Powered by Made-in-China.com

One Piece Waler Clamp Closed
US$1.20-4.00
1,000 Pieces
Product profile
Customization
AvailableAfter-sales Service
2 WeeksWarranty
2 WeeksModel NO.
2"X4" 2"X6"Application
FormworkCertification
ISOSurface Treatment
YesTechnics
ForgedMaterial
SteelType
StandUsage
ConstructionCountry of Use
AmericaColor
Golden or Redwith Pallet
YesLead Time
3 WeeksTransport Package
Carton or BagSpecification
2"x4", 2X6"Trademark
HLOrigin
HebeiHS Code
7326Production Capacity
50000Key features
Versatile Installation: Simply insert bracket into side rail slot, place 2x4 lumber, and drop wedge to tighten.
Durable Steel Material: Constructed from forged steel with galvanized aluminum surface treatment for longevity.
ISO Certified Quality: Product meets international ISO certification standards for safety and reliability.
Flexible Customization: Offers full, minor, and flexible customization options based on samples or designs.
Custom Color Options: Available in Golden or Red colors to match specific project requirements.
Fast Lead Time: Standard lead time is 3 weeks, with off-peak delivery within 15 workdays.
Comprehensive Payment Terms: Accepts LC, T/T, D/P, PayPal, Western Union, and small-amount payments.
OEM and ODM Services: Factory supports both Original Equipment Manufacturer and Original Design Manufacturer services.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 20 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤9.19h
About Our Factory & Business Background
AddressBoling Building 120 Bailin South Road Shijiazhuang, Shijiazhuang, Hebei, China
Plant Area40 square meters
Number of Employees4
Registered Capital500,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 container
Supply Chain Partners8
Our Production Capability & Technical Expertise
Main ProductsTie Plate, Pin, Wedge, Bolt, Nut, Hollow Pin, Galvanized Wedge, Long Pin, Curved Wedge, Form Clip Left, Form Clip Right, Waler Clamp
R&D Engineers1 people
Our Industry Experience & Global Business Record
Year of Establishment2003-08-15
Main MarketsSouth America, Southeast Asia/ Mideast, East Asia(Japan/ South Korea), India
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the warranty period for this product?
A:
The warranty period is 2 weeks.
Q:What is the lead time for delivery?
A:
The standard lead time is 3 weeks. During off-peak seasons, it can be within 15 workdays.
Q:Can the product color be customized?
A:
Yes, the product is available in Golden or Red colors.
Q:What customization options are available?
A:
We offer customization from samples, designs, minor customization, full customization, and flexible customization.
Q:What are the payment terms?
A:
We accept LC, T/T, D/P, PayPal, Western Union, and small-amount payments.
Send Inquiry
*To:
Hebei Hualin International Trade Co., Ltd.
Hebei Hualin International Trade Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Concrete Formwork Symons Steel-Ply Formwork Clamp One Piece Waler Clamp
US$0.60-1.50
500 Pieces(MOQ)
Industrial Construction Formwork Anti-Deformation Metal Robust One Piece Waler Clamps
US$0.10-20.00
5,000 Pieces(MOQ)
Building Concrete Forming Symons Steel-Ply Formwork Painted One Piece Waler Clamp for Construction
US$0.60-1.50
500 Pieces(MOQ)
Concrete Forming Steel-Ply One Piece Waler Clamp
US$0.80-1.50
500 Pieces(MOQ)
EMT&Rigid One Piece Strut Clamp Cable Clamp Zinc Plated HDG Pipe Supports
US$0.05-5.00
5,000 Pcs(MOQ)
Factory Symons Concrete Form Steel-Ply Formwork Clamp One Piece Waler Clamp
US$0.60-1.50
500 Pieces(MOQ)
Steel Plywood Waler Clamp, One Piece Waler Clamp
US$2.00-4.00
10,000 Pieces(MOQ)
Galvanized One Piece Conduit Clamp Cable Clamp
US$0.05-5.00
5,000 Pcs(MOQ)
Galvanized Two Pieces Strut Pipe Clamps with Rubber for Pipeline Seismic Bracing Set
US$0.10-10.00
1,000 Pieces(MOQ)
One Hole Conduit Strap Clamp for Electrical Wiring Systems
US$0.10-0.32
200 Pieces(MOQ)
Two Pieces Screw Strut Pipe Clamp with Rubber
US$0.10-10.00
1,000 Pieces(MOQ)
Galvanized One Hole Pipe Support Clamp for Construction
US$0.10-0.32
200 Pieces(MOQ)
Heavy-Duty Aluminium Formwork Connect Square Tube Waler Bracket Clamp
US$0.35-0.75
2,000 Pieces(MOQ)
Waller Holder, Waler Clamp for Aluminium Formwork
US$0.896-0.899
2,000 Pieces(MOQ)
Manufacturer Customize Stable Galvanized Carbon Steel Rigid Conduit Strut Clamps Two Pieces Bracing Pipe Clamp
US$0.10-10.00
1,000 Pieces(MOQ)
Galvanized Steel One Hole Pipe Clamp for Wall Mounting
US$0.10-0.32
200 Pieces(MOQ)
Custom OEM Galvanized Factory Direct Sale Stable Two Pieces Shape Bracing Steel Universal Clamps
US$0.10-10.00
1,000 Pieces(MOQ)
Steel One Hole Strap Clamp for Conduit and Pipe Support
US$0.10-0.32
200 Pieces(MOQ)
EPDM Two Piece Rubber Lined Pipe Clamp Steel Zinc Plated
US$0.18-2.30
5,000 Pcs(MOQ)
Adjustable Steel Waler Clamp for Aluminium Formwork and Galvanized Bracket
US$0.001-0.20
1,000 Pieces(MOQ)



















