrigin
ChinaHS Code
73084000Production Capacity
8000000Key features
Customizable Specifications: Surface color, length, and thickness can be tailored to exact customer requirements.
High Precision Craftsmanship: Meticulously crafted to surpass stringent construction standards for exceptional accuracy.
Superior Durability: Engineered for outstanding reliability and optimal performance in harsh conditions.
Versatile Adaptability: Designed to excel across diverse construction settings with seamless integration.
Effortless Installation: Intuitive design reduces time and cost, enhancing efficiency and economic benefits.
Galvanized Finish Options: Available in Galvanized or Painted finishes for enhanced corrosion resistance.
Flexible Customization: Accepts customized logos and specific dimensions like 780/820mm lengths.
Eco-Friendly Design: Products adhere to strict environmental standards and are designed for reusability.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤2.41h
About Our Factory & Business Background
AddressCangzhou, Hebei, China
Plant Area5000 square meters
Number of Employees18
Registered Capital10,000,000 RMB
Terms of PaymentT/T, Small-amount payment, Western Union, PayPal, D/P, LC, Money Gram
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW, DAT, FAS, DDP, DAP, CIP, CPT, FCA
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity500pcs
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsSteel Support, Steel Prop, Scaffolding, Scaffolding Clamp, Jack Base, Formwork Spring Clamp
Production Lines10
Production MachinesBending Machine, Shearing Machine, Welding Machine, Laser Cutting Machine, Coating Line, Hole Punching Machine, Pressing Machine, Thread Rolling Machine, CNC Lathe
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2020-06-03
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
Product Q&A
Q:How long is the delivery time?
A:
For stock products, shipments are made in 2-5 days after receiving deposit or T/T. For new production with common materials, it takes 7-10 days. For special and rare materials, it usually needs 15-20 days.
Q:Can you provide samples?
A:
Samples can be provided, but the sample charge and courier fee are borne by the buyer.
Q:What are your payment terms?
A:
Down payment of 30% TT and balance 70% TT or L/C.
Q:Do you accept customization?
A:
Yes, we accept customization as per the customers' request, including surface color, length, and thickness.
Q:How do you ship the goods?
A:
We usually ship by DHL, UPS, FedEx, or TNT, which takes 3-5 days to arrive. Airline and sea shipping are also optional. For mass products, ship freight is preferred.
Send Inquiry
*To:
Hebei Haihong Construction Equipment Co., Ltd
Hebei Haihong Construction Equipment Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
China Product U Head Base Jack Hollow and Solid Screw Base Scaffolding Jack Base for Construction
US$2.00-4.00
1,000 Pieces(MOQ)
Hot Sale Casted Jack Nut Used for Construction Base Jack Nut for Formwork and Tie Rod Scaffolding/Scaffold Base Jack
US$1.10-1.33
1,000 Pieces(MOQ)
Jack Base Scaffolding Screw Jack Base for Building Materials
US$3.40-3.60
2,000 Pieces(MOQ)
Screw Jack Scaffolding Ringlock System Jack Base for Building Materials
US$3.90-4.00
2,000 Pieces(MOQ)
Construction Building Material Scaffolding Swivel Jacks Formwork Clamp Screw Jack Base
US$0.20-0.40
1,000 Pieces(MOQ)
Building Material Scaffolding System Post Anchor Screw Jack Base
US$3.00-6.00
500 Sets(MOQ)
Scaffolding Formwork System Jack Base for Building Material
US$3.40-3.60
2,000 Pieces(MOQ)
Jack Base and U Head Adjustable Base Screw for Metal Scaffolding Frame
US$2.00-7.00
500 Pieces(MOQ)
Adjustable Jack Base for Stable Support and Safety
US$3.00-10.00
300 Pieces(MOQ)
High-Quality U Head Jack Base for Heavy Duty Scaffold Support
US$4.03
500 Pieces(MOQ)
Building Material Scaffold Construction 600mm Fitting Steel Scaffolding Prop Hardware U Head Jack Base
US$5.00-5.16
300 Pieces(MOQ)
Scaffolding Galavnized Jack Base for Building Material
US$3.40-3.60
2,000 Pieces(MOQ)
U Head Base Jack Hollow and Solid Scaffolding Steel Screw Base Jack for Construction
US$600.00-800.00
10 Tons(MOQ)
Durable Adjustable Scaffold Base Jack for Secure Construction Projects
US$3.10-6.80
1,000 Pieces(MOQ)
Precision Threaded Screw Jack Base for High-Rise Building Support
US$2.00-7.00
500 Pieces(MOQ)
Premium Adjustable Scaffold Base Jack for Secure Worksites
US$3.10-6.80
1,000 Pieces(MOQ)
Building Material Steel Scaffolding Prop Zinc Plated Q235 Scaffold Pipe Screw Jack Base
US$3.69-3.80
300 Pieces(MOQ)
Reliable Scaffold Screw Jack Base for Safe Construction Projects
US$3.10-6.80
1,000 Pieces(MOQ)
Premium Electro-Galvanized Screw Jack Base for Heavy Loads
US$2.00-7.00
500 Pieces(MOQ)



















