Powered by Made-in-China.com
Convenient Maintenance AC Power Distribution Cabinet for Airport Terminals
US$3,800.00-10,000.00
1 Set
Product specifications
Specification
Product profile
Customization
AvailableCertification
ISO9001Shell Material
Steel PlateModel NO.
HCMVoltage Level
Medium VoltageInstallation
FixedStructure
FloorstandingCurrent
ACProduct Name
Gas-Insulated Ring Main UnitKeywords
Ring Main UnitRated Voltage(Kv)
12, 24Rated Current (a)
630,1250Rated Frequency(Hz)
50/60IP Class-Shell
IP4XIP Class-Gas Chamber
IP67Warranty Period
12 MonthsMOQ
1 SetTransport Package
Export Plywood PackingSpecification
Standard Specifications or CustomizedTrademark
HONCONOrigin
Guangdong, ChinaHS Code
8537209000Production Capacity
50000 Pieces/YearKey features
SF6 Fully Enclosed Design: Fully insulated and sealed with SF6 gas for safety and reliability in any environment.
IP67 Gas Chamber Rating: High protection rating ensures durability and safety in harsh outdoor or indoor conditions.
Modular & Expandable: Flexible combination allows easy expansion to meet specific network node requirements.
High Reliability: Ring network configuration ensures continuous power supply even during single-point failures.
Compact Structure: Reduces floor area, ideal for urban substations and space-constrained environments.
OEM/ODM Customization: Customizable products based on customer drawings or specific requirements.
1-Year Warranty: Comprehensive warranty coverage within one year from the sale date.
ISO9001 Certified: Manufacturing process complies with ISO9001 standards for quality assurance.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc.Average Response Time: ≤1.17h CertifiedTerms of Payment: LC, T/T CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, CFR, EXW
About Our Factory & Business Background
AddressFoshan, Guangdong, China
Registered Capital100,000,000 RMB
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners500
Our Production Capability & Technical Expertise
Main ProductsTransformer, Prefabricated Substation, Switchgear
Production MachinesABB Mechanical Hand, Bending Machine, Busbar Arc Processing Center, Busbar Processing Machine, CNC Automatic Heat Shrink Forming Machine, CNC Punch Press, Constant Temperature Drying Oven, Copper Strip Processing Line, Curing Oven, Cutting Machine, Epoxy Casting Tank, Foil-type Coil Winding Machine, Laser Cutting Machine, Shearing Machine, Winding Machine, Discharge Tester, Fully Automatic Transformer Comprehensive Performance Testing Platform, Helium Mass Spectrometry Leak Detector, Lightning Impact Testing Machine, Test Transformer
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers15 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Main MarketsSoutheast Asia/ Mideast, Africa
Repeat Buyers Choice50%~80%
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Product CertificationOthers
Product Q&A
Q:Is OEM/ODM available?
A:
Yes, it is! Our products can be customized. We have skilled and experienced engineering teams, and we can customize products according to customers' drawings or requirements.
Q:What is the MOQ?
A:
One Set.
Q:What is the delivery time?
A:
It depends on your order quantity, and it normally takes about 15-20 days.
Q:How do you control the quality?
A:
We have the QC team comply with TQM to ensure the quality. Each step complies with the standards. At the same time, we will take photos and shoot a video for you if you need. Every product will be fully assembled and carefully tested before packing and shipping.
Q:How long is the warranty?
A:
Within one year from the sale date.
Send Inquiry
*To:
Guang Dong Hao Cheng Electric Co., Ltd
Guang Dong Hao Cheng Electric Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
IEC Standard OEM ODM Service for Airport Auxiliary Power Distribution Network LV Reactive Power Compensation Cabinet
US$800.00-1,000.00
1 Piece(MOQ)
Cost-Effective Easy Maintenance Power Distribution Cabinet for Commercial Building
US$1,300.00-3,000.00
1 Piece(MOQ)
Direct Supply Easy Maintenance Power Distribution Cabinet for Indoor Installation
US$1,300.00-3,000.00
1 Piece(MOQ)
Factory-Direct Easy Maintenance Power Distribution Cabinet for Industrial Use
US$1,300.00-3,000.00
1 Piece(MOQ)
Full Copper Terminal Distribution Cabinet 380V Power Switchboard for Irrigation Project
US$159.00-229.00
1 Piece(MOQ)
Erzheng Ggd AC Low Voltage Distribution Cabinet for Gymnasium Electrical Power
US$1,000.00-1,500.00
2 Pieces(MOQ)
Three Phase AC Power Cabinet for Solar PV and Ess Projects Distribution Cabinet
US$459.00-899.00
1 Piece(MOQ)
High-Performance Low Voltage AC Switchgear Cabinet for Reliable Power Distribution
US$1,000.00-10,000.00
1 Piece(MOQ)
High Precision Metal-Clad AC Power Distribution Cabinet for Railway Stations
US$5,500.00-10,690.00
1 Set(MOQ)
Withdrawable Power Distribution Cabinet for User-Friendly Maintenance and Operation
US$1,000.00-3,000.00
1 Piece(MOQ)
Durable AC Power Distribution Cabinet for Rural Upgrades
US$3,000.00
1 Set(MOQ)



















