Powered by Made-in-China.com
High-Efficiency Soft Drink Production Line with Automated Packing
US$65,000.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
SupportWarranty
12 MonthsType
Volumetric Filling MachineAutomatic Grade
AutomaticMaterial Type
LiquidFilling Valve Head
Multi-HeadFeed Cylinder Structure
Multi-Room FeedingDosing Device
Capacity CupFilling Principle
Isobaric FillingPackaging Container Lifting Structure
Pneumatic LiftingStructure
RotaryPackaging
CanPackaging Material
PlasticKeyword
Carbonated Soft Drink Filling MachineCapacity
2000-20000bphFilling Valve Type
Isobaric FillingApplicable Bottle
Aluminum CanApplicable Can Model
#200, #202, #206Suitable Product
Carbonated Soft DrinkApplicable Can Material
Tin Can, Aluminum Can, Pet CanDelivery Time
90 DaysCustomize
YesDimensions
2500*2000*2000Material
Stainless Steel 304/316Power
2.2kwWeight
3tModel
Dygf 20-4Brand
Hao PakTransport Package
Wooden CaseSpecification
DYGF 20-4Trademark
Hao PakOrigin
ChinaHS Code
8422301090Production Capacity
5 Sets Per MonthKey features
Customizable Production Capacity: Available in 5 models ranging from 60 to 400 CPM to suit different production needs.
1-Year Warranty Coverage: Includes free spare parts and delivery fees for easy broken items during the warranty period.
Stainless Steel Construction: Constructed with imported 304 stainless steel joints and polished to 0.4 roughness for hygiene.
Online Volume Adjustment: Filling volume can be adjusted on-line without shutting down the machine.
Comprehensive Installation Support: Engineers sent to plant for installation and staff training with 10-25 days duration.
Versatile Can Compatibility: Supports #200, #202, #206 models made of Tin, Aluminum, or PET materials.
High Automation Level: Features CIP automatic control and no operator action required after startup.
Company profile

Business Type: Manufacturer/FactoryExport Year: 2010-03-01Nearest Port: Shanghai PortAverage Response Time: ≤2.06hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DDP, DAP
About Our Factory & Business Background
AddressNo. 310, Renmin Road, Leyu Town, Zhangjiagang City, Suzhou, Jiangsu, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsFilling Machine, Labeling Machine, Packing Machine, Shrink Wrapper Machine, Palletizer, Bottling Machine, Beverage Filling Line
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Southeast Asia, Africa, Mid East, Eastern Asia
Product Q&A
Q:How about the spare parts?
A:
We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.
Q:How long time for installation?
A:
According your machines order,we will send one or two engineers to your plant for installation, it will take about 10 days to 25 days.
Q:How to install my machines when it arrives? how much the cost?
A:
We will send our engineers to your factory to install the machines and train your staff how to operate the machines. Customer pay air tickets go and back, accommodation and USD80/day/person.
Q:When can I get my machine after I paid?
A:
Normally production time is around 30-60days, the exactly date depend on what kind of machine you order. The shipping time is based on your destination port.
Q:What's your guarantee or the warranty of the quality if we buy your machines?
A:
We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Send Inquiry
*To:
Zhangjiagang Hao Pak Machinery Co., Ltd.
Zhangjiagang Hao Pak Machinery Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
High-Efficiency Carbonated Can Filling Line for Soft Drinks- Beverage Carbonated Canning Line & Canned Soda Production Line
US$10,000.00-40,000.00
1 Piece(MOQ)
Advanced Soft Drink Filling Line for Rapid Production Efficiency
US$5,000.00-20,000.00
1 Set(MOQ)
High Efficiency Soda Drink Filling Line Energy Manufacturing Soft Production Machine
US$10,000.00-40,000.00
1 Piece(MOQ)
Automatic Bottle Sparkling Water Soft Drink Filling Packing Production Line
US$5,000.00-200,000.00
1 Set(MOQ)
Automated Energy Drink Production Line with Labeling System
US$5,000.00-20,000.00
1 Set(MOQ)
High Speed Bottle Carbonated Soft Drinks Bottling Line with Ce
US$20,000.00
1 Piece(MOQ)
High-Efficiency Water Production Line with Automatic Washing System
US$12,000.00-120,000.00
1 Set(MOQ)
High Efficiency Carbonated Soft Drinks Production Line Sparkling Water Filling Equipment Custom Capacity
US$13,000.00-30,000.00
1 Piece(MOQ)
Automated Beer Production Line with Precision Filling Technology
US$5,000.00-20,000.00
1 Set(MOQ)
Fully-Automatic 5-Gallon Water Filler with Rinsing Capping - High Efficiency Production Line
US$8,000.00-150,000.00
1 Piece(MOQ)
High-Efficiency Carbonated Drink Filling Line for Fast Production
US$5,000.00-20,000.00
1 Set(MOQ)



















