Powered by Made-in-China.com

T38 Half Bridge Full Bridge Crossover Coupling Threaded Pipe Coupling Sleeve
US$10.29-20.59
1 Piece
Sample price:US$10.29/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
ProvidedWarranty
1 YearsModel NO.
T38 L190Certification
CEStandard
GBSurface Treatment
Spray-PaintManufacturing Process
ForgingMaterial
Cast SteelMining Object
Mining, Drilling, etc.Transport Package
Wooden Box & CartonSpecification
As per customers' requirements All SizesTrademark
HardROCOrigin
ChinaHS Code
8207509000Production Capacity
500000PCS/MonthKey features
Customization Available: Offers full, minor, and flexible customization from samples or designs.
CE Certified Quality: Meets CE standards with 100% visual and function inspection before dispatch.
Fast Stock Delivery: Items in stock can be shipped in 2-3 days, while production takes 25 days.
Free Replacement Policy: Free replacement provided for any product issues confirmed to be quality-related.
24-Hour Response Time: Dedicated sales team addresses inquiries within 24 hours, excluding holidays.
Versatile Application: Ideal for rock drilling, blasting, quarries, coal mines, and construction projects.
Professional Engineering: Forged cast steel construction ensures high penetration rate and tool life.
Flexible Payment Options: Accepts T/T, Western Union, L/C at sight, LC, D/P, and PayPal.
Company profile
Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 years CertifiedNearest Port: Shanghai Port CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressRoom 368, No. 211, Futebeilu, China(Shanghai) Pilot Free Trade Zone, Shanghai, China
Plant Area10 square meters
Number of Employees5
Registered Capital1,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 pcs
Supply Chain Partners120
Our Production Capability & Technical Expertise
Main ProductsRock Drill Tools, Top Hammer Tools, DTH Tools, Rotary Tools, RC Tools
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2020-04-16
Main MarketsEurope, Southeast Asia/ Mideast, East Asia(Japan/ South Korea), Australia
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What are the payment methods?
A:
We accept T/T (Telegraphic Transfer), Western Union, L/C at sight, LC, D/P, PayPal, and small-amount payments.
Q:What is the production lead time?
A:
Typically 25 days depending on order quantity. Items in stock can be shipped in 2-3 days. Peak season lead time is 1-3 months, off-season within 15 workdays.
Q:How are samples and bulk orders shipped?
A:
Samples are sent via courier (DHL, UPS, TNT, FEDEX) or air freight. Bulk orders use air or sea freight to balance cost and speed.
Q:What is the warranty and after-sales service?
A:
We provide a 1-year warranty. After-sales includes 24-hour inquiry response, technical support, and free replacement for confirmed quality issues.
Q:Is customization available for this product?
A:
Yes, customization is available. We offer full customization, minor customization, and flexible customization from samples or designs.
Send Inquiry
*To:
Hardroc International Trading (Shanghai) Co., Ltd
Hardroc International Trading (Shanghai) Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Mining Drilling Tools R32 T38 T45 T51 Full/Semi Bridge Threaded Rod Coupling Sleeve for Drill Rods
US$20.00-25.00
1 Meter(MOQ)
Mining Rock Drilling R32, R38, T38, T45, T51 Coupling Sleeves
US$20.00-25.00
1 Meter(MOQ)
T38 Crossover Coupling Sleeve for Quarrying and Construction with Yk05 Carbides
US$50.00-200.00
20 Pieces(MOQ)
T38*190 55mm Rod Coupling Sleeves for Extension Rod for Mining Rock Drilling
US$20.00-25.00
1 Meter(MOQ)
Full-Bridge Coupling Sleeve for Superior Rock Drilling Applications
US$50.00-1,000.00
10 Pieces(MOQ)
T38 -T38/R32 Connecting Extension Drill Rod Thread Coupling Sleeve
US$20.00-25.00
1 Meter(MOQ)
T51 Drill Pipe Coupling Sleeve for Rock Drilling and Mining Equipment
US$50.00-200.00
20 Pieces(MOQ)
Threaded Coupling Sleeve for Rock Drilling and Mining Applications with Yk05 Carbides
US$50.00-200.00
20 Pieces(MOQ)
R32 T38 170mm Drill Rod Adapter Threaded Coupling Sleeve
US$19.53
1 Piece(MOQ)
T51 Crossover Coupling Sleeve for Rock Drilling and Quarrying
US$50.00-200.00
20 Pieces(MOQ)
Drill Coupling Sleeve T38 T45 T51 for Mining Equipment Parts
US$50.00-1,000.00
10 Pieces(MOQ)
Half Bridge Threaded Pipe Coupling Sleeves for Industrial Tunnel Machinery
US$10.29-20.59
1 Piece(MOQ)
Maxdrill T51-T45 Half Bridge Full Bridge Crossover Coupling Threaded Pipe Coupling Sleeve
US$18.86-253.10
50 Pieces(MOQ)
Coupling Sleeves T38 55mm 190mm Connection Drill Rod Coupling
US$21.22
1 Piece(MOQ)
Maxdrill China High Efficiency T38 T45 Crossover Coupling Sleeve L215mm
US$23.50
50 Pieces(MOQ)
R38*T38 Coupling Sleeves for Efficient Rock Drilling Equipment
US$25.37
1 Piece(MOQ)
T38 T45 T51 Threaded Pipe Sleeve Type Coupling for Extension Rod
US$20.00
1 Piece(MOQ)
High-Quality Threaded Coupling Sleeve for Rock Drilling Tools
US$50.00-1,000.00
10 Pieces(MOQ)
Thread Coupling Sleeves T38*R32 247mm D57mm for Connecting Drilling Rod
US$26.60
1 Piece(MOQ)
Wear-Resistant Threaded Pipe Coupling Sleeves for Drill Tunnel Machinery
US$10.29-20.59
1 Piece(MOQ)



















