Powered by Made-in-China.com

Heavy Duty Steel Ladle Transfer Trolley with Quick Change Adapter
US$80,000.00-500,000.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
One-Year Remote WarrantyWarranty
1 YearModel NO.
Ladle Transfer CarControl Type
PLCCustomized
CustomizedCondition
NewAutomatic Grade
AutomaticCertification
ISO9001Type
Sand CastingTransport Package
Standard Packaging or CustomizedSpecification
Standard Specifications or CustomizedTrademark
HANIOrigin
Shaanxi, ChinaKey features
Customized Design: Fully customizable according to specific client requirements and project needs.
High-Strength Materials: Constructed with Q245R steel plates and 40Cr forged trunnions for durability.
ISO9001 Certified: Manufacturing process certified under ISO9001 standards for quality assurance.
PLC Automatic Control: Equipped with advanced PLC control systems for fully automatic operation.
1-Year Warranty: Comprehensive one-year remote warranty coverage for peace of mind.
Heavy Duty Capacity: Designed for 120-ton capacity with 10-35kv voltage for industrial use.
Professional Engineering: Supported by 20+ senior engineers for design, installation, and support.
Global Service Network: Overseas branches ensure rapid local response and lifecycle services.
Company profile
Business Type: Manufacturer/Factory CertifiedExport Year: 10 years CertifiedNearest Port: Tianjin Port, Qingdao PortAverage Response Time: ≤18h CertifiedTerms of Payment: D/P, LC, T/T, etc. CertifiedInternational Commercial Terms(Incoterms): FOB, CIF
About Our Factory & Business Background
AddressCasa Building Xi'an, Shaanxi, China
Average Lead TimePeak Season Lead Time: 6-12 months Off Season Lead Time: 6-12 months
Minimum Order Quantity1 set
Supply Chain Partners10
Our Production Capability & Technical Expertise
Main ProductsSteel Rolling Mill, Electric Arc Furnace, Surmerged Arc Furnace, VOD
Our Industry Experience & Global Business Record
Main MarketsEurope, Africa, Indonesia
Annual Export Revenue31,440,000 RMB
Number of Foreign Trading Staff7
Overseas Agent/BranchNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Product Q&A
Q:Are you a trading company or manufacturer?
A:
We are manufacturer.
Q:How long is your delivery time?
A:
Generally it is 60 days, it is according to quantity requires.
Q:What is the term of payment?
A:
Payment <=1000USD,100%in advance. Payment>=1000USD,30% T/T in advance, balance before shipment.
Q:What is the minimum order quantity?
A:
1 set.
Q:What certifications does the product have?
A:
ISO9001.
Send Inquiry
*To:
Xi'an Hani Tech Co. Ltd
Xi'an Hani Tech Co. Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy Duty Steel Ladle Transport Vehicle with All-Wheel Drive
US$80,000.00-500,000.00
1 Piece(MOQ)
Heavy Load Steel Ladle Handling Trolley with Laser Guidance System
US$80,000.00-500,000.00
1 Piece(MOQ)
Heavy Duty Steel Ladle Carrier with VFD Motor Control
US$80,000.00-500,000.00
1 Piece(MOQ)
High Precision Steel Ladle Trolley with Weighing Scale Integration
US$80,000.00-500,000.00
1 Piece(MOQ)
Good Price Foundry Ladle with Nozzle for Pouring in Metallurgy
US$300.00-2,000.00
1 Piece(MOQ)
Foundry Steel Pouring Ladle/ Molten Iron Transfer Ladle for Casting
US$1,500.00
1 Piece(MOQ)
Chinese Foundry Pouring Iron and Steel Casting Ladle
US$500.00-2,000.00
1 Piece(MOQ)
Big Spheroidizing Ladle with Template for Producing Ductile Ion
US$3,000.00-12,000.00
1 Piece(MOQ)
High-Capacity Automated Molten Iron Transfer Ladle
US$1,000.00-2,000.00
1 Piece(MOQ)
3000kg Ladle Capacity Heavy Duty Automatic Caster
US$150,000.00-300,000.00
1 Set(MOQ)
0.3-30 Tons Liquid Steel Pouring Ladle/Cast Iron Ladle/Pouring Ladle for Foundry
US$1,500.00
1 Piece(MOQ)
Casting Ladles with Cover for Insulation
US$3,000.00-12,000.00
1 Piece(MOQ)
Foundry Pouring Steel Ladle Furnace Casting Ladle Iron Pouring Ladle for Melting Furnace
US$1,500.00
1 Piece(MOQ)
China Professional Designed Spherodizing Ladle with Templet
US$3,000.00-12,000.00
1 Piece(MOQ)
Efficient Automatic Iron Casting Ladle with Thermal Insulation
US$1,000.00-2,000.00
1 Piece(MOQ)
High Precision Ladle Pouring Station with Doser, Pouring, Foundry Plant
US$150,000.00-300,000.00
1 Set(MOQ)
1t 10t 20t Metal Stainless Steel Foundry Iron Ladle for Casting Pouring
US$1,500.00
1 Piece(MOQ)
Supply Steel/Worm/ Copper Turbine / Factory Direct Sales Iron /Steel/ Boiling Ladle
US$700.00-2,500.00
1 Piece(MOQ)
Aluminum Liquid Transport Ladle Package
US$48,000.00
1 Piece(MOQ)



















