SourcingAI
Try for free
Powered by Made-in-China.com
Advanced Three Phase Relay Tester Kit for Precision Testing
US$2,600.00-2,800.00
1 Piece

Product profile

Customization

Available

After-sales Service

on-Site Training

Warranty

3 Years

Model NO.

HME-702

Current Output Range

0-40A

AC Voltage Output Range

0-120V

Output Precision

0.5 Degree

1 Phase Max Output

0-120A

Max Current Output

10A

Frequency Range

10-1000Hz

Harmonic Time

2-20

DC Current Output

-10A - +10A

Phase Voltage Output

0-120V

Max Voltage Output

240V

DC Voltage Output

-160V - +160V

Binary Input

10

Binary Output

8

Binary Input Isolation

0.1ms

Transport Package

Standard Export Wooden Package

Specification

400*300*180mm

Trademark

HME-702

Origin

Hubei China

HS Code

9030390000

Production Capacity

100px/Week

Key features

Multi-Phase Output Capability: 3-phase current up to 40A and 4-phase voltage up to 120V, supporting complex relay protection tests.
Comprehensive Test Functions: Supports harmonic superposition, impedance, differential, and synchronization tests for all relay types.
Cost-Effective & Reliable: Over 5,000 units sold since 1999 with low maintenance costs and high reliability in global markets.
Flexible Customization: Offers full customization, minor customization, and flexible options based on samples or designs.
Certified Manufacturer: ISO 9001:2015, ISO 14001:2015, and OHSAS 18001:2007 certified with professional QA/QC inspectors.
3-Year Warranty & Support: Includes a 3-year warranty and on-site training services to ensure long-term operational success.
Advanced Digital I/O: Features 8 digital inputs and 4 digital outputs with high-speed isolation and precise time accuracy.

Company profile

Haomai Electric Power Automation Co., Ltd.
Cooperated with Fortune 500Self-brandedOEM ServicesR&D Capabilities
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 4 Years CertifiedNearest Port: Shenzhen PortAverage Response Time: ≤2.57h

About Our Factory & Business Background

AddressHaomai Building No. 1, Wuhan University Science Park Road, East-Lake Hi-Tech Development District, Wuhan, Hubei, China
Plant Area6712 square meters
Number of Employees149
Registered Capital110,000,000 RMB
Terms of PaymentT/T
International Commercial Terms(Incoterms)CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Set
Supply Chain Partners3000

Our Production Capability & Technical Expertise

Main ProductsCT PT Analyzer, Relay Protection Test System, Substation DC System Tester, Battery Test System
Production Lines3
Production MachinesAssembling Lines, Debugging Lines, Aging Testing Lines
QA/QC inspectors8 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers35 people
Traceability of Raw MaterialsYes
Test Reports for Raw MaterialsOthers
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment1999-07-27
Main MarketsSoutheast Asia/ Mideast, Domestic
Number of Foreign Trading Staff3
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO14001, ISO45001:2018

Product Q&A

Q:What is the warranty period and after-sales service?
A:
We provide a 3-year warranty and offer on-site training services to ensure proper operation and maintenance.
Q:Can the product be customized?
A:
Yes, we offer full customization, minor customization, and flexible customization options based on samples or designs.
Q:What is the minimum order quantity (MOQ)?
A:
The minimum order quantity is 1 set, allowing for easy procurement for individual or small-scale testing needs.
Q:What are the payment terms?
A:
The standard terms of payment are T/T (Telegraphic Transfer).
Q:What is the lead time for production?
A:
The average lead time is within 15 workdays for both peak and off-peak seasons.

Send Inquiry

*To:Haomai Electric Power Automation Co., Ltd.Haomai Electric Power Automation Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Advanced 6-Phase Current Injection Testing Kit for Substations
Made-in-China.com
Menard Pressure Meter Kit for Field Testing
Made-in-China.com
in-Situ Pressuremeter Tool Kit for Soil Testing

in-Situ Pressuremeter Tool Kit for Soil Testing

US$7,000.00-7,200.00
1 Piece(MOQ)
Made-in-China.com
Uhv-1200 Portable AC DC 6 Phase Protection Relay Test Kit
Made-in-China.com
ASTM D2172 Reflux Extractor Testing Kit for Laboratories
Made-in-China.com
ASTM D2509 Timken Ok Load Test Kit for Lubricating Grease
Made-in-China.com