Powered by Made-in-China.com

Ecp PVC Plastic Formwork System for Construction
US$28.00
500 Square Meters
Product specifications
Cross-sectional
Sample price:US$30.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
2 WeeksWarranty
2 WeeksModel NO.
300X55, 400x55, 500x55.Surface Treatment
NoTechnics
SqueezeMaterial
PlasticType
Insulating TapeMOQ
100m2Lead Time
Two WeeksColor
WhiteWater Absorption Rate
<=0.5&Turnover Times
50-100 TimesManufacturing Process
EcpTransport Package
PalletSpecification
300X55, 400x55, 500x55.Trademark
HLOrigin
Hebei ChinaHS Code
392190Key features
Green and environmentally friendly, recyclable and renewable
Flame-retardant, no waste, and cost reduction
Easy to Install, Do not deform
Waterproof and anti-corrosion
High strength and toughness
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 20 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤4.91h
About Our Factory & Business Background
AddressBoling Building 120 Bailin South Road Shijiazhuang, Shijiazhuang, Hebei, China
Plant Area40 square meters
Number of Employees4
Registered Capital500,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 container
Supply Chain Partners8
Our Production Capability & Technical Expertise
Main ProductsTie Plate, Pin, Wedge, Bolt, Nut, Hollow Pin, Galvanized Wedge, Long Pin, Curved Wedge, Form Clip Left, Form Clip Right, Waler Clamp
R&D Engineers1 people
Our Industry Experience & Global Business Record
Year of Establishment2003-08-15
Main MarketsSouth America, Southeast Asia/ Mideast, East Asia(Japan/ South Korea), India
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What material is this made of?
A:
Improved PVC, Improvement means altering the original performance, adding some materials such as strength, impact resistance, and oxidation resistance, so that it is not soft in summer and not brittle in winter, and has a stronger load-bearing capacity
Q:Can the length be chosen randomly?
A:
yes, It can be cut into any length as needed
Q:Can it be used in combination with aluminum formwork or wood formwork?
A:
Through our independently developed accessories, it can be well combined with aluminum formwork and wooden formwork for use
Send Inquiry
*To:
Hebei Hualin International Trade Co., Ltd.
Hebei Hualin International Trade Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Durable Steel Formwork Systems for Reliable and Efficient Construction Practices Reusable Adjustable Plastic Beam Column Slab Steel Formwork
US$79.00-129.00
100 Square Meters(MOQ)
Heavy Duty Steel Formwork Systems for Reliable Building Practices Reusable Adjustable Plastic Beam Column Slab Steel Formwork
US$79.00-129.00
100 Square Meters(MOQ)
Early Stripping Durable Steel Formwork System for Efficient Concrete Construction Solutions
US$90.00-120.00
1,000 Pieces(MOQ)
Customizable Steel Formwork System for Versatile Building Applications Reusable Adjustable Plastic Beam Column Slab Steel Formwork
US$79.00-129.00
100 Square Meters(MOQ)
Innovative Economic Formwork System for Fast Construction Solutions
US$79.00-129.00
100 Square Meters(MOQ)
High-Strength Modular Concrete Formwork System for Efficient Apartment Construction
US$90.00-120.00
500 Pieces(MOQ)
Durable Steel Formwork Panel System for Heavy Duty Concrete Construction
US$90.00-120.00
250 Pieces(MOQ)
Galvanized Ringlock System for Concrete Construction
US$350.00-450.00
300 Meters(MOQ)
Durable Steel Formwork System for Efficient Concrete Construction Solutions
US$90.00-120.00
1,000 Pieces(MOQ)
Post Tension Flat Anchorage System for Prestressed Concrete Slab Construction
US$1.50-5.00
10 Pieces(MOQ)
Magnetic Formwork Shuttering System for Edge Formwork
US$380.00-400.00
10 Pieces(MOQ)
Full Set External Prestressing Cable System for External Bridge Engineering Construction
US$500.00-600.00
3 Tons(MOQ)
High Performance Seismic Isolation Systems for Construction
Negotiable
2 Pieces(MOQ)
Modular Scaffold System for Safety and Convienience
US$350.00-450.00
300 Meters(MOQ)
Advanced Precast Post Tension Anchorage System for Construction
US$1.50-5.00
10 Pieces(MOQ)
Bridge Construction Prestressed Anchorage System for PC Strand Post Tensioning
US$1.50-5.00
10 Pieces(MOQ)
Construction Accessories Concrete Wall Forms D Type Form Tie System
US$0.07-0.49
5,000 Pieces(MOQ)
Non-Excavation Trenchless Pipe Repair Retreatment Jacks for Municipal Sewage Systems
US$803.00-815.00
1 Piece(MOQ)
Magnetic Formwork System for Precast Concrete Production
US$100.00-120.00
10 Pieces(MOQ)
Aluminum Alloy Monorail Bmu System for Facade Cleaning Facade Access Equipment
US$2,450.00-2,500.00
1 Piece(MOQ)




















