Powered by Made-in-China.com
Versatile Pressed Fencing Clamp for Galvanized Scaffold Pipes
US$0.10-0.50
1,000 Pieces
Sample price:US$0.50/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online Technical SupportWarranty
One YearsModel NO.
HH04Material
SteelType
FixedStructural Style
Tube and Clamp ScaffoldingFramework
Lattice Member Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
High FormworkErection Position
External ScaffoldingMove Method
Integral Lifting ScaffoldingScaffolding Part Type
Scaffolding FramesConstruction Properties
Installation ScaffoldWeight
0.12kgsTest Standard
En74bPipe Size
for 40mm Square PipeSurface Finishing
GalvanizedTransport Package
Cartons Woven Bags Steel PalletsSpecification
48.3mm X 48.3mmOrigin
ChinaHS Code
730890Production Capacity
8000000Key features
Galvanized Steel Construction: Made from electro-galvanized steel strips for durability and eco-friendly performance.
Customizable Dimensions: Surface color, length, and thickness can be customized to meet specific requirements.
Versatile Application: Ideal for securing PVC fencing panels to 48.3mm pipes with unwavering reliability.
One-Year Warranty: Covers mechanical defects for a period of one year from the date of purchase.
Online Technical Support: Dedicated online support team available to assist with installation and usage queries.
Eco-Friendly Design: Reduces waste and preserves natural resources through reusable and sustainable design.
OEM and ODM Services: Full customization, minor customization, and design-based customization services available.
Fast Stock Delivery: Stock items are shipped within 2-5 days after deposit or T/T receipt.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤3.82h
About Our Factory & Business Background
AddressCangzhou, Hebei, China
Plant Area5000 square meters
Number of Employees18
Registered Capital10,000,000 RMB
Terms of PaymentT/T, Small-amount payment, Western Union, PayPal, D/P, LC, Money Gram
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW, DAT, FAS, DDP, DAP, CIP, CPT, FCA
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity500pcs
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsSteel Support, Steel Prop, Scaffolding, Scaffolding Clamp, Jack Base, Formwork Spring Clamp
Production Lines10
Production MachinesBending Machine, Shearing Machine, Welding Machine, Laser Cutting Machine, Coating Line, Hole Punching Machine, Pressing Machine, Thread Rolling Machine, CNC Lathe
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2020-06-03
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
Product Q&A
Q:How long can you make delivery?
A:
For stock products, shipments are made in 2-5 days after receiving deposit or T/T. For common materials requiring new production, shipments usually take 7-10 days. For special and rare materials, it usually needs 15-20 days to make shipment.
Q:Could you provide samples?
A:
Samples can be provided, but the buyer must cover the sample charge and courier fee.
Q:What are your payment terms?
A:
Down payment 30% TT and balance 70% TT or L/C.
Q:Can you accept customization?
A:
Yes, it can be customized as per the customers' request.
Q:How is your delivery time?
A:
We always prepare enough stock material for urgent requirements. The delivery time is 7 days for all stock materials. For non-stock items, we check with our production department to offer the exact delivery time and producing schedule.
Send Inquiry
*To:
Hebei Haihong Construction Equipment Co., Ltd
Hebei Haihong Construction Equipment Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Construction Site Building Scaffolding 48mm Pipe Clamp Clip for Fence PVC Panel
US$0.30-0.33
5,000 Pieces(MOQ)
Quick Release Pipe Clamp Fitting for Fence
US$1.05-3.35
500 Pieces(MOQ)
Scaffold Pipe Fitting Accessories Drop Forged Pressed Scaffolding Clamp for Construction Tubular Scaffolding
US$0.60-2.50
1,000 Pieces(MOQ)
Scaffolding Pipe Fittings Drop Forged Couplers Pressed Clamp Swivel Clamp for Building Material
US$0.70-2.50
1 Piece(MOQ)
Durable Versatile Clamp for Secure Galvanized Pipe Support
US$0.10-0.50
1,000 Pieces(MOQ)
Premium Quality Scaffolding Clamp for Pipe Fencing Solutions
US$0.10-0.50
1,000 Pieces(MOQ)
Durable Galvanized Pipe Fencing Clamp for Secure Scaffolding
US$0.10-0.50
1,000 Pieces(MOQ)
Quick Release Pipe Clamp Bracket for Fence
US$1.05-3.35
500 Pieces(MOQ)
Easy Scaffolding British Ddrop Forged Pressed Pipe Swivel Putlog Clamp for 48mm Pipe
US$1.23-1.56
2,000 Pieces(MOQ)
High Quality Scaffolding Pressed Galvanized Fence Pipe Clamp
US$0.52-0.58
1,000 Pieces(MOQ)
Versatile Scaffolding Pipe Clamp for Safe Building Projects
US$600.00
1,000 Tons(MOQ)
Versatile Scaffolding Clamp Designed for Galvanized Pipe Use
US$0.10-0.50
1,000 Pieces(MOQ)
Scaffolding Pressed Galvanized Fence Pipe Clamp
US$0.295-0.56
200 Pieces(MOQ)
Pressed Galvanized Steel Pipe Fence Clamp (FF-0110)
US$0.90-2.10
10,000 Pieces(MOQ)
Japanese Type Pressed Swivel Scaffolding Couplers Swivel Clamps for Pipe
US$0.85
1,000 Pieces(MOQ)
Types of Pipe Clamp for Scaffold Scaffolding Swivel Coupler
US$1.62-1.76
1,000 Pieces(MOQ)
Metal Pressed D&L Frame Scaffold Lock Pipe Clamp
US$0.90-1.40
100 Pieces(MOQ)
Forged Double Joint Fasteners for Scaffolding Pipe Galvanized Scaffold Clamp
US$1.00-1.50
5,000 Pieces(MOQ)



















