Powered by Made-in-China.com
Building Material Formwork Parts Casted Panel Clamp Locking Wedge Spring Clamp for Scaffolding
US$2.90-3.50
10,000 Pieces
Product profile
Customization
AvailableMaterial
Ductile Cast IronType
Wall FormworkSurface
GalvanizedWeight
2850gColor
SilverAfter-sales Service
on-Line Technical SupportTransport Package
PalletOrigin
Hebei, ChinaHS Code
7329199000Production Capacity
100000 PCS/MonthKey features
Ductile Cast Iron Material: Constructed from high-strength ductile cast iron for durability.
Galvanized Surface Finish: Provides excellent corrosion resistance and longevity.
OEM and ODM Services: Full customization available from samples, designs, or minor adjustments.
ISO 9001 Certified: Manufactured under strict quality management standards.
100% Product Inspection: Every item undergoes visual and functional inspection before shipping.
Online Technical Support: Dedicated after-sales service available for customer assistance.
Fast Lead Time: Production completed within 15 workdays regardless of season.
Global Export Experience: 21 years of exporting to North America, Europe, and Asia.
Company profile
CertifiedBusiness Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 21 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤7.65h
About Our Factory & Business Background
AddressShijiazhuang, Hebei, China
Plant Area32000 square meters
Number of Employees105
Registered Capital12,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Ton
Supply Chain Partners5
Our Production Capability & Technical Expertise
Main ProductsWedge Bolt; Wall Ties; Standard Pin; D Cone; Tie Nut
Production Lines10
Production MachinesCold Heading Machine, Punching Machine, Lathing Machine, Drilling Machine, Grinding Machine, Heat Treatment Machine, Machining Center, Sawing Machine, Cutting Machine, Shearing Machine, Bending Machine
QA/QC inspectors3 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers4 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2002-04-18
Main MarketsNorth America, Southeast Asia/ Mideast, East Asia(Japan/ South Korea)
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff9
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What material is the clamp made of?
A:
The clamp is made of ductile cast iron.
Q:Is the product customizable?
A:
Yes, we offer full customization, minor customization, and flexible customization from samples or designs.
Q:What is the surface treatment?
A:
The surface is galvanized to ensure durability.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 Ton.
Q:How long is the lead time?
A:
The average lead time is within 15 workdays for both peak and off-peak seasons.
Send Inquiry
*To:
Shijiazhuang Hanpiao Metal Work Co., Ltd.
Shijiazhuang Hanpiao Metal Work Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Factory Wholesale Construction Aluminum Hardware Scaffolding Building Materials Fixed Connector Parts
US$2.70-9.99
1,000 Pieces(MOQ)
Heavy Duty Scaffolding System Scaffold Parts for Industrial Construction Building
US$1.00-3.00
1,000 Pieces(MOQ)
Professional Casting Factory Aluminium Scaffolding Foldable T Joint for Construstion Parts
US$2.80-9.99
1,000 Pieces(MOQ)
Professional Grade Scaffolding System Scaffolding Parts for Safe and Flexible Use in Construction Building
US$1.00-3.00
1,000 Pieces(MOQ)
Made in China Heavy Duty Scaffolding System Scaffolding Parts for Global Export and Building Construction Use
US$1.00-3.00
1,000 Pieces(MOQ)
Corrosion-Resistant Firm Safe Scaffolding Parts for Building Scaffold Erection
US$592.00-600.00
1 Ton(MOQ)
Customized Easy to Install Practical Firm Scaffolding Parts for Building Scaffold Erection
US$592.00-600.00
1 Ton(MOQ)
Durable Steel Scaffolding System Scaffolding Parts for Reliable Support in Building Maintenance and Repair Works
US$1.00-3.00
1,000 Pieces(MOQ)
Gll Factory Supply High Quality Scaffolding Parts for Scaffolding System
US$3.50-9.90
500 Pieces(MOQ)
Versatile Scaffolding Material Parts for Durable Construction Needs
US$592.00-600.00
1 Ton(MOQ)
High Quality Factory Supply Scaffolding for Construction Scaffolding Couplers Parts
US$0.90-9.90
500 Pieces(MOQ)
Reliable Gi Steel Scaffolding Parts for Enhanced Construction Stability
US$5.00
100 Pieces(MOQ)
Oudai OEM Ring Lock Scaffolding Ledger End Wedge Pin Connection Parts
US$0.60-1.20
1,000 kg(MOQ)
Heavy Duty Hot DIP Galvanized Ringlock Scaffolding Parts for Construction
US$500.00-660.00
50 Tons(MOQ)
Adjustable Height Gi Steel Scaffolding Parts for Construction Projects
US$5.00
100 Pieces(MOQ)



















