SourcingAI
Try for free
Powered by Made-in-China.com
Peri Doka Clamp/Formwork Bfd Panel Clamp/Pressed Wedge Clamp Panel Clamp for Beam
US$7.80-8.50
10,000 Pieces
Sample price:US$0.01/piece.Request sample

Product profile

Customization

Available

After-sales Service

on-Line Technical Support

Material

Ductile Cast Iron

Type

Wall Formwork

Surface

Galvanized

Weight

4330g

Color

Golden

Transport Package

Pallet

Origin

Hebei, China

HS Code

7329199000

Production Capacity

100000 PCS/Month

Key features

Galvanized Surface Treatment: Surface is galvanized for enhanced corrosion resistance and durability.
Ductile Cast Iron Material: Constructed from high-strength ductile cast iron for superior load bearing.
Full Customization Available: Supports full customization, minor customization, and flexible options.
ISO9001 Certified Quality: Company passed ISO9001 recognition with 100% finished product inspection.
15-Day Lead Time: Fast production with peak and off-season lead times within 15 workdays.
OEM/ODM Services: Professional OEM and ODM services available with 4 R&D engineers.
Online Technical Support: Provides on-line technical support for after-sales service and assistance.
Global Export Experience: 21 years of export experience to America, Europe, Japan, and Middle East.

Company profile

Shijiazhuang Hanpiao Metal Work Co., Ltd.
Experienced TeamCustomization from DesignsFull Customization
CertifiedBusiness Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 21 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤3.97h

About Our Factory & Business Background

AddressShijiazhuang, Hebei, China
Plant Area32000 square meters
Number of Employees105
Registered Capital12,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Ton
Supply Chain Partners5

Our Production Capability & Technical Expertise

Main ProductsWedge Bolt; Wall Ties; Standard Pin; D Cone; Tie Nut
Production Lines10
Production MachinesCold Heading Machine, Punching Machine, Lathing Machine, Drilling Machine, Grinding Machine, Heat Treatment Machine, Machining Center, Sawing Machine, Cutting Machine, Shearing Machine, Bending Machine
QA/QC inspectors3 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers4 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2002-04-18
Main MarketsNorth America, Southeast Asia/ Mideast, East Asia(Japan/ South Korea)
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff9
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What is the material of the BFD clamp?
A:
The BFD clamp is made of ductile cast iron, ensuring high strength and durability.
Q:Is the surface of the clamp customizable?
A:
Yes, the surface can be customized, with galvanized being a standard option.
Q:What customization options are available?
A:
We offer full customization, minor customization, flexible customization, and customization from samples or designs.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 Ton.
Q:What is the lead time for production?
A:
The average lead time is within 15 workdays for both peak and off-season periods.

Send Inquiry

*To:Shijiazhuang Hanpiao Metal Work Co., Ltd.Shijiazhuang Hanpiao Metal Work Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Pressed Panel Clamp Peri Bfd Lock for Formwork
Made-in-China.com