CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 4 Years CertifiedNearest Port: Shenzhen PortAverage Response Time: ≤0.60h
About Our Factory & Business Background
AddressHaomai Building No. 1, Wuhan University Science Park Road, East-Lake Hi-Tech Development District, Wuhan, Hubei, China
Plant Area6712 square meters
Number of Employees149
Registered Capital110,000,000 RMB
Terms of PaymentT/T
International Commercial Terms(Incoterms)CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Set
Supply Chain Partners3000
Our Production Capability & Technical Expertise
Main ProductsCT PT Analyzer, Relay Protection Test System, Substation DC System Tester, Battery Test System
Production Lines3
Production MachinesAssembling Lines, Debugging Lines, Aging Testing Lines
QA/QC inspectors8 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers35 people
Traceability of Raw MaterialsYes
Test Reports for Raw MaterialsOthers
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment1999-07-27
Main MarketsSoutheast Asia/ Mideast, Domestic
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO14001, ISO45001:2018
Product Q&A
Q:What is the maximum output current and voltage?
A:
The system can output 6-phase current up to 40A and 6-phase voltage up to 150V, with a single phase capable of 240A and 1000VA.
Q:Can the tester operate without a PC?
A:
Yes, it features an embedded industrial PC with a 10.4-inch color TFT LCD screen, built-in mouse, and keyboard for local operation.
Q:Is synchronization between substations possible?
A:
Yes, the in-built GPS allows the system to synchronize and perform end-to-end testing with test sets in different substations.
Q:What is the warranty period for this equipment?
A:
The product comes with a 3-year warranty covering mechanical defects and providing free parts and labor.
Q:Are customization options available?
A:
Yes, we offer full customization, minor customization, and options based on samples or designs.
Send Inquiry
*To:Haomai Electric Power Automation Co., Ltd.
*Content:
0/4000
Supplier replies will be sent to your registered email