Powered by Made-in-China.com
Wooden Pallet 1 Year Cast Iron Manhole Bright Surface Lid
US$2.35-35.42
1 Set
Product specifications
Size
Grade
Sample price:US$10.00/set.Request sample
Product profile
Customization
AvailableAfter-sales Service
Online Technical SupportWarranty
1 YearModel NO.
B125Material
Cast Iron Manhole CoverrShape
Shape Round ShapeCertification
RoHS, ISO, CECan It Be Customized
YesFeature
DurableColor
BlackApplication
Road/BridgesUsage
Parking SafetyBrand
Logo or CustomizedStandard
En124Number of Reflective Surfaces
Single-SideKeywords
Road Barrier PostsWeight
Half WeightMolding Process
Gravity CastingService
OEM/ODMTransport Package
Wooden PalletSpecification
700mmTrademark
HaiyoudaOrigin
Shandong ChinaHS Code
7325109000Production Capacity
5000000PCS/MonthKey features
Full Load Grade Range: Options from A15 to F900 for sidewalks, highways, ports, and airports.
Anti-Theft Design: Built-in concealed locks and low-recycling-value material reduce theft risk.
Noise Reduction Technology: EPDM rubber pad reduces noise from 70-80 dB to 50-60 dB for residential areas.
Superior Corrosion Resistance: 5x better than ordinary steel; surface treatments include galvanizing and painting.
Customizable Dimensions: Standard sizes 500-1000mm plus full customization for non-standard requirements.
OEM/ODM Services: Custom logos, text, and patterns available with flexible customization options.
Company profile
Business Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 3 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.33h
About Our Factory & Business Background
AddressLiaocheng, Shandong, China
Registered Capital10,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union
International Commercial Terms(Incoterms)CIF, CFR, EXW, FOB
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsCasting, Machining Part, Manhole, Drainage Cover, Square Manhole Cover, Cast Iron Manhole Cover, Ductile Iron Manhole Cover, Drain Grating, Cast Iron Manhole
R&D Engineers2 people
Test Reports for Raw MaterialsOthers
Our Industry Experience & Global Business Record
Year of Establishment2020-03-18
Main MarketsDomestic
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:When can I get the quotation?
A:
We usually provide a quotation within 4 hours after receiving your inquiry. If you urgently need to obtain the price, please call us or specify it in the email. We will give priority to processing your inquiry.
Q:Can the product be customized? What is the production cycle of the product?
A:
After the goods are ordered, we can customize them according to the special requirements of the customers by adopting the latest technology. The production cycle depends on the quantity of orders and the type of products. Under normal circumstances, production can be completed within 15 working days after the order is confirmed.
Q:What are the delivery terms of your company?
A:
We accept various methods such as factory delivery (EXW), Free on Board (FOB), cost and Freight (CFR), and CIF. You can choose the most convenient and cost-effective option.
Q:What about the transportation costs and delivery time?
A:
This depends on the volume of the goods, the mode of transportation (sea/air/express) and the destination port/airport you specify. We would be most grateful if you could provide relevant information so that we can accurately calculate the cost.
Q:What certifications can your company provide?
A:
We can provide CE certification, ISO 9001 quality system certification, third-party calibration certificates (CNAS) and factory inspection reports.
Send Inquiry
*To:
Shandong Haiyouda Special Steel Co., Ltd.
Shandong Haiyouda Special Steel Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
En124 Class B125 Double Seal Black Round Cast Iron Manhole Lid
US$3.00-95.00
10 Pieces(MOQ)
Heavy Duty, Easy to Maintain Cast Iron Drain Cover/Sewer Lid/Manhole Lid.
US$650.00-700.00
1 Ton(MOQ)
Single-Side 1 Year Haiyouda Wooden Pallet Drainage Channel Lockable Lid
US$2.35-35.42
1 Set(MOQ)
Online Technical Support RoHS Approved Haiyouda Wooden Pallet Drainage Bright Surface Lid
US$2.35-35.42
1 Set(MOQ)
SMC Manhole Access Lid with Anti-Slip Surface and Water Proof Sealing
US$10.00-60.00
20 Pieces(MOQ)
Durable Cast Iron Well Lid with Anti-Slip Surface for Secure Access
US$650.00-700.00
1 Ton(MOQ)
Round Composite Resin Manhole Cover B125 Heavy Duty Square Cast Iron Drainage Well Lid
US$700.00-900.00
1 Ton(MOQ)
Heavyweight Cast Iron Manhole Cover and Well Lid - Custom Colors Available
US$650.00-700.00
1 Ton(MOQ)
Iron 1 Year Haiyouda Wooden Pallet 700mm Drainage Lockable Lid
US$2.35-35.42
1 Set(MOQ)
Wooden Pallet ISO Approved Haiyouda 700mm Cast Iron Manhole Lockable Lid
US$2.35-35.42
1 Set(MOQ)
Access Manhole Lid for Telecommunications Well SMC OEM
US$12.50-20.00
100 Sets(MOQ)
Cast Iron Alternative: Non-Magnetic SMC Composite Cable Trench Lids
US$9.00-25.00
100 Pieces(MOQ)
Water Proof Composite Manhole Lid for Industrial, Residential, and Municipal
US$10.00-60.00
20 Pieces(MOQ)
En124 K2c Telecom Manhole Cover/Lid/Grate
US$850.00-1,200.00
2 Tons(MOQ)
Spheroidal Graphite Cast Iron Alternative - Lightweight GRP Road Lid
US$10.00-40.00
100 Pieces(MOQ)
Premium Cast Iron Cooking Lid for Ultimate Heat Retention
US$1,200.00-1,350.00
1 Ton(MOQ)
Composite SMC Material Telecom Manhole Access Lid Wholesale
US$10.00-60.00
20 Pieces(MOQ)
Bulk Supply Factory Outlet Square Manhole Lid for Large Infrastructure Order
US$9.00-39.00
100 Pieces(MOQ)
En124 K2c Telecom Manhole Cover/Lid
US$850.00-1,200.00
2 Tons(MOQ)
Integrated Square-to-Round Composite Manhole Lid for Modern Infrastructure
US$9.50-30.00
100 Pieces(MOQ)



















