Powered by Made-in-China.com
Low Price Galvanized Metal Steel Plank Decking Walk Board Construct Scaffolding Plank
US$7.20
50-499 Pieces
US$6.50
500-999 Pieces
US$6.30
1,000-4,999 Pieces
US$5.20
5,000+ Pieces
Sample price:US$20.00/piece.Request sample
Product profile
Customization
AvailableConnection Type
Snap-on ConnectionFinish
GalvanizedMaterial
SteelTransport Package
PackagingSpecification
Width: 210mm, 225mm, 250mm, 300mmOrigin
Hebei HengshuiKey features
Customizable Dimensions: Available in lengths from 1M to 4M, with custom sizes supported.
High Durability: Designed for over 5 years of repeated use in construction projects.
Enhanced Safety Grip: Features hole punching design for better grip and safer usage.
OEM Service Available: Supports full customization from samples, designs, and minor adjustments.
Versatile Application: Ideal for buildings, bridges, halls, and mechanical installation platforms.
Galvanized Finish: Hot-dip galvanized surface treatment for anti-corrosion protection.
Quality Certified: ISO9001-2000 certified with 100% QC testing before shipment.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤3.78h
AI-Powered supplier vetting
SummaryThe supplier is identified as a manufacturing factory located in Anping County, Hengshui City, China. It reports broad customization capabilities, OEM service for well-known brands, inventory capability, and average lead times within 15 workdays in both peak and off-seasons. However, the evidence also shows material process gaps: no valid manufacturing-capacity contract with related subcontractors, no overseas warehouse, showroom, agents, branches, or overseas-service countries, and no offline trade-show participation. R&D evidence is weak because no new products were developed in the past year and ODM services are unavailable. Quality controls include quality assurance and material checks, but there is no raw-material traceability, no written complaint-handling procedure, and verbal-only workshop documentation. Financial and sustainability information is recorded only by year labels or as unknown statuses, so credibility and compliance cannot be fully assessed.
Supplier typeThe supplier is explicitly classified as a factory, located in Anping County, Hengshui City, and associated companies are in manufacturing. It also reports inventory capability, but lacks a valid manufacturing-capacity contract with related subcontractors.
After-Sales capabilityThe supplier has no written procedures or records for service-capability assessment, corrective and preventive actions, or complaint handling. It also has no overseas warehouse, showroom, agents, branches, or overseas-service countries, although some supplier names were provided and inventory capability is reported.
R&D capabilityThe supplier reports no available SDK, no new products during the past year, and no ODM service. While it supports customization from samples and designs, the provided evidence does not demonstrate active product innovation or strong R&D development.
Production capacityThe supplier reports inventory capability and lead times within 15 workdays in both peak and off-seasons, with six qualified service-capability suppliers and access proximity to Tianjin Port. However, it has no valid manufacturing-capacity contract with related subcontractors, limiting assurance over formal production capacity management.
Customization capabilityThe supplier explicitly supports customization from samples, designs, full customization, minor customization, and flexible customization. These capabilities are stated in both design-service and R&D-related records, indicating broad customization coverage.
Product Q&A
Q:Are you a manufacturer or trader?
A:
We are 100% manufacturer. You can come and visit my factory.
Q:What are your payment terms?
A:
T/T 30% as deposit, and 70% before delivery.
Q:What is the delivery time?
A:
Delivery within 15-30 days after receipt of deposit or L/C at sight. It depends on product and quantity.
Q:What is your packing method?
A:
We use steel strip and pack it sturdily. We can also pack according to customer's requirements.
Q:Can you provide samples?
A:
We can provide samples according to your requirements, but the customer must pay the cost of the samples. We will refund the sample fee after the bulk order is confirmed.
Send Inquiry
*To:
Hebei Derfon Building Materials Co., Ltd
Hebei Derfon Building Materials Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Price Cheap Scaffolding Tower Scaffolding Plank Wallking Board Steel Metal Plank Deck Global Sale
US$13.00-20.00
100 Pieces(MOQ)
Reliable OEM Fewer Components Hot-DIP Galvanized Metal Scaffolding Planks for Commercial Buildings
US$1,100.00-1,350.00
20 Tons(MOQ)
Durable Lightweight Q235 Pre-Galvanized Steel Scaffold Deck Board Platform Plank
US$10.00-20.00
500 Pieces(MOQ)
Standard 225mm Width Galvanized Metal Scaffolding Plank Catwalk for Ladder Frame System
US$10.00-20.00
500 Pieces(MOQ)
Reliable OEM Q345 Steel Scaffold Ringlock Metal Scaffolding Planks for Shopping Malls
US$1,100.00-1,350.00
20 Tons(MOQ)
Pre-Galvanized Box Type Scaffolding Metal Plank
US$400.00-700.00
20 Tons(MOQ)
Reliable OEM Strict Quality Control Q345 Steel Scaffolding Accessories Metal Scaffolding Planks
US$1,100.00-1,350.00
20 Tons(MOQ)
Building Steel Scaffolding Plank Hot DIP Galvanized Construction Scaffolding Metal Scaffold Plank with Hooks
US$14.80-15.80
200 Pieces(MOQ)
OEM Q235 Heavy-Duty Galvanized Scaffolding Metal & Steel Planks
US$5.20-7.20
50 Pieces(MOQ)
Direct Source Factory Scaffolding Walk Board Steel Plank with Hooks
US$10.00-20.00
500 Pieces(MOQ)
BS1139 Galvanized Steel Planks Steel Scaffold Platform Plank Frame Metal Deck
US$5.20-7.20
50 Pieces(MOQ)
Reliable Heavy Duty Q345 Steel Metal Scaffolding Planks for Wind Power Projects
US$1,100.00-1,350.00
20 Tons(MOQ)
Scaffolding Tower Scaffolding Plank Wallking Board Steel Metal Plank Deck
US$13.00-20.00
100 Pieces(MOQ)
Heavy Duty Construction Galvanized Steel Scaffolding Plank Metal Board
US$5.20-9.00
1 Piece(MOQ)
Pre-Galvanized Q235 Steel Scaffolding Walk Board Metal Plank with Hooks
US$10.00-20.00
500 Pieces(MOQ)
Derfon Factory Steel Scaffold Board Metal Plank with SGS Certificate
US$6.80-10.80
100 Pieces(MOQ)
High Quality Metal Scaffolding Board Galvanized Steel Plank with Hook Sale Well
US$13.00-20.00
100 Pieces(MOQ)
Hot DIP Galvanized Steel Deck Scaffolding Planks
US$5.00-10.00
1,000 Pieces(MOQ)
Anti Rust HDG Metal Steel Plank Scaffold Planks for Scaffolding
US$400.00-700.00
20 Tons(MOQ)
Galvanized Steel Scaffold Plank Boards Wholesale BS1139 Construction Platform
US$5.20-9.00
1 Piece(MOQ)



















