Powered by Made-in-China.com
Scaffold Single Clamp Coupler Forged Swivel Clamp Scaffolding Pressed
US$0.60-1.00
10,000 Pieces
Sample price:US$0.01/piece.Request sample
Product profile
Customization
AvailableConnection Type
Clamp ConnectionFinish
GalvanizedModel NO.
allMaterial
SteelType
Wall FormworkSurface
GalvanizedColor
SilverSize
48mm SingleFactory
ManufacturerShape
Swivel or FixedAfter-sales Service
on-Line Technical SupportWarranty
1 YearTransport Package
PalletSpecification
allTrademark
hanpiaoOrigin
Hebei, ChinaHS Code
730840Production Capacity
100000 PCS/MonthKey features
OEM/ODM Customization: Supports full customization from samples, designs, or minor adjustments.
ISO9001 Certified: Manufacturer with ISO9001 recognition and 100% finished product inspection.
Galvanized Steel Material: Made from Q235 Steel with galvanized finish for durability and corrosion resistance.
Global Export Experience: 21 years of export experience to North America, Europe, Japan, and Middle East.
Fast Lead Time: Consistent lead time within 15 workdays for both peak and off-season orders.
Professional Manufacturer: Established in 2002 with 105 employees and 10 production lines.
Swivel or Fixed Shape: Available in swivel or fixed shapes to suit various scaffolding needs.
Flexible Payment Terms: Accepts LC, T/T, D/P, PayPal, Western Union, and small-amount payments.
Company profile
CertifiedBusiness Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 21 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤7.58h
About Our Factory & Business Background
AddressShijiazhuang, Hebei, China
Plant Area32000 square meters
Number of Employees105
Registered Capital12,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Ton
Supply Chain Partners5
Our Production Capability & Technical Expertise
Main ProductsWedge Bolt; Wall Ties; Standard Pin; D Cone; Tie Nut
Production Lines10
Production MachinesCold Heading Machine, Punching Machine, Lathing Machine, Drilling Machine, Grinding Machine, Heat Treatment Machine, Machining Center, Sawing Machine, Cutting Machine, Shearing Machine, Bending Machine
QA/QC inspectors3 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers4 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2002-04-18
Main MarketsNorth America, Southeast Asia/ Mideast, East Asia(Japan/ South Korea)
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff9
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the material and finish of the clamp?
A:
The clamp is made of Q235 Steel with a galvanized finish and silver color.
Q:Can I customize the product?
A:
Yes, we offer OEM and ODM services including full customization from samples or designs.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 Ton.
Q:How long is the production lead time?
A:
The average lead time is within 15 workdays, regardless of peak or off-season.
Q:What payment methods do you accept?
A:
We accept LC, T/T, D/P, PayPal, Western Union, and small-amount payments.
Send Inquiry
*To:
Shijiazhuang Hanpiao Metal Work Co., Ltd.
Shijiazhuang Hanpiao Metal Work Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Tie Bar Tie Rod for Formwork System Construction Scaffolding Accessory
US$0.50-3.00
500 Pieces(MOQ)
All Sizes Available Hot Selling Galvanized Perforated Sheet Board Scaffolding Steel Plank China Supplier
US$13.00-20.00
100 Pieces(MOQ)
Precision Shoring Props for Construction Scaffolding Prop Scaffolding Detachable
US$5.00-12.00
1,000 Pieces(MOQ)
Building Materials Formwork Parts Rasto Clamp for Scaffolding
US$5.40-5.60
1,000 Pieces(MOQ)
Heavy-Duty Threaded Scaffolding Parts for Maximum Load Capacity
US$2.50
200 Pieces(MOQ)
Heavy Duty Q235 Steel H Frame Ladder Scaffolding System for Building Construction
US$6.99-7.99
500 Pieces(MOQ)
Durable Galvanized Steel U-Head Jack for Ringlock Scaffolding
US$5.00-10.00
1,000 Pieces(MOQ)
Durable Steel Prop Scaffolding with Customizable Colors for Versatile Use
US$6.00-12.00
500 Pieces(MOQ)
High Quality OEM Building Construction Tools Adjustable Scaffolding Props Anti-Rust Galvanized
US$4.00-10.00
1,000 Pieces(MOQ)
Mason Frame Scaffolding H Frame V Lock American Scaffold
US$13.09-21.99
500 Pieces(MOQ)
Rust-Proof High-Capacity Ringlock Ledger for Building Scaffolding
US$5.00-25.00
1,000 Pieces(MOQ)
Heavy-Duty Q235 Steel Cuplock Scaffolding for Global Use
US$830.00-850.00
5 Tons(MOQ)
Q235 Galvanized Steel Scaffolding Folding Tripod for Adjustbale Shoring Props Construction
US$9.35-10.89
500 Pieces(MOQ)



















