Powered by Made-in-China.com
2500kVA High Overload Oil Immersed Transformer for Data Center Station
US$6,300.00-11,500.00
1 Set
Product specifications
Specification
Product profile
Customization
AvailableApplication
PowerPhase
ThreeModel NO.
S11Core
Core-type TransformerCooling Method
Oil-immersed Type TransformerWinding Type
Two-winding TransformerCertification
ISO9001Usage
Distribution TransformerFrequency Characteristics
50/60HzShape of Core
Core-Type Laminated Silicon SheetBrand
HonconProduct Name
Oil-Immersed TransformerKeywords
Oil-Type TransformerWinding Connection Mode
Yyn0 or Dyn11Warranty Period
12 MonthsMOQ
1 SetTransport Package
Export Plywood PackagingSpecification
CustomizedTrademark
HONCONOrigin
Guangdong, ChinaHS Code
8504220000Production Capacity
50000 Pieces/YearKey features
Sealed Tank Structure: Prevents contact with air and water, reducing oil aging and extending service life.
Long Service Life: Sealed design ensures over 20 years of service under normal operating conditions.
Safety Pressure Release: Equipped with pressure relief valves to safely release high internal pressure during failures.
Excellent Cooling: Transformer oil acts as an efficient medium to reduce winding and core temperature rise.
High Insulation Reliability: Oil and solid insulation combination significantly improves overall dielectric strength.
Low Operating Noise: Optimized structural design minimizes core vibration and reduces noise levels.
Wide Capacity Range: Suitable for projects ranging from tens of kVA to hundreds of MVA.
ISO9001 Certified: Manufacturing process and quality control comply with ISO9001 standards.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc.Average Response Time: ≤1.05h CertifiedTerms of Payment: LC, T/T CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, CFR, EXW
About Our Factory & Business Background
AddressFoshan, Guangdong, China
Registered Capital100,000,000 RMB
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners500
Our Production Capability & Technical Expertise
Main ProductsTransformer, Prefabricated Substation, Switchgear
Production MachinesABB Mechanical Hand, Bending Machine, Busbar Arc Processing Center, Busbar Processing Machine, CNC Automatic Heat Shrink Forming Machine, CNC Punch Press, Constant Temperature Drying Oven, Copper Strip Processing Line, Curing Oven, Cutting Machine, Epoxy Casting Tank, Foil-type Coil Winding Machine, Laser Cutting Machine, Shearing Machine, Winding Machine, Discharge Tester, Fully Automatic Transformer Comprehensive Performance Testing Platform, Helium Mass Spectrometry Leak Detector, Lightning Impact Testing Machine, Test Transformer
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers15 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Main MarketsSoutheast Asia/ Mideast, Africa
Repeat Buyers Choice50%~80%
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Product CertificationOthers
Product Q&A
Q:Is OEM/ODM available?
A:
Yes, it is! Our products can be customized. We have skilled and experienced engineering teams, and we can customize products according to customers' drawings or requirements.
Q:What's your MOQ?
A:
One Set.
Q:How is the delivery time?
A:
It depends on your order quantity, and it normally takes about 15-20 days.
Q:How do you control the quality?
A:
We have the QC team comply with TQM to ensure the quality. Each step complies with the standards. At the same time, we will take photos and shoot a video for you if you need. Every product will be fully assembled and carefully tested before packing and shipping.
Q:How long is the warranty?
A:
Within one year from the sale date.
Send Inquiry
*To:
Guang Dong Hao Cheng Electric Co., Ltd
Guang Dong Hao Cheng Electric Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
33kv High Voltage Fully Sealed Copper Core Oil Immersed Power Step Down Distribution Electric Transformer for Substation
US$2,000.00-20,000.00
1 Piece(MOQ)
Three Phase Step Down Oil Immersed Power Transformer for EV Charging Station
US$2,000.00-8,000.00
1 Piece(MOQ)
High Voltage 11kv Oil Immersed Transformer for 630kVA Power Solutions
US$2,000.00-20,000.00
1 Piece(MOQ)
S13-M 2500kVA 10/0.4kv Data Center Use Oil-Immersed Electric Transformer
US$1,600.00-11,000.00
1 Piece(MOQ)
Efficient 10kVA-2500kVA/10kv Fully Sealed Oil Immersed Distribution Transformer for Power Supply
US$1.00-100,000.00
1 Piece(MOQ)
Stock Available Explosion-Proof High Voltage Oil-Immersed Transformer for Paper Mill
US$2,000.00-10,000.00
1 Piece(MOQ)
Low Loss Outstanding Overload Capacity Safe Operation Dry Transformer for Data Center
US$3,655.00-5,848.00
1 Piece(MOQ)
High Capacity 10kv Oil Immersed Transformer for Irrigation
US$1,299.00-1,999.00
1 Piece(MOQ)
High-Efficiency 500kVA Oil Immersed Transformer for Data Centers
US$3,100.00-5,499.00
1 Piece(MOQ)
High-Efficiency 10kv 30kVA Oil Immersed Transformer for Distribution
US$500.00-510.00
1 Piece(MOQ)
High Stability Oil Immersed Transformer Suitable for Wind Power Generation Project
US$1,000.00-50,000.00
1 Piece(MOQ)
Premium Quality Oil-Immersed Transformer for Exhibition Center Power Distribution
US$3,000.00-45,000.00
1 Piece(MOQ)
High-Efficiency 2500kVA Oil-Immersed Power Transformer for Industrial Use
US$1,288.00-12,988.00
1 Set(MOQ)
Custom OEM ODM Data Center 1600kVA Oil Immersed Distribution Transformer
US$550.00-1,200.00
1 Box(MOQ)



















