SourcingAI
Try for free
Powered by Made-in-China.com
Kyn28A-12 Armoured Central Metal-Enclosed Switchgear 11kv Medium Voltage Switchgear
US$3,000.00
1 Set

Product profile

Customization

Available

Certification

ISO9001

Shell Material

Steel Plate

Model NO.

KYN28A-12

Voltage Level

Medium Voltage

Installation

Removable

Structure

Cabinet

Current

AC

Earthquake Intensity

Magnitude 8

Rated Voltage

12~40.5kv

Weight

840-1500kg

Storage Conditions

Sheltered From The Sun and Rain

Rated Frequency

50/60Hz

Phase

Three

Protection Level

Enclosure IP4X

OEM

Avaliable

Transport Package

Plywood Case

Specification

W: 600, 800, 1000; D: 1550, 1660; H: 2300

Trademark

HC

Origin

Foshan, Guangdong, China

HS Code

8537209000

Production Capacity

10000

Key features

Customizable Voltage Range: Rated voltage is customizable from 12kV to 40.5kV to meet specific project needs.
Earthquake Resistant Design: Engineered to withstand earthquake intensity up to Magnitude 8 for enhanced safety.
Flexible OEM Service: OEM is available; customize products according to customer drawings or requirements.
High Safety Protection: Features 'five prevention' device, independent pressure release, and reliable earthing switch.
Versatile Current Options: Rated current options range from 630A to 5000A for various load requirements.
Robust Insulation Level: Central circuit breaker trolley prevents bus moisture and improves insulation performance.
Low Maintenance Design: Draw-out type combination unit ensures good interchangeability and minimal maintenance.
Certified Quality Control: ISO9001 certified with 100% inspection and full assembly testing before shipping.

Company profile

Guang Dong Hao Cheng Electric Co., Ltd
Importers and ExportersPatents AwardedManagement CertificationQuality Assurance
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc.Average Response Time: ≤0.76h CertifiedTerms of Payment: LC, T/T CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, CFR, EXW

About Our Factory & Business Background

AddressFoshan, Guangdong, China
Registered Capital100,000,000 RMB
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners500

Our Production Capability & Technical Expertise

Main ProductsTransformer, Prefabricated Substation, Switchgear
Production MachinesABB Mechanical Hand, Bending Machine, Busbar Arc Processing Center, Busbar Processing Machine, CNC Automatic Heat Shrink Forming Machine, CNC Punch Press, Constant Temperature Drying Oven, Copper Strip Processing Line, Curing Oven, Cutting Machine, Epoxy Casting Tank, Foil-type Coil Winding Machine, Laser Cutting Machine, Shearing Machine, Winding Machine, Discharge Tester, Fully Automatic Transformer Comprehensive Performance Testing Platform, Helium Mass Spectrometry Leak Detector, Lightning Impact Testing Machine, Test Transformer
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers15 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Main MarketsSoutheast Asia/ Mideast, Africa
Repeat Buyers Choice50%~80%
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Product CertificationOthers

Product Q&A

Q:Is OEM/ODM available?
A:
Yes, OEM is available. Our skilled engineering teams can customize products according to customer drawings or specific requirements.
Q:What is the MOQ?
A:
The Minimum Order Quantity is one set.
Q:What is the delivery time?
A:
Delivery time depends on order quantity, normally taking about 15-20 days.
Q:How is the quality controlled?
A:
We have a QC team complying with TQM. Each step meets standards, and every product is fully assembled and tested before shipping. Photos and videos can be provided upon request.
Q:How long is the warranty?
A:
The warranty period is within one year from the sale date.

Send Inquiry

*To:Guang Dong Hao Cheng Electric Co., LtdGuang Dong Hao Cheng Electric Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like