Powered by Made-in-China.com
Shelf Fastener Hand Bracket Fastener Forged Double Joint Fasteners for Scaffolding Pipe
US$0.56-1.34
2,000 Pieces
Sample price:US$1.42/piece.Request sample
Product profile
Customization
AvailableConnection Type
Clamp ConnectionFinish
Eletro Galvanized/ Hot DIP GalvanizedModel NO.
HH017Material
Q235Type
Scaffold CouplersWeight
0.65-1.5kgMOQ
500 PCSApplication
Construction/ ConnectMake Process
Pressed/ DropedTransport Package
Standard Export PackingSpecification
48/48 48/60 48/56Origin
ChinaHS Code
73084000Production Capacity
8000000Key features
Versatile Scaffold System: Widely used for building engineering with simple processing, low cost, and high economy.
Durable Galvanized Finish: Available in Electro Galvanized or Hot Dip Galvanized for strong corrosion resistance.
Customizable Dimensions: Surface color, length, and thickness can be customized according to customer requests.
High Safety Standards: All materials meet environmental protection requirements and emphasize safety for reuse.
Flexible Installation: Easy and flexible to install with strong versatility suitable for external and internal scaffolding.
Diverse Coupler Types: Includes Double, Swivel, Putlog, Board Retaining, Sleeve, and Beam couplers for various needs.
OEM and ODM Services: Full customization, minor customization, and flexible customization options available.
Fast Stock Delivery: Stock materials are shipped within 2-5 days after deposit or 7 days for urgent requirements.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤2.38h
About Our Factory & Business Background
AddressCangzhou, Hebei, China
Plant Area5000 square meters
Number of Employees18
Registered Capital10,000,000 RMB
Terms of PaymentT/T, Small-amount payment, Western Union, PayPal, D/P, LC, Money Gram
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW, DAT, FAS, DDP, DAP, CIP, CPT, FCA
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity500pcs
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsSteel Support, Steel Prop, Scaffolding, Scaffolding Clamp, Jack Base, Formwork Spring Clamp
Production Lines10
Production MachinesBending Machine, Shearing Machine, Welding Machine, Laser Cutting Machine, Coating Line, Hole Punching Machine, Pressing Machine, Thread Rolling Machine, CNC Lathe
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2020-06-03
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
Product Q&A
Q:How long can you make delivery?
A:
For stock products, shipments are made in 2-5 days after receiving deposit or T/T. For common materials requiring new production, shipments take 7-10 days. For special and rare materials, it usually takes 15-20 days.
Q:Could you provide samples?
A:
Samples can be provided, but the buyer must pay the sample charge and courier fee.
Q:What are your payment terms?
A:
We accept 30% down payment via TT and 70% balance via TT, or L/C.
Q:Can you accept customization?
A:
Yes, products can be customized as per customer requests, including surface color, length, and thickness.
Q:How is your delivery time?
A:
We keep enough stock material for urgent requirements with a 7-day delivery time. For non-stock items, we check with the production department to offer the exact schedule.
Send Inquiry
*To:
Hebei Haihong Construction Equipment Co., Ltd
Hebei Haihong Construction Equipment Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Forged Double Joint Fasteners for Scaffolding Pipe Joints in Hebei Production
US$0.56-1.34
2,000 Pieces(MOQ)
Steel Pipe Scaffolding Fastener Forged Double Joint Fasteners for Scaffolding Pipe
US$0.56-1.34
2,000 Pieces(MOQ)
Reliable Multi-Use Scaffolding Fasteners for Steel Pipe Connections
US$0.10
1 Piece(MOQ)
Heavy-Duty Forged Double Joint Fasteners for Scaffolding Pipes
US$0.56-1.34
2,000 Pieces(MOQ)
Drop Forged Double Couples Universal Fastener for Scaffolding Fastener Wholesale
US$0.56-1.34
2,000 Pieces(MOQ)
Multi-Use Construction Fastener for Durable Steel Pipe Scaffolding
US$0.10
1 Piece(MOQ)
Premium BS/JIS Pressed Forged Scaffolding Fasteners for Construction
US$1.00-2.00
2,000 Pieces(MOQ)
Durable Steel Pipe Fastener for Reliable Scaffolding Construction Link
US$0.10
1 Piece(MOQ)
Multi-Use Steel Pipe Fasteners for Durable Construction and Scaffolding
US$0.10
1 Piece(MOQ)
Cangzhou Wholesale CE Certified Forged Scaffold Fastener for 48.3 mm Scaffolding Systems
US$0.50-2.00
2,000 Pieces(MOQ)
China Wholesale Durable BS/JIS Certified Scaffolding Fasteners for Global Construction Needs
US$1.00-2.00
2,000 Pieces(MOQ)
Scaffolding System Accessories Q235 Forged Pressed Scaffolding Coupler Fastener
US$1.31-1.45
1,000 Pieces(MOQ)
Versatile 610g Scaffolding Board Fastener for Secure Retention
US$0.643
2,750 Pieces(MOQ)
Premium Durable Scaffolding Solutions with Steel Pipe Fasteners
US$1.00
1,000 Pieces(MOQ)
En74 Pressed T-Bolt Sleeve Pipe Right Angle Board Retain Fastener
US$2.00-4.50
1,000 Pieces(MOQ)
Premium Galvanized Scaffolding Fasteners for Global Export Needs
US$1.31-1.45
1,000 Pieces(MOQ)
Pressed Beam BRC Scaffolding Right Angle Sleeve Steel En74 Hot Dipped Galvanized Fastener
US$2.00-4.50
1,000 Pieces(MOQ)
Best Quaility Heavy-Duty Scaffold Fasteners for Enhanced Job Site Safety
US$16.80-37.50
1,000 Pieces(MOQ)



















