Powered by Made-in-China.com
Welded Tee Carbon Steel Tee Equal Tee for Pipeline Projects with GB/T 12459 ASTM A234 Wpb Sch40 Epoxy Coated
US$1.00-9,999.00
100 Pieces
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
1yearModel NO.
CustomizedType
Equal Reducing Angle Horizontal AxialConnection
Welding Female Male Flange Press ConnectionMaterial
Stainless Steel Carbon Steel AlloyShape
Reducing Tee Equal TeeLateral
90°Tee 30°Tee 45°Tee Wye TeeHead Code
Round Square Hexagon RotundityWall Thickness
CustomizedFinish
Natural Color, Varnished, Black Painting, etcTechnics
Forged Casting WeldedPressure Rating
CustomizedStandard
ASME / En / DIN / GOST /JISSize Range
Nps 1/2"-24" Seamless, Nps 16"-60"WeldedEnd Connection
Bevel End (Be) / Butt WeldCarbon Steel
ASTM A234 Wpb, Wpl6, Wphy42-Wphy80Stainless Steel
ASTM A403 Wp304/304L, Wp316/316L, Wp321Alloy Steel
A234 Wp11, Wp22, Wp5, Wp9, Wp91Transport Package
Plywood Case / Plywood PalletSpecification
CustiomizedTrademark
FM or OEMOrigin
ChinaCompany profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs CertifiedExport Year: 1year CertifiedNearest Port: Tianjin Port CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressDonglin Bridge, South of De Lin Village, Daolin Village, Xindian Town, Mengcun Hui Autonomous County, Cangzhou, Hebei, China
Plant Area2800 square meters
Number of Employees10
Registered Capital2,000,000 RMB
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: one month, 1-3 months Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity500pcs
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsFlange, Elbow, Tee, Reudcer
Production Lines2
Production MachinesCNC Lathe, Drilling machine, Pressing machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2026-05-11
Main MarketsDomestic
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff1
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Send Inquiry
*To:
Hebei Fengmei Flange Fittings Co., Ltd.
Hebei Fengmei Flange Fittings Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
ASME B16.9 A234 Wpb Seamless Carbon Steel Sch80 Sch160 Welded Pipe Fitting Equal Tee
US$0.50-1.00
100 Pieces(MOQ)
Carbon Steel Wpb/A234 Welded 45 Degree Lateral Equal/Reducing Tee Pipe Fitting
US$10.00
1 Piece(MOQ)
Industrial Wholesale Chemical Processing Seamless Stainless Steel Equal Tee
US$0.10-100.00
1 Piece(MOQ)
Carbon Steel Black Painted Seamless Pipe Fittings Equal Reducing Tee
US$0.50-2.00
10 Pieces(MOQ)
Butt Welded Seamless Pipe Fitting Seamless Carbon Steel Tee
US$4.00-5.00
5 Pieces(MOQ)
Carbon Steel Tee Reducing Tee Butt Weld Tee for Oil & Gas with ASTM A234 Wpb Sch40 Beveled End
US$1.00-9,999.00
100 Pieces(MOQ)
Factory Supply Carbon Steel Reducing Tee 3*3*2 Bw Butt Welded Tee 8" 10" 12" Seamless Straight Equal Tee
US$2.98-3.25
50 Pieces(MOQ)
Carbon Stainelss Steel Butt Welded Three Way Fitting Pipe Fittings Equal Tee
US$1,200.00-3,000.00
1 Ton(MOQ)
DN150 Weld-on Hot Tapping Split Tee for Pipeline Solutions
US$5,500.00-6,500.00
1 Piece(MOQ)
High-Quality Stainless Steel Seamless Tee for Chemical Pipelines
US$0.10-100.00
1 Piece(MOQ)
Customized En545 Cast Iron Tee Pipe Fitting Loosing All Flanged Equal Tee for Pipeline
US$1,150.00-1,200.00
1 Ton(MOQ)
High Pressure Tee Seamless Tee Carbon Steel Tee for Petroleum Pipelines with ASTM A860 Mss Sp-75 Sch80 NDT Tested
US$1.00-9,999.00
100 Pieces(MOQ)



















