SourcingAI
Try for free
Powered by Made-in-China.com
High-Quality EPS Foam Cup Molding Machine for Efficient Production
US$8,000.00-20,000.00
1 Set

Product profile

Customization

Available

After-sales Service

2 Years

Warranty

2 Years

Model NO.

2496

Product Type

HDF Production Line

Automatic Grade

Automatic

Power Source

Electric

Screw Design

Double-Screw

Certification

CE, ISO

Condition

New

Customized

Customized

Core Components

PLC, Other

Raw Material

EPS Raw Material

Color

Customerized Color

Material

Steel Structure

Specification

5300x2300x4600mm

Trademark

Guangxing

Origin

China

HS Code

84778000

Production Capacity

50 Sets Per Month

Key features

Advanced Control System: Integrated Siemens PLC and Chinese touch screen for automatic production and self-protection.
Dual Steam System: Equilibrium valve ensures stable steam and temperature with reduced consumption.
Hydraulic Power System: Fast/slow differential system ensures precise mold opening/closing and stable operation.
Optional Vacuum System: Accelerates shaping speed, reduces cooling time, and lowers product water content.
Customizable Color: Customerized color options available to meet specific design requirements.
Versatile Product Range: Produces EPS foam boxes, ICF blocks, helmets, ceiling boards, and decorative cornices.
Multiple Heating Methods: Various heating methods optional to adapt to different product forms and ensure quality.
International Certifications: CE and ISO certified with 100% inspection for finished products.

Company profile

Hebei Guangxing Machinery Technology Co., Ltd.
Importers and ExportersExperienced TeamFull CustomizationProduct Certification
CertifiedBusiness Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 18 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤15h

AI-Powered supplier vetting

SummaryHebei Guangxing Machinery Technology Co., Ltd. is a technology-driven small enterprise with a focus on manufacturing and exporting thermal insulation materials. Despite holding ISO9001:2015 and CE certifications, the company faces limitations in financial credibility and innovation, with no new product launches and limited collaboration with major companies. The supplier has robust customization capabilities but lacks significant after-sales service and production capability, including overseas presence and effective manufacturing contracts.
Supplier typeThe supplier is a small technology enterprise involved in manufacturing and exporting thermal insulation materials and related products.
CertificationsThe supplier holds ISO9001:2015 and CE certifications, indicating compliance with quality and product standards.
R&D capabilityThe supplier has no SDK availability and did not launch any new products last year, limiting its innovation capabilities.
Production capacityThe supplier does not have valid manufacturing contracts or overseas warehouses, impacting production capabilities.
Customization capabilityThe supplier offers extensive customization services, including full and minor customizations.

Product Q&A

Q:Where is the factory located?
A:
We are located in Xinji, Hebei Province, near Beijing airport. You could fly to Beijing Airport, we could pick you there.
Q:Do you accept on-site inspection to check your machine and your factory?
A:
Before shipment, every equipment will be trail tested in our factory, we invite all the client to do on-site inspection during trail testing.
Q:What payment terms do you prefer?
A:
T/T, L/C, West Union, Cash etc.
Q:How long is the validity of quotation?
A:
Generally, our price is valid within one month from the date of quotation . The price will be adjusted appropriately according to the price fluctuation of raw materials and changes in market .
Q:What is your delivery time?
A:
Usually, we make merchandise inventory, if we have the products in stock, the delivery time is 5-10 days after receiving the deposit. If we don't have the products in stock, we will arrange the production right now, the delivery time will be 1-3 month,It depend on the order quantity.

Send Inquiry

*To:Hebei Guangxing Machinery Technology Co., Ltd.Hebei Guangxing Machinery Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like