SourcingAI
Try for free
Powered by Made-in-China.com
Long Life Time Impact Idler
US$1.00
50 Pieces

Product profile

Customization

Available

Material

Steel

Application

Chemical Industry, Grain Transportation, Mining Transport, Power Plant, Coal Mining Industry, Cement, Harbor,etc

Structure

Ordinary Roller

Bearing Type

Double Sealed Bearing

Type

Grooved Conveyor Idler

Certificate

CE, ISO, BV, SGS, Ika, etc

Dia

60-219mm

Length

150-3500mm

Tube Material

S235jr

Shaft Material

Deep Drawn Steel C45(DIN)

Bearing

as Requested

Seal

Labyrinth Seal, Nylon 6

Waterproof and Dustproof Testing

Available

Lifetime

More Than 50000 Hours

Transport Package

Wooden Packing Case, Fumigation Before Loading

Specification

GB, ISO, Cema, DIN, JIS, etc

Trademark

Juxin

Origin

China

HS Code

8431390000

Production Capacity

5000PCS/Month

Key features

Extended Service Life: Operates for more than 50,000 hours under standard conditions.
Customizable Dimensions: Diameter ranges from 60mm to 219mm and length from 150mm to 3500mm.
Robust Bearing System: Equipped with double sealed bearings and single/double row deep groove ball bearings.
Advanced Sealing Technology: Features labyrinth seals and nylon 6 for superior waterproof and dustproof protection.
Wide Industry Application: Suitable for chemical, mining, cement, power plant, and harbor industries.
Diverse Surface Finishes: Available in ordinary painting, hot galvanized, electric static spraying, and baked painting.
Global Certification: Certified by CE, ISO, BV, SGS, and IKA standards.
Flexible Production Capacity: Standard output of 5000 pieces per week with urgent order acceptance.

Company profile

Hebei Juxin Conveyor Engineering Co., Ltd.
Years of Export ExperienceMulti-language PioneerExperienced TeamExhibition Experience
Business Type: Manufacturer/FactoryExport Year: 2003-05-01Nearest Port: Tianjin seaportAverage Response Time: ≤2.31hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, CFR, CIF, FCA, EXW

AI-Powered supplier vetting

SummaryHebei Juxin Conveyor Engineering Co., Ltd. is identified as a Chinese manufacturer/factory specializing in complete belt conveyor systems and components. It reports over 30 years of development, five production lines, stated output for conveyor systems, pulleys, brackets, and rollers, and exports to multiple global regions. The supplier demonstrates broad customization and ODM/OEM capabilities, documented quality-control procedures, product traceability, complaint-handling procedures, and service-capability corrective-action processes. However, the provided information does not establish formal certifications, overseas service infrastructure, recent new-product development, or sufficient evidence to assess financial strength. A trade-show participation record and OEM service for known brands provide limited evidence of market engagement and customer-related experience.
Supplier typeThe supplier is explicitly identified as a manufacturer/factory and a limited company based in Hebei, China. Its stated business focuses on complete belt conveyor systems and components, supported by dedicated design, production, quality-testing, and sales-service centers.
After-Sales capabilityThe company states that its operations include after-sales service and that it has clear, followed procedures and records for handling customer complaints. However, it reports no overseas agents, branches, warehouses, or showrooms, which limits evidence of localized overseas support.
Production capacityThe supplier reports five production lines and specified output for belt conveyor systems, pulleys, brackets, and conveyor rollers. Its production and processing center, quality-testing center, and broad export-market coverage support established manufacturing capability.
Customization capabilityThe supplier explicitly offers customization from samples, designs, full customization, minor customization, and flexible customization, and also provides ODM services. These statements directly demonstrate broad product-design and customization capability.

Product Q&A

Q:What is the expected service life of the idler?
A:
The idler is designed for a lifetime of more than 50,000 hours.
Q:Can the dimensions be customized?
A:
Yes, the diameter can be customized from 60mm to 219mm, and length from 150mm to 3500mm.
Q:What materials are used for the tube and shaft?
A:
The tube is made of S235jr or Q235 steel, and the shaft uses Deep Drawn Steel C45 (DIN) or 45# Steel.
Q:What type of bearings are installed?
A:
We use double sealed bearings, including single and double row deep groove ball bearings with C3 clearance.
Q:Is the idler waterproof and dustproof?
A:
Yes, it features a labyrinth seal and nylon 6, with available waterproof and dustproof testing.

Send Inquiry

*To:Hebei Juxin Conveyor Engineering Co., Ltd.Hebei Juxin Conveyor Engineering Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Long Life Time Return Idler

Long Life Time Return Idler

US$1.00
50 Pieces(MOQ)
Made-in-China.com
Long Life Time Rubber Disc Idler
Made-in-China.com
SPD Cema Conveyor Idler with Long Life-Span
Made-in-China.com
Long Time Working Conveyor Roller/Idler for Mining
Made-in-China.com
Impact Idler with Corrosion Resistance

Impact Idler with Corrosion Resistance

US$50.00-1,000.00
1 Set(MOQ)
Made-in-China.com
Impact Roller Buffer Roller Impact Idler
Made-in-China.com
Impact Zinc Stand Alignment Belt Cushion Idler
Made-in-China.com