Powered by Made-in-China.com
on Load Tapping Changer Distribution Transformer
US$32,500.00-56,400.00
1 Set
Product profile
Customization
AvailableApplication
PowerPhase
ThreeModel NO.
S11Core
Core-type TransformerCooling Method
Oil-immersed Type TransformerWinding Type
Two-winding TransformerCertification
ISO9001-2000, ISO9001Usage
Distribution TransformerFrequency Characteristics
Power FrequencyShape of Core
RingBrand
GuangdonghaochengMaterial
Copper / AluminiumTapping Method
on Load / off Load Tapping ChangerStandard
IEC60076 / GB1094Frequency
50/60HzTransformer Type
Oil Filled TransformerConnection Group
Y, Yn0/D, Yn11Color
Gray, Green or CustomizedModel No.
S13Transport Package
Plywood CaseTrademark
HCOrigin
Foshan, Guangdong, ChinaHS Code
8504210000Key features
Extended Service Life: Sealed tank design prevents oil deterioration, ensuring a service life of over 20 years.
Excellent Cooling Performance: Transformer oil acts as an efficient cooling medium, reducing temperature rise of windings and core.
High Insulation Reliability: Combination of oil and solid insulation significantly improves overall dielectric strength.
Safety Protection Devices: Pressure release safety devices and relief valves prevent accident expansion during high pressure.
Low Operating Noise: Optimized structural design reduces core vibration and minimizes operational noise.
Customizable Options: Color, material, and tapping method are customizable to meet specific customer requirements.
Wide Capacity Range: Suitable for projects ranging from tens of kVA to hundreds of MVA with various models.
Robust Outdoor Design: Corrugated tank sealing structure prevents contact with air and water for outdoor use.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc.Average Response Time: ≤0.72h CertifiedTerms of Payment: LC, T/T CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, CFR, EXW
About Our Factory & Business Background
AddressFoshan, Guangdong, China
Registered Capital100,000,000 RMB
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners500
Our Production Capability & Technical Expertise
Main ProductsTransformer, Prefabricated Substation, Switchgear
Production MachinesABB Mechanical Hand, Bending Machine, Busbar Arc Processing Center, Busbar Processing Machine, CNC Automatic Heat Shrink Forming Machine, CNC Punch Press, Constant Temperature Drying Oven, Copper Strip Processing Line, Curing Oven, Cutting Machine, Epoxy Casting Tank, Foil-type Coil Winding Machine, Laser Cutting Machine, Shearing Machine, Winding Machine, Discharge Tester, Fully Automatic Transformer Comprehensive Performance Testing Platform, Helium Mass Spectrometry Leak Detector, Lightning Impact Testing Machine, Test Transformer
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers15 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Main MarketsSoutheast Asia/ Mideast, Africa
Repeat Buyers Choice50%~80%
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Product CertificationOthers
Product Q&A
Q:Is OEM/ODM available?
A:
Yes, it is! Our products can be customized. We have skilled and experienced engineering teams, and we can customize products according to customers' drawings or requirements.
Q:What is the warranty period?
A:
Within one year from the sale date.
Q:What is the MOQ?
A:
One Set.
Q:How is the delivery time?
A:
It depends on your order quantity, and it normally takes about 15-20 days.
Q:How do you control the quality?
A:
We have the QC team comply with TQM to ensure the quality. Each step complies with the standards. At the same time, we will take photos and shoot a video for you if you need. Every product will be fully assembled and carefully tested before packing and shipping.
Send Inquiry
*To:
Guang Dong Hao Cheng Electric Co., Ltd
Guang Dong Hao Cheng Electric Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
20kv 200kVA Oil Cooled Distribution Transformer with on Load Tap Changer Transformer Price
US$1,000.00
1 Piece(MOQ)
on Load and off Load Tapping Changer Transformers
US$4,600.00-14,600.00
1 Set(MOQ)
35kv Oil Transformer with on-Load Tap Changer, 630kVA for Industrial Power Distribution
US$4,500.00
10 Pieces(MOQ)
Efficient 630kVA 20kv Transformer with on-Load Tap Changer For Power Distribution
US$4,000.00-10,000.00
10 Pieces(MOQ)
Xusheng Electric Sz11 1600kVA on Load Tap Changer Oil Immersed Distribution Transformer
US$11,498.00-19,996.00
1 Piece(MOQ)
Ei Aluminum Core Changda Distribution Transformer on Load Tap Changer
US$800.00-15,000.00
1 Piece(MOQ)
30kVA-2500kVA Distribution Power Electric Potential Oil Immersed Transformer on Load Tap Changer
US$2,600.00-12,000.00
1 Piece(MOQ)
Sz22-31500/38.5 31500kVA 38.5kv Oil Immersed on Load Tap Changer Transformer
US$100,000.00-180,000.00
1 UNIT(MOQ)
Sz11-M 1000kVA Fully Sealed on-Load Tap Changer Oil Immersed Distribution Transformer
US$9,200.00-11,400.00
1 Piece(MOQ)
on Load Tap Changer Optional SL-400 Oil Immersed Distribution Transformer 10/0.4kv Outdoor Mounted
US$1,940.00-2,025.00
1 Piece(MOQ)
30kVA-2500kVA Oil-Immersed Type Distribution Transformer on Load Tap Changer
US$2,600.00-12,000.00
1 Piece(MOQ)
1000kVA Pad-Mounted Oil-Immersed Transformer with on-Load Tap Changer for Urban Distribution Networks
US$500.00-8,000.00
1 Piece(MOQ)
11kv Oil Filled Distribution Transformer Mining on Load Tap Changer
US$800.00-15,000.00
1 Piece(MOQ)
Factory Price 630kVA Electrical Power Distribution Transformer with on Load Tap Changer
US$825.00-3,092.00
1 Set(MOQ)
Oil Cooled Distribution Transformer Oil Changer with on Load Tap Changer
US$100.00-1,000.00
10 Pieces(MOQ)
250kVA on Load Tap Changer Three Phase Pad Mounted Distribution Transformer
US$50,000.00-300,000.00
1 Piece(MOQ)



















