Powered by Made-in-China.com
Three-Phase Oil-Immersed 630kVA Power Transformer 10kv All Copper Step Down Power Distribution Transformer
US$2,500.00-14,000.00
1 Piece
Product profile
Customization
AvailableApplication
PowerPhase
ThreeModel NO.
S13Core
Core-type TransformerCooling Method
Oil-immersed Type TransformerWinding Type
Two-winding TransformerCertification
ISO9001-2000, ISO9001, CCCUsage
Distribution TransformerFrequency Characteristics
Power FrequencyShape of Core
Core-Type Laminated Silicon SheetBrand
HonconMaterial
Copper / AluminiumTapping Method
on Load / off Load Tapping ChangerStandard
IEC60076 / GB1094Frequency
50/60HzTransformer Type
Oil Filled TransformerConnection Group
Y, Yn0/D, Yn11Color
Gray, Green or CustomizedModel No.
S13Transport Package
Export Plywood PackagingSpecification
CustomizedTrademark
HONCONOrigin
Guangdong, ChinaHS Code
8504210000Production Capacity
50000 Pieces/YearKey features
Sealed Tank Design: Prevents oil deterioration and extends service life over 20 years.
Excellent Cooling Performance: Transformer oil effectively reduces temperature rise of windings and core.
High Insulation Reliability: Oil and solid insulation combination improves dielectric strength.
Low Operating Noise: Optimized structural design minimizes core vibration and noise.
Outdoor Application: Robust design suitable for outdoor, pole-mounted, and diverse environments.
Safety Pressure Release: Equipped with pressure relief valves to safely release high internal pressure.
Wide Capacity Range: Available from tens of kVA to hundreds of MVA for various projects.
ISO9001 Certified: Manufacturing process and quality control comply with international standards.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc.Average Response Time: ≤1.05h CertifiedTerms of Payment: LC, T/T CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, CFR, EXW
About Our Factory & Business Background
AddressFoshan, Guangdong, China
Registered Capital100,000,000 RMB
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners500
Our Production Capability & Technical Expertise
Main ProductsTransformer, Prefabricated Substation, Switchgear
Production MachinesABB Mechanical Hand, Bending Machine, Busbar Arc Processing Center, Busbar Processing Machine, CNC Automatic Heat Shrink Forming Machine, CNC Punch Press, Constant Temperature Drying Oven, Copper Strip Processing Line, Curing Oven, Cutting Machine, Epoxy Casting Tank, Foil-type Coil Winding Machine, Laser Cutting Machine, Shearing Machine, Winding Machine, Discharge Tester, Fully Automatic Transformer Comprehensive Performance Testing Platform, Helium Mass Spectrometry Leak Detector, Lightning Impact Testing Machine, Test Transformer
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers15 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Main MarketsSoutheast Asia/ Mideast, Africa
Repeat Buyers Choice50%~80%
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Product CertificationOthers
Product Q&A
Q:Is OEM/ODM available?
A:
Yes, it is! Our products can be customized. We have skilled and experienced engineering teams, and we can customize products according to customers' drawings or requirements.
Q:What's your MOQ?
A:
One Set.
Q:How is the delivery time?
A:
It depends on your order quantity, and it normally takes about 15-20 days.
Q:How do you control the quality?
A:
We have the QC team comply with TQM to ensure the quality. Each step complies with the standards. At the same time, we will take photos and shoot a video for you if you need. Every product will be fully assembled and carefully tested before packing and shipping.
Q:How long is the warranty?
A:
Within one year from the sale date.
Send Inquiry
*To:
Guang Dong Hao Cheng Electric Co., Ltd
Guang Dong Hao Cheng Electric Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Industrial Electricity 220kv 6.3kv 10mva 20mva 30mva Oil-Immersed 3 Phase Power Transformers
US$10,000.00-500,000.00
10 Pieces(MOQ)
Manufacturer 250 kVA 11 / 0.4 Kv Oil Immersed Power Transformer S11
US$2,458.00-2,558.00
1 Set(MOQ)
Manufacturer Custom Transformer 250kVA 400kVA 125kVA Price Three Phase Oil Immersed Power Transformer
US$8,000.00-9,050.00
1 pieces(MOQ)
75kVA Single-Phase Pole-Mounted Cylindrical Distribution Transformer, Oil Immersed
US$600.00-3,000.00
5 Pieces(MOQ)
Three-Phase Oil-Immersed Power Transformer 50Hz with Reliable Performance and Copper Winding
US$1,581.00-3,265.00
1 Set(MOQ)
1250kVA Transformer S11 Oil Immersed Transformer 10kv30Hz Three Phase Transformer Manufacturer
US$1,050.00-18,700.00
1 Piece(MOQ)
100kVA 200kVA 315kVA Copper Winding Oil Electric Transformer with LV 220V 380V
US$3,200.00-4,800.00
1 Set(MOQ)
Three Phase Electric Voltage Power Transformer, Cast Resin Dry Type Fully Sealed Industrial Control Furnace Power Supply Transformer
US$1,450.00-73,000.00
1 Piece(MOQ)


















