SourcingAI
Try for free
Powered by Made-in-China.com
High-Efficiency Aluminum Roll Bond Evaporator Plates for Refrigerator Cooling Systems
US$3.50-10.00
300 Pieces
Sample price:US$0.00/piece.Request sample

Product profile

Customization

Available

Material

Aluminum Sheet, Copper

Usage

Home Refrigerator & Freezer

Parts

Evaporator

Transport Package

Strong Carton/ Wooden Box

Specification

All sizes are available

Trademark

CHENBO

Origin

China

HS Code

84189910

Production Capacity

500000

Key features

Customizable Production: Able to produce according to client drawings, samples, and design different models.
Corrosion Protection: Surface treated with powder painting to prevent corrosion effectively.
Superior Coating Adhesion: Coating adhesion meets Level 2 standard ensuring long-term stability.
Cooling System Compatibility: Inner cleanness meets requirements for R134A & CFC cooling systems.
Diverse Product Types: Available as double side, single side, and part single side roll bond evaporators.
Precise Thickness Control: Finished product thickness ranges from 1.2mm to 2.0mm.

Company profile

HANGZHOU CHENBO ELECTRICS CO., LTD.
High Repeat Buyers ChoiceYears of Export ExperiencePatents AwardedExhibition Experience
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2010-02-01Nearest Port: NINGBOAverage Response Time: >24hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, EXW, CIF

AI-Powered supplier vetting

SummaryThe supplier is a limited company and factory in Yuhang District, Hangzhou, with 48 employees and a stated product scope including Roll Bond Evaporators. It reports in-stock capability, export sales of 71%–90%, participation in an HVACR trade show, and one R&D patent. Production and customization resources include multiple cutting, rolling, welding, coating, and testing machines, with customization available from samples, designs, or full requirements. However, the supplier reports no valid manufacturing-capacity contract with its factory or related subcontractors, no overseas warehouse, no overseas agents or branches, and no overseas showroom. R&D audit documentation and formal quality assurance are absent, while several sustainability and compliance records have unknown status. Service procedures and records are incomplete, so operational capability is mixed and documentation-based assurance remains limited.
Supplier typeThe supplier is identified as a factory in Yuhang District, Hangzhou, operating as a limited company with 48 employees. Its stated product scope includes Roll Bond Evaporators, and it is not indicated as part of a larger company group.
R&D capabilityThe supplier has R&D engineers responsible for developing products to customer requirements, uses CAD and Solidworks, and reports one patent. Nevertheless, it explicitly has no available SDK and no R&D design-input, output, review, verification, or validation documents for audit, so innovation capability is evidenced but not comprehensively documented.
Production capacityThe supplier lists extensive production and testing equipment, including rolling, cutting, welding, coating, air-leak testing, and punching machinery, and reports one-month average lead times in both peak and off-season periods. However, it has no valid contract covering manufacturing capacity with its factory or related subcontractors, creating a documented capacity-governance weakness.
Customization capabilityCustomization is explicitly available from samples, customer designs, and through full customization. R&D engineers develop products according to customer requirements and use CAD and Solidworks, supporting the supplier's stated customization capability.

Product Q&A

Q:Can you produce evaporators based on my specific design?
A:
Yes, we can produce according to drawings or samples supplied by clients and help design different models.
Q:What is the maximum size of the evaporator plates?
A:
The maximum size is 900mm in width and 2000mm in length.
Q:How is the surface treated to prevent corrosion?
A:
The surface is treated with powder painting to prevent corrosion.
Q:What are the lead times for production?
A:
Peak season lead time is 1-3 months, while off-season lead time is one month.
Q:Which cooling systems are compatible with this product?
A:
The inner cleanness meets the requirements of R134A & CFC cooling systems.

Send Inquiry

*To:HANGZHOU CHENBO ELECTRICS CO., LTD.HANGZHOU CHENBO ELECTRICS CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like