Powered by Made-in-China.com
Oil Immersed Distribution Transformer with Overload Protection
US$12,000.00-35,000.00
1 Set
Product specifications
Specification
Product profile
Customization
AvailableApplication
PowerPhase
ThreeCore
Core-type TransformerCooling Method
Oil-immersed Type TransformerWinding Type
Two-winding TransformerCertification
ISO9001Usage
Distribution TransformerFrequency Characteristics
50/60HzShape of Core
Core-Type Laminated Silicon SheetBrand
HonconProduct Name
Oil-Immersed TransformerKeywords
Oil-Type TransformerWinding Connection Mode
Yyn0 or Dyn11Warranty Period
12 MonthsMOQ
1 SetTransport Package
Export Plywood PackagingSpecification
CustomizedTrademark
HONCONOrigin
Guangdong, ChinaHS Code
8504220000Production Capacity
50000 Pieces/YearKey features
Sealed Tank Design: Prevents oil deterioration and ensures a service life of over 20 years under normal conditions.
Excellent Cooling: Transformer oil acts as an efficient cooling medium to reduce winding and core temperature rise.
High Insulation Reliability: Oil and solid insulation combination significantly improves overall dielectric strength.
Low Operating Noise: Optimized structural design reduces core vibration and minimizes operational noise.
Safety Protection: Features pressure release safety devices to prevent accident expansion during high pressure.
Wide Capacity Range: Suitable for projects ranging from tens of kVA to hundreds of MVA.
OEM/ODM Customization: Products can be customized according to customer drawings or specific requirements.
Outdoor Durability: Robust sealed tank structure prevents contact with air and water for outdoor use.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc.Average Response Time: ≤0.76h CertifiedTerms of Payment: LC, T/T CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, CFR, EXW
About Our Factory & Business Background
AddressFoshan, Guangdong, China
Registered Capital100,000,000 RMB
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners500
Our Production Capability & Technical Expertise
Main ProductsTransformer, Prefabricated Substation, Switchgear
Production MachinesABB Mechanical Hand, Bending Machine, Busbar Arc Processing Center, Busbar Processing Machine, CNC Automatic Heat Shrink Forming Machine, CNC Punch Press, Constant Temperature Drying Oven, Copper Strip Processing Line, Curing Oven, Cutting Machine, Epoxy Casting Tank, Foil-type Coil Winding Machine, Laser Cutting Machine, Shearing Machine, Winding Machine, Discharge Tester, Fully Automatic Transformer Comprehensive Performance Testing Platform, Helium Mass Spectrometry Leak Detector, Lightning Impact Testing Machine, Test Transformer
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers15 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Main MarketsSoutheast Asia/ Mideast, Africa
Repeat Buyers Choice50%~80%
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Product CertificationOthers
Product Q&A
Q:Is OEM/ODM available?
A:
Yes, it is! Our products can be customized. We have skilled and experienced engineering teams, and we can customize products according to customers' drawings or requirements.
Q:What is the MOQ?
A:
One Set.
Q:How is the delivery time?
A:
It depends on your order quantity, and it normally takes about 15-20 days.
Q:How do you control the quality?
A:
We have the QC team comply with TQM to ensure the quality. Each step complies with the standards. At the same time, we will take photos and shoot a video for you if you need. Every product will be fully assembled and carefully tested before packing and shipping.
Q:How long is the warranty?
A:
Within one year from the sale date.
Send Inquiry
*To:
Guang Dong Hao Cheng Electric Co., Ltd
Guang Dong Hao Cheng Electric Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Toroidal Transformer with Overload Protection for Industrial Control Panels
US$6.00-15.00
100 Pieces(MOQ)
Oil-Immersed Transformer with Dual Protection for Overvoltage and Overload
US$1,000.00-8,000.00
1 Piece(MOQ)
with Buchholz Relay Safety Protection High Voltage Oil-Immersed Transformer
US$500.00-1,200.00
1 pieces(MOQ)
10kv Oil-Immersed Transformer 100kVA 400kVA 500kVA 35kv/480V/440V/380V with Overload Protection for Safe Operation
US$1,299.00-1,999.00
1 Piece(MOQ)
Overload Protection Oil-Immersed Transformer with Automatic Locking Function
US$1,600.00
1 Piece(MOQ)
High Efficiency Overload Protection S11 Series 160 kVA Oil Immersed Power Transformer
US$1,900.00-2,100.00
1 Set(MOQ)
Aodexin S11 Oil-Immersed Transformer with Overload Protection Device
US$1,000.00-3,000.00
1 Piece(MOQ)
Substation-Grade Oil Immersed Transformer 30-20000kVA with Overload Protection
US$3,000.00
1 Piece(MOQ)
Overload Protection Low Loss S9 50 kVA Electrical Single-Phase Oil Immersed Transformer
US$1,900.00-2,100.00
1 Set(MOQ)
10kv Oil-Immersed Transformer 250kVA 630kVA 800kVA 33kv 34.5kv 35 Kv with Overload Protection for Safe Operation
US$1,299.00-1,999.00
1 Piece(MOQ)
Reliable 950kVA Oil-Immersed Transformer with High Overload Capacity
US$1,200.00-12,000.00
1 Piece(MOQ)
Three Phase Oil Immersed Distribution Transformer with Strong Overload Capacity
US$1,000.00-20,000.00
1 Piece(MOQ)
Deyan Oil-Immersed Transformer with Gas-Driven Overpressure Relay Equipped with Internal Fault Protection Device
US$550.00-1,875.00
1 Piece(MOQ)
Oil Immersed Power Transformer with Enhanced Partial Discharge Protection for Urban Grid Reconstruction Projects
US$1,200.00-22,000.00
1 Piece(MOQ)
Electric Step Down Transformer with Enhanced Overload Protection
US$998.00
1 Piece(MOQ)
Oil Immersed Transformer with Complete Protection
US$550.00-1,200.00
1 Box(MOQ)
Long-Lasting Oil Immersed Transformer with Overvoltage Protection Design
US$999.00-62,000.00
1 Piece(MOQ)
Anti-Lightning Oil-Immersed Transformer Equipped with Complete Lightning Protection
US$1,000.00-8,000.00
1 Piece(MOQ)
400kVA High Overload Oil-Immersed Transformer with Overload Protection and Maintenance-Free Design
US$500.00-8,000.00
1 Piece(MOQ)



















